← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Golden Garden Condominium
109-15 72 ROAD · BIN 4596904
💬 Discuss this project
2016Year Built
7Stories
RMBuilding Class
C4-4AZoning
26,229 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: No Report FiledFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: EAST BROADWAY REAL ESTATE HOLDING LLC · 6,920 sf lot · 3.79 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 112p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSTRUCTION MALL603/21/2026
EAST BROADWAY REAL ESTATE HOLDIN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COSTA ARCH & ENG LLP1002/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COSTA ARCHITECTURE & ENGINEERING LL2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHACO SPRINKLER LLCFire Protection107/08/2026
BNM CONSTRUCTION INCGeneral Contractor104/09/2026
MADISON CONSTRUCTION CONSGeneral Contractor107/08/2026
MARINO PLBG AND HTG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COSTA ARCHITECTS & ENGINE1321802/02/2026
Building Lifecycle
All (106)Filed (10)Permit Issued (4)Signed Off (3)Violation (41)Inspection (8)Objection (24)Special Inspection (16)
02/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2026
Special inspection requirement — Interior lighting power
ANGELO COSTA
02/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
02/07/2026
Special inspection requirement — Energy Code Compliance Inspections
ANGELO COSTA
02/07/2026
Special inspection requirement — Lighting controls
ANGELO COSTA
02/02/2026
Filed — Alteration CO
Application filed for installation of 1st floor Non- Bearing Partitions, new baths & the conversion of existing 1st floor health care facility to health care trade school.
Q01202037-P4
01/15/2026
Violation issued (FDNY_NOV, closed)
01/05/2026
Filed — Alteration CO
Application filed for installation of 1st floor Non- Bearing Partitions, new baths & the conversion of existing 1st floor health care facility to health care trade school.
Q01202037-P3
01/05/2026
Special inspection requirement — Lighting controls
ANGELO COSTA
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
01/05/2026
Special inspection requirement — Energy Code Compliance Inspections
ANGELO COSTA
01/05/2026
Special inspection requirement — Interior lighting power
ANGELO COSTA
11/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/29/2025
Signed off — Alteration
Herewith filing for 1st floor commercial space sprinkler heads.
Q01208204-S1
10/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/19/2025
Objection raised — Admin
09/19/2025
Objection resolved — Addressed
09/18/2025
Filed — Alteration
Herewith filing for 1st floor commercial space sprinkler heads.
Q01208204-P4
09/17/2025
Filed — Alteration CO
Application filed for installation of 1st floor Non- Bearing Partitions, new baths & the conversion of existing 1st floor health care facility to health care trade school.
Q01202037-P1
09/09/2025
Special inspection requirement — Lighting controls
ANGELO COSTA
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
ANGELO COSTA
09/09/2025
Special inspection requirement — Interior lighting power
ANGELO COSTA
09/08/2025
Signed off — Alteration
Q01228306-I1
09/08/2025
Permit issued — General Construction
Q01202037-I1-GC
09/08/2025
Special inspection requirement — Sprinkler Systems
Paul Antonio
09/05/2025
Signed off — Alteration
Herewith filing for 1st floor commercial space sprinkler heads.
Q01208204-I1
08/27/2025
Filed — Alteration
Q01228306-P1
08/27/2025
Objection resolved — Addressed
08/20/2025
Objection raised — Cost
08/20/2025
Objection resolved — Addressed
07/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
07/10/2025
Filed — Alteration
Herewith filing for 1st floor commercial space sprinkler heads.
Q01208204-P2
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
06/30/2025
Special inspection requirement — Final
George Paider
06/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2025
Permit issued — Plumbing
Q01208204-I1-PL
05/22/2025
Permit issued — General Construction
Q01228306-I1-GC
05/20/2025
Permit issued — Sprinklers
Q01208204-S1-EW-SP
05/19/2025
Filed — Alteration
Q01228306-I1
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
04/25/2025
Objection raised — Inspections
04/25/2025
Objection raised — Accessibility
04/25/2025
Objection raised — Admin
04/25/2025
Objection raised — Accessibility
04/25/2025
Objection raised — Structural
04/25/2025
Objection raised — Accessibility
04/25/2025
Objection raised — Zoning
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBNM CONSTRUCTION INC09/08/2025
DOB NOWPlumbingSigned-offMARINO PLBG AND HTG, INC06/05/2025
DOB NOWGeneral ConstructionSigned-offMADISON CONSTRUCTION CONS05/22/2025
DOB NOWSprinklersSigned-offALPHACO SPRINKLER LLC05/20/2025
BISPLISSUEDQMB PLUMBING & HEATING INC10/17/2019
BIS—RE-ISSUEDR & S CONSTRUCTION OF NY04/08/2019
BISEQISSUEDR & S CONSTRUCTION OF NY04/05/2019
BIS—ISSUEDR & S CONSTRUCTION OF NY10/18/2018
BISPLISSUEDQMB PLUMBING & HEATING INC08/14/2018
BISEQISSUEDR & S CONSTRUCTION OF NY08/13/2018
BIS—ISSUEDR & S CONSTRUCTION OF NY04/04/2018
BISEQISSUEDR & S CONSTRUCTION OF NY04/04/2018
BISEQISSUEDTRI BOROUGH SCAFFOLDING11/13/2017
BIS—ISSUEDR & S CONSTRUCTION OF NY08/28/2017
BISPLRE-ISSUEDQMB PLUMBING & HEATING INC08/09/2017
BISEQISSUEDR & S CONSTRUCTION OF NY06/07/2017
BIS—ISSUEDR & S CONSTRUCTION OF NY03/23/2017
BISEQISSUEDR & S CONSTRUCTION OF NY02/07/2017
BISEQISSUEDTRI BOROUGH SCAFFOLDING11/29/2016
BIS—ISSUEDR & S CONSTRUCTION OF NY09/06/2016
BIS—ISSUEDR & S CONSTRUCTION OF NY09/06/2016
BISEQISSUEDR & S CONSTRUCTION OF NY12/22/2015
BIS—ISSUEDR & S CONSTRUCTION OF NY12/22/2015
BIS—ISSUEDR & S CONSTRUCTION OF NY12/22/2015
BISEQISSUEDTRI BOROUGH SCAFFOLDING12/18/2015
4 projects · most recent 03/26/2026
General Wiring
FiledStatusContractorScope
03/26/2026CompleteSUPREME ELECTRIC CORPGeneral Wiring
11/19/2019CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
08/06/2018CompleteRIGHTWAY ELECTRICAL INC—
01/23/2018CompleteRIGHTWAY ELECTRICAL INC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
02/07/2026Interior lighting powerANGELO COSTAenergy_progress
02/07/2026Fire-Resistant Penetrations and JointsANGELO COSTAspecial
02/07/2026Energy Code Compliance InspectionsANGELO COSTAprogress
02/07/2026Lighting controlsANGELO COSTAenergy_progress
01/05/2026Lighting controlsANGELO COSTAenergy_progress
01/05/2026Fire-Resistant Penetrations and JointsANGELO COSTAspecial
01/05/2026Energy Code Compliance InspectionsANGELO COSTAprogress
01/05/2026Interior lighting powerANGELO COSTAenergy_progress
09/09/2025Lighting controlsANGELO COSTAenergy_progress
09/09/2025Fire-Resistant Penetrations and JointsANGELO COSTAspecial
09/09/2025Energy Code Compliance InspectionsANGELO COSTAprogress
09/09/2025Interior lighting powerANGELO COSTAenergy_progress
09/08/2025Sprinkler SystemsPaul Antoniospecial
07/14/2025Fire-Resistant Penetrations and JointsANGELO COSTAspecial
07/08/2025Fire-Resistant Penetrations and JointsANGELO COSTAspecial
06/30/2025FinalGeorge Paiderprogress
▾Documents — 247 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026Q01228306-P1Request digital key ↗
08/20/2026Q01228306-I1Request digital key ↗
08/18/2026Q01208204-P4Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION27
03/25/2025421087656Open ↗
03/07/2025421087656Open ↗
12/15/2020421087656Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION13
04/12/2019421087656Open ↗
04/11/2019421087656Open ↗
11/28/2018440276041Open ↗
Showing 3 of 13 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/17/2015421147574Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/23/2019421087656Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/13/2026Q01202037-P4Open ↗
08/13/2026Q01202037-P3Open ↗
08/13/2026Q01202037-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
10/15/2015421087656Open ↗
10/15/2015421087656Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01202037-I1Open ↗
08/13/2026Q01202037-P4Open ↗
▸BISZONING DIAGRAM1
12/05/2015421087656Open ↗
▸Seals & Professional Certifications48
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
02/10/2020421087656Open ↗
01/06/2020421087656Open ↗
01/06/2020421087656Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026Q01228306-P1Open ↗
08/27/2026Q01202037-P3Open ↗
08/27/2026Q01202037-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026Q01228306-I1Open ↗
08/18/2026Q01208204-S1Open ↗
08/18/2026Q01208204-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026Q01208204-I1Open ↗
08/28/2026Q01208204-P4Open ↗
08/27/2026Q01202037-P3Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/14/2017421298740Open ↗
12/15/2015440276041Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/15/2015440276041Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/14/2017421298740Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/15/2015440276041Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
10/04/2019421087656Open ↗
09/23/2019421087656Open ↗
08/01/2019421087656Open ↗
Showing 3 of 5 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
11/14/2019421087656Open ↗
11/12/2019421087656Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/06/2020421087656Open ↗
▸BISEQUIPMENT USE PERMITS1
01/06/2020421087656Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/07/2019421661650Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
10/15/2015421087656Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
09/14/2020421087656Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/31/2020421087656Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist4
08/13/2026Q01202037-P4Open ↗
08/13/2026Q01202037-P1Open ↗
08/13/2026Q01202037-P3Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
04/17/2015421147574Open ↗
03/21/2015421087656Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
01/31/2020421087656Open ↗
▸BISSTREET TREES SITE PLAN1
12/24/2015421087656Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/24/2015421087656Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/24/2015421087656Open ↗
▸Environmental & Asbestos11
▸DOB NOWOER: Notice of Satisfaction4
08/20/2026Q01228306-I1Open ↗
08/17/2026Q01202037-I1Open ↗
08/13/2026Q01202037-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/20/2026Q01228306-I1Open ↗
08/17/2026Q01202037-I1Open ↗
08/13/2026Q01228306-P1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
12/15/2015440276041Open ↗
11/13/2015421087656Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/18/2025421087656Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/06/2020421087656Open ↗
01/06/2020421087656Open ↗
02/18/2016421087656Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
01/06/2020421087656Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
12/15/2015440276041Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/06/2025421087656Open ↗
07/17/2020421087656Open ↗
07/17/2020421087656Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
12/12/2019421087656Open ↗
12/12/2019421087656Open ↗
12/24/2015421087656Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
01/03/2020421147574Open ↗
12/05/2019421298740Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
12/05/2015421087656Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/15/2015421087656Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/02/2015421087656Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/24/2015421087656Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
09/14/2020421087656Open ↗
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
01/13/2021421087656Open ↗
01/11/2021421087656Open ↗
10/19/2020421087656Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/15/2021421775617Open ↗
11/04/2020421775617Open ↗
10/19/2020421087656Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/15/2020421087656Open ↗
12/08/2020421087656Open ↗
04/25/2015421087656Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
04/17/2015421147574Open ↗
03/21/2015421087656Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
12/06/2019421087656Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
09/14/2020421087656Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
04/12/2019421087656Open ↗
12/24/2015421087656Open ↗
▸BISCOST AFFIDAVIT2
12/13/2019421661650Open ↗
08/09/2018421661650Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
01/06/2020421087656Open ↗
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION14
10/08/2020421087656Open ↗
01/23/2020421087656Open ↗
01/06/2020421087656Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET9
11/04/2020421775617Open ↗
10/29/2020421783868Open ↗
10/28/2020421775617Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM9
10/29/2020421783868Open ↗
01/06/2020421087656Open ↗
01/03/2020421147574Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/15/2015440276041Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/17/2015421147574Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification4
08/13/2026Q01202037-P3Open ↗
08/13/2026Q01202037-I1Open ↗
08/13/2026Q01202037-P4Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
10/28/2020421775617Open ↗
10/20/2015421087656Open ↗
—421087656Open ↗
▸BISPHOTOLUMINESCENT EXIT PATH MARKINGS2
03/21/2015421087656Open ↗
03/21/2015421087656Open ↗
▸BISPLOT DIAGRAM2
02/06/2020421087656Open ↗
03/21/2015421087656Open ↗
▸BISTCO FEE DUE1
01/13/2021421087656Open ↗