← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Golden Garden Condominium
109-15 72ND ROAD · Forest Hills · BIN 4596904
💬 Discuss this project
2016Year Built
7Stories
RMBuilding Class
C4-4AZoning
26,229 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: No Report FiledFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: East Broadway Real Estate Holding · 6,920 sf lot · 3.79 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Austin Medical Asstant Training35p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Construction Mall603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Costa Arch & Engineering1002/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Costa2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BNM ConstructionGeneral Contractor104/09/2026
Madison Construction ConsGeneral Contractor107/08/2026
Alphaco SprinklerFire Protection107/08/2026
Marino Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Costa Architects & Engineering1321802/02/2026
Building Lifecycle
All (106)Filed (10)Permit Issued (4)Signed Off (4)Violation (41)Inspection (7)Objection (24)Special Inspection (16)
10/21/2026
Signed off — Alteration CO
Application filed for installation of 1st floor Non- Bearing Partitions, new baths & the conversion of existing 1st floor health care facility to health care trade school.
Q01202037-I1
02/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
02/07/2026
Special inspection requirement — Energy Code Compliance Inspections
ANGELO COSTA
02/07/2026
Special inspection requirement — Lighting controls
ANGELO COSTA
02/07/2026
Special inspection requirement — Interior lighting power
ANGELO COSTA
02/02/2026
Filed — Alteration CO
Application filed for installation of 1st floor Non- Bearing Partitions, new baths & the conversion of existing 1st floor health care facility to health care trade school.
Q01202037-P4
01/15/2026
Violation issued (FDNY_NOV, closed)
01/05/2026
Filed — Alteration CO
Application filed for installation of 1st floor Non- Bearing Partitions, new baths & the conversion of existing 1st floor health care facility to health care trade school.
Q01202037-P3
01/05/2026
Special inspection requirement — Lighting controls
ANGELO COSTA
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
01/05/2026
Special inspection requirement — Energy Code Compliance Inspections
ANGELO COSTA
01/05/2026
Special inspection requirement — Interior lighting power
ANGELO COSTA
10/29/2025
Signed off — Alteration
Herewith filing for 1st floor commercial space sprinkler heads.
Q01208204-S1
10/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/19/2025
Objection raised — Admin
09/19/2025
Objection resolved — Addressed
09/18/2025
Filed — Alteration
Herewith filing for 1st floor commercial space sprinkler heads.
Q01208204-P4
09/17/2025
Filed — Alteration CO
Application filed for installation of 1st floor Non- Bearing Partitions, new baths & the conversion of existing 1st floor health care facility to health care trade school.
Q01202037-P1
09/09/2025
Special inspection requirement — Interior lighting power
ANGELO COSTA
09/09/2025
Special inspection requirement — Lighting controls
ANGELO COSTA
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
ANGELO COSTA
09/08/2025
Signed off — Alteration
Q01228306-I1
09/08/2025
Permit issued — General Construction
Q01202037-I1-GC
09/08/2025
Special inspection requirement — Sprinkler Systems
Paul Antonio
09/05/2025
Signed off — Alteration
Herewith filing for 1st floor commercial space sprinkler heads.
Q01208204-I1
08/27/2025
Filed — Alteration
Q01228306-P1
08/27/2025
Objection resolved — Addressed
08/20/2025
Objection raised — Cost
08/20/2025
Objection resolved — Addressed
07/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
07/10/2025
Filed — Alteration
Herewith filing for 1st floor commercial space sprinkler heads.
Q01208204-P2
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
06/30/2025
Special inspection requirement — Final
George Paider
06/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2025
Permit issued — Plumbing
Q01208204-I1-PL
05/22/2025
Permit issued — General Construction
Q01228306-I1-GC
05/20/2025
Permit issued — Sprinklers
Q01208204-S1-EW-SP
05/19/2025
Filed — Alteration
Q01228306-I1
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
04/25/2025
Objection raised — Structural
04/25/2025
Objection raised — Scope
04/25/2025
Objection raised — Inspections
04/25/2025
Objection raised — Accessibility
04/25/2025
Objection raised — Admin
04/25/2025
Objection raised — Admin
04/25/2025
Objection raised — Structural
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBNM Construction09/08/2025
DOB NOWPlumbingSigned-offMarino Plumbing and Heating06/05/2025
DOB NOWGeneral ConstructionSigned-offMadison Construction Cons05/22/2025
DOB NOWSprinklersSigned-offAlphaco Sprinkler05/20/2025
BISPLISSUEDQMB Plumbing & Heating10/17/2019
BIS—RE-ISSUEDR & S Construction of NY04/08/2019
BISEQISSUEDR & S Construction of NY04/05/2019
BIS—ISSUEDR & S Construction of NY10/18/2018
BISPLISSUEDQMB Plumbing & Heating08/14/2018
BISEQISSUEDR & S Construction of NY08/13/2018
BIS—ISSUEDR & S Construction of NY04/04/2018
BISEQISSUEDR & S Construction of NY04/04/2018
BISEQISSUEDTri Borough Scaffolding11/13/2017
BIS—ISSUEDR & S Construction of NY08/28/2017
BISPLRE-ISSUEDQMB Plumbing & Heating08/09/2017
BISEQISSUEDR & S Construction of NY06/07/2017
BIS—ISSUEDR & S Construction of NY03/23/2017
BISEQISSUEDR & S Construction of NY02/07/2017
BISEQISSUEDTri Borough Scaffolding11/29/2016
BIS—ISSUEDR & S Construction of NY09/06/2016
BIS—ISSUEDR & S Construction of NY09/06/2016
BISEQISSUEDR & S Construction of NY12/22/2015
BIS—ISSUEDR & S Construction of NY12/22/2015
BIS—ISSUEDR & S Construction of NY12/22/2015
BISEQISSUEDTri Borough Scaffolding12/18/2015
4 projects · most recent 03/26/2026
General Wiring
FiledStatusContractorScope
03/26/2026CompleteSupreme ElectricGeneral Wiring
11/19/2019CompleteRightway ElectricalGeneral Wiring
08/06/2018CompleteRightway Electrical—
01/23/2018CompleteRightway Electrical—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
02/07/2026Fire-Resistant Penetrations and JointsANGELO COSTAspecial
02/07/2026Energy Code Compliance InspectionsANGELO COSTAprogress
02/07/2026Lighting controlsANGELO COSTAenergy_progress
02/07/2026Interior lighting powerANGELO COSTAenergy_progress
01/05/2026Lighting controlsANGELO COSTAenergy_progress
01/05/2026Fire-Resistant Penetrations and JointsANGELO COSTAspecial
01/05/2026Energy Code Compliance InspectionsANGELO COSTAprogress
01/05/2026Interior lighting powerANGELO COSTAenergy_progress
09/09/2025Interior lighting powerANGELO COSTAenergy_progress
09/09/2025Lighting controlsANGELO COSTAenergy_progress
09/09/2025Fire-Resistant Penetrations and JointsANGELO COSTAspecial
09/09/2025Energy Code Compliance InspectionsANGELO COSTAprogress
09/08/2025Sprinkler SystemsPaul Antoniospecial
07/14/2025Fire-Resistant Penetrations and JointsANGELO COSTAspecial
07/08/2025Fire-Resistant Penetrations and JointsANGELO COSTAspecial
06/30/2025FinalGeorge Paiderprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Austin Medical Asstant TrainingEducationFloor 1
Project Q01228306 Alteration · LOC Issued · 05/19/2025
Project Q01202037 Alteration CO · CO Issued · 04/08/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 247 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026Q01228306-P1Request digital key ↗
08/20/2026Q01228306-I1Request digital key ↗
08/18/2026Q01208204-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION27
03/25/2025421087656Open ↗
03/07/2025421087656Open ↗
12/15/2020421087656Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION13
04/12/2019421087656Open ↗
04/11/2019421087656Open ↗
11/28/2018440276041Open ↗
Showing 3 of 13 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/17/2015421147574Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/23/2019421087656Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/13/2026Q01202037-P4Open ↗
08/13/2026Q01202037-P3Open ↗
08/13/2026Q01202037-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
10/15/2015421087656Open ↗
10/15/2015421087656Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01202037-I1Open ↗
08/13/2026Q01202037-P4Open ↗
▸BISZONING DIAGRAM1
12/05/2015421087656Open ↗
▸Seals & Professional Certifications48
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
02/10/2020421087656Open ↗
01/06/2020421087656Open ↗
01/06/2020421087656Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026Q01228306-P1Open ↗
08/27/2026Q01202037-P3Open ↗
08/27/2026Q01202037-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026Q01228306-I1Open ↗
08/18/2026Q01208204-S1Open ↗
08/18/2026Q01208204-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026Q01208204-I1Open ↗
08/28/2026Q01208204-P4Open ↗
08/27/2026Q01202037-P3Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/14/2017421298740Open ↗
12/15/2015440276041Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/15/2015440276041Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/14/2017421298740Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/15/2015440276041Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
10/04/2019421087656Open ↗
09/23/2019421087656Open ↗
08/01/2019421087656Open ↗
Showing 3 of 5 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
11/14/2019421087656Open ↗
11/12/2019421087656Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/06/2020421087656Open ↗
▸BISEQUIPMENT USE PERMITS1
01/06/2020421087656Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/07/2019421661650Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
10/15/2015421087656Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
09/14/2020421087656Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/31/2020421087656Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist4
08/13/2026Q01202037-I1Open ↗
08/13/2026Q01202037-P1Open ↗
08/13/2026Q01202037-P3Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
04/17/2015421147574Open ↗
03/21/2015421087656Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
01/31/2020421087656Open ↗
▸BISSTREET TREES SITE PLAN1
12/24/2015421087656Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/24/2015421087656Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/24/2015421087656Open ↗
▸Environmental & Asbestos11
▸DOB NOWOER: Notice of Satisfaction4
08/20/2026Q01228306-I1Open ↗
08/17/2026Q01202037-I1Open ↗
08/13/2026Q01202037-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/20/2026Q01228306-I1Open ↗
08/17/2026Q01202037-I1Open ↗
08/13/2026Q01202037-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
12/15/2015440276041Open ↗
11/13/2015421087656Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/18/2025421087656Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/06/2020421087656Open ↗
01/06/2020421087656Open ↗
02/18/2016421087656Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
01/06/2020421087656Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
12/15/2015440276041Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/06/2025421087656Open ↗
07/17/2020421087656Open ↗
07/17/2020421087656Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
12/12/2019421087656Open ↗
12/12/2019421087656Open ↗
12/24/2015421087656Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
01/03/2020421147574Open ↗
12/05/2019421298740Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
12/05/2015421087656Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/15/2015421087656Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/02/2015421087656Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/24/2015421087656Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
09/14/2020421087656Open ↗
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
01/13/2021421087656Open ↗
01/11/2021421087656Open ↗
10/19/2020421087656Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/15/2021421775617Open ↗
11/04/2020421775617Open ↗
10/19/2020421087656Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/15/2020421087656Open ↗
12/08/2020421087656Open ↗
04/25/2015421087656Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
04/17/2015421147574Open ↗
03/21/2015421087656Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
12/06/2019421087656Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
09/14/2020421087656Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
04/12/2019421087656Open ↗
12/24/2015421087656Open ↗
▸BISCOST AFFIDAVIT2
12/13/2019421661650Open ↗
08/09/2018421661650Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
01/06/2020421087656Open ↗
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION14
10/08/2020421087656Open ↗
01/23/2020421087656Open ↗
01/06/2020421087656Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET9
11/04/2020421775617Open ↗
10/29/2020421783868Open ↗
10/28/2020421775617Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM9
10/29/2020421783868Open ↗
01/06/2020421087656Open ↗
01/03/2020421147574Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/15/2015440276041Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/17/2015421147574Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification4
08/13/2026Q01202037-P3Open ↗
08/13/2026Q01202037-P4Open ↗
08/13/2026Q01202037-P1Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
10/28/2020421775617Open ↗
10/20/2015421087656Open ↗
—421087656Open ↗
▸BISPHOTOLUMINESCENT EXIT PATH MARKINGS2
03/21/2015421087656Open ↗
03/21/2015421087656Open ↗
▸BISPLOT DIAGRAM2
02/06/2020421087656Open ↗
03/21/2015421087656Open ↗
▸BISTCO FEE DUE1
01/13/2021421087656Open ↗