Two family frame
109-18 GUY R BREWER BLVD
QUEENS · South Jamaica · BIN 4532452
💬 Discuss this project
2004Year Built
2Stories
B2Building Class
R6DZoning
—Gross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family frame · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/04/2026
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Violation (5)Special Inspection (5)
06/09/2026
Permit issued — Solar
Q01409445-I1-SL
06/04/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01409445-I1
06/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/04/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/29/2026
Special inspection requirement — Final
Walid Abdulla
02/28/2011
Violation issued (ECB, closed)
Construction
12/10/2010
Violation issued (HPD, open)
B
12/01/2010
Violation issued (ECB, closed)
Construction
12/01/2010
Violation issued (ECB, closed)
Construction
08/24/2010
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/09/2026
BISPLISSUEDWAGNER ZIV PLUMBING & HEATING02/09/2004
BISEQISSUEDEVERLY BROWN01/09/2004
BIS—ISSUEDEVERLY BROWN01/09/2004
1 project · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026Signed-offSUNRUN INSTALLATION SVC20 panels, 9 kw, 420 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/04/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/04/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/29/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/29/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/29/2026FinalWalid Abdullaprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01409445-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026Q01409445-I1Open ↗
08/26/2026Q01409445-I1Open ↗
08/26/2026Q01409445-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q01409445-I1Open ↗
08/26/2026Q01409445-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01409445-I1Open ↗