Primarily 1 family with 1 store or office
109-19 JAMAICA AVENUE
QUEENS · Richmond Hill · BIN 4192213
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R6AZoning
2,000 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: SSJB HOLDINGS, LLC · 2,100 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof5p · 1 filing · 9 docs
Floor 226p · 3 filings · 20 docs
Floor 136p · 5 filings · 20 docs
Cellar31p · 3 filings · 20 docs
Site & exterior15p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/09/2022$300K—— → —$150/sf building
01/14/2022$200K—— → —$100/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC1812/12/2025
ASR ENGINEERING PC101/12/2023
SYED ENGINEERING, P.C.101/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC3603/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&R CONTRACTING MGMT CORPGeneral Contractor907/08/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor107/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NASIR J. KHANZADA LLC15271612/12/2025
Building Lifecycle
All (156)Filed (20)Permit Issued (9)Signed Off (6)Violation (23)Inspection (10)Objection (58)Special Inspection (30)
04/24/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Open
01/14/2026
Objection resolved — Addressed
01/06/2026
Objection raised — Scope
01/06/2026
Objection raised — Scope
01/06/2026
Objection raised — Other
12/12/2025
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING MIXED-USE TWO-STORY BUILDING WITH REAR EXTENSION
Q00685021-P8
12/10/2025
Special inspection requirement — Lighting controls
Nasir Khanzada
12/10/2025
Special inspection requirement — Footing and Foundation
Nasir Khanzada
12/10/2025
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
12/10/2025
Special inspection requirement — Protection of exposed foundation insulation
Nasir Khanzada
12/10/2025
Special inspection requirement — Insulation placement and R values
Nasir Khanzada
12/10/2025
Special inspection requirement — Air barrier - visual inspection
Nasir Khanzada
12/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
12/10/2025
Special inspection requirement — Interior lighting power
Nasir Khanzada
12/10/2025
Special inspection requirement — Metering
Nasir Khanzada
12/10/2025
Special inspection requirement — Fenestration areas
Nasir Khanzada
12/10/2025
Special inspection requirement — Final
Nasir Khanzada
12/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasir Khanzada
12/10/2025
Special inspection requirement — Masonry
Nasir Khanzada
12/02/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2025
Special inspection requirement — Masonry
Nasir Khanzada
09/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
09/15/2025
Special inspection requirement — Metering
Nasir Khanzada
09/15/2025
Special inspection requirement — Interior lighting power
Nasir Khanzada
09/15/2025
Special inspection requirement — Footing and Foundation
Nasir Khanzada
09/15/2025
Special inspection requirement — Air barrier - visual inspection
Nasir Khanzada
09/15/2025
Special inspection requirement — Fenestration areas
Nasir Khanzada
09/15/2025
Special inspection requirement — Insulation placement and R values
Nasir Khanzada
09/15/2025
Special inspection requirement — Lighting controls
Nasir Khanzada
09/15/2025
Special inspection requirement — Final
Nasir Khanzada
09/15/2025
Special inspection requirement — Protection of exposed foundation insulation
Nasir Khanzada
09/15/2025
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
09/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasir Khanzada
09/10/2025
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING MIXED-USE TWO-STORY BUILDING WITH REAR EXTENSION
Q00685021-P7
07/01/2025
Violation issued (ECB, closed)
Boilers
05/01/2025
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING MIXED-USE TWO-STORY BUILDING WITH REAR EXTENSION
Q00685021-P6
04/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
04/18/2025
Special inspection requirement — Masonry
Nasir Khanzada
04/18/2025
Special inspection requirement — Final
Nasir Khanzada
04/18/2025
Special inspection requirement — Footing and Foundation
Nasir Khanzada
03/26/2025
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING MIXED-USE TWO-STORY BUILDING WITH REAR EXTENSION
Q00685021-P5
02/14/2025
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING MIXED-USE TWO-STORY BUILDING WITH REAR EXTENSION
Q00685021-P4
02/07/2025
Signed off — Alteration
APPLICATION FILED FOR TEMPORARY CONTRUCTION FENCE IN CONJUCTION WITH DOB NOW APPLICATION# Q00685021-I1
Q00685031-I1
02/06/2025
Signed off — Alteration
MECHANICAL FILING FOR 1ST FLOOR COMMERCIAL SPACE ONLY IN CONJUNCTION WITH ALT-1 APPLICATION #200685021-I1
Q00878722-I1
01/16/2025
Signed off — Alteration
BOILER APPLICATION FILE TO REMOVE THE EX. BOILERS AND H/W/H FROM THE CALLER AND INSTALLATION TWO COM. BOILER ON THE SECOND FLOOR AND WITHDRAW THE BIS APPLICATION# 410016076
Q01030153-I1
01/15/2025
Filed — Alteration
MECHANICAL FILING FOR 1ST FLOOR COMMERCIAL SPACE ONLY IN CONJUNCTION WITH ALT-1 APPLICATION #200685021-I1
Q00878722-P2
12/17/2024
Filed — Alteration CO
APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING MIXED-USE TWO-STORY BUILDING WITH REAR EXTENSION
Q00685021-P3
12/11/2024
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE INCONJUCTION WITH DOB NOW APPLICATION# Q00685021
Q00685049-I1
10/07/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2024
Objection resolved — Addressed
09/10/2024
Objection raised — Other
08/30/2024
Filed — Alteration
BOILER APPLICATION FILE TO REMOVE THE EX. BOILERS AND H/W/H FROM THE CALLER AND INSTALLATION TWO COM. BOILER ON THE SECOND FLOOR AND WITHDRAW THE BIS APPLICATION# 410016076
Q01030153-P2
08/20/2024
Objection resolved — Addressed
08/19/2024
Objection raised — Other
08/05/2024
Filed — Alteration
BOILER APPLICATION FILE TO REMOVE THE EX. BOILERS AND H/W/H FROM THE CALLER AND INSTALLATION TWO COM. BOILER ON THE SECOND FLOOR AND WITHDRAW THE BIS APPLICATION# 410016076
Q01030153-P1
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC07/18/2024
DOB NOWBoiler EquipmentSigned-offN AND S PLUMBING INC05/29/2024
DOB NOWFoundationPermit IssuedR&R CONTRACTING MGMT CORP02/16/2024
DOB NOWMechanical SystemsSigned-offR&R CONTRACTING MGMT CORP10/11/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC05/23/2023
DOB NOWSidewalk ShedSigned-offR&R CONTRACTING MGMT CORP01/19/2023
DOB NOWEarth WorkPermit IssuedR&R CONTRACTING MGMT CORP12/13/2022
DOB NOWConstruction FenceSigned-offR&R CONTRACTING MGMT CORP12/05/2022
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING01/11/2021
BISBLISSUEDWOODHAVEN PLBG & HTG CORP10/28/2009
BISPLISSUEDWOODHAVEN PLBG & HTG CORP10/29/2007
BISBLISSUEDWOODHAVEN PLBG & HTG CORP10/29/2007
2 projects · most recent 11/14/2023
General Wiring
FiledStatusContractorScope
11/14/2023CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
01/10/2021CompleteRICHARD NEU—
1 project · most recent 12/12/2025
Masonry Wood
FiledStatusContractorScope
12/12/2025Permit IssuedR&R CONTRACTING MGMT CORPMasonry, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/02/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/07/2024Pass-Final Boiler Equipment InspectionPassView ↗
05/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/07/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/11/2023Fail-Final CND-Occupancy InspectionFailView ↗
06/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
12/10/2025MasonryNasir Khanzadaspecial
12/10/2025Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
12/10/2025FinalNasir Khanzadaprogress
12/10/2025Footing and FoundationNasir Khanzadaprogress
12/10/2025Protection of exposed foundation insulationNasir Khanzadaenergy_progress
12/10/2025Fenestration air leakageNasir Khanzadaenergy_progress
12/10/2025Fenestration and door U-factor and product ratingsNasir Khanzadaenergy_progress
12/10/2025Air barrier - visual inspectionNasir Khanzadaenergy_progress
12/10/2025Insulation placement and R valuesNasir Khanzadaenergy_progress
12/10/2025Lighting controlsNasir Khanzadaenergy_progress
12/10/2025Fenestration areasNasir Khanzadaenergy_progress
12/10/2025MeteringNasir Khanzadaenergy_progress
12/10/2025Interior lighting powerNasir Khanzadaenergy_progress
09/15/2025Lighting controlsNasir Khanzadaenergy_progress
09/15/2025Interior lighting powerNasir Khanzadaenergy_progress
09/15/2025MeteringNasir Khanzadaenergy_progress
09/15/2025Fenestration and door U-factor and product ratingsNasir Khanzadaenergy_progress
09/15/2025Insulation placement and R valuesNasir Khanzadaenergy_progress
09/15/2025Air barrier - visual inspectionNasir Khanzadaenergy_progress
09/15/2025Fenestration areasNasir Khanzadaenergy_progress
09/15/2025Fenestration air leakageNasir Khanzadaenergy_progress
09/15/2025Protection of exposed foundation insulationNasir Khanzadaenergy_progress
09/15/2025FinalNasir Khanzadaprogress
09/15/2025Footing and FoundationNasir Khanzadaprogress
09/15/2025Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
Latest 25 of 106.
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
08/25/2026Q00685031-I1Request digital key ↗
08/25/2026Q00811649-I1Request digital key ↗
08/23/2026Q01030153-P2Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00449847-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
07/14/2025410016076Open ↗
07/02/2025410016076Open ↗
02/10/2025410016076Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
10/29/2009410016076Open ↗
10/29/2007410016076Open ↗
10/29/2007410016076Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram9
08/13/2026Q00685021-P3Open ↗
08/13/2026Q00685021-P4Open ↗
08/13/2026Q00685021-P6Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00685021-I1Open ↗
▸Seals & Professional Certifications97
▸DOB NOWProgress Inspector Seal & Signature52
09/30/2026Q00878722-P2Open ↗
09/30/2026Q00878722-P2Open ↗
09/23/2026Q00685049-P1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/30/2026Q00878722-P2Open ↗
09/30/2026Q00878722-P2Open ↗
09/23/2026Q00685049-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/25/2026Q00685031-I1Open ↗
08/23/2026Q01030153-P2Open ↗
08/23/2026Q01030153-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/12/2007410016076Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/12/2007410016076Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/12/2007410016076Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
03/10/2010410016076Open ↗
03/02/2010410016076Open ↗
03/02/2010410016076Open ↗
▸BISSCHEDULE B - PLUMBING2
04/14/2008410016076Open ↗
10/12/2007410016076Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist9
08/13/2026Q00685021-P4Open ↗
08/13/2026Q00685021-P1Open ↗
08/13/2026Q00685021-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00685021-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/23/2026Q01030153-P2Open ↗
08/23/2026Q01030153-P1Open ↗
08/23/2026Q01030153-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/12/2007410016076Open ↗
▸Inspections & Test Reports1
▸BISNOTIF-PROPOSED STEAM-HOT WATER INSPECTION1
03/02/2010410016076Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/29/2007410016076Open ↗
10/29/2007410016076Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
10/15/2007410016076Open ↗
▸Other Documents39
▸DOB NOWSite Survey: Initial9
08/13/2026Q00685021-P3Open ↗
08/13/2026Q00685021-I1Open ↗
08/13/2026Q00685021-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone9
08/13/2026Q00685021-P8Open ↗
08/13/2026Q00685021-P6Open ↗
08/13/2026Q00685021-P5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlot Diagram9
08/13/2026Q00685021-P8Open ↗
08/13/2026Q00685021-P6Open ↗
08/13/2026Q00685021-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProperty Ownership Certification9
08/18/2026Q00685021-P8Open ↗
08/18/2026Q00685021-P7Open ↗
08/18/2026Q00685021-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00685021-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00685021-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00685021-I1Open ↗