← Back
Primarily 1 family with 1 store or office
109-21 JAMAICA AVENUE
QUEENS · Richmond Hill · BIN 4192212
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R6AZoning
2,000 sfGross Floor Area
2Units
13 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: 101-18 LLC · 2,100 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Floor 27p · 2 filings · 16 docs
Floor 17p · 2 filings · 16 docs
Cellar8p · 3 filings · 20 docs
Site & exterior1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
101-18 LLC903/22/2026
CREW CONTRACTING OF NJ807/08/2026
RENNON CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/05/2017$640K—WILJANE HOLDING CORP. → 101-18 LLC$320/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC605/04/2023
JOEL PHAGOO P.E. PLLC112/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YARKS NYC INCGeneral Contractor603/21/2026
JOHN EVAN CONTRACTING CORGeneral Contractor303/21/2026
INFINITI ESC PLUMBING CORPlumbing307/08/2026
GREEN POWER ELECTRIC CORPElectrical103/22/2026
CREW CONTRACTING OF NJ INCGeneral Contractor107/08/2026
SUPERB CONSTRUCTION MGTGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330605/04/2023
Building Lifecycle
All (50)Filed (7)Permit Issued (8)Signed Off (3)Violation (20)Inspection (6)Special Inspection (6)
02/06/2026
Violation issued (HPD, open)
B
02/06/2026
Violation issued (HPD, open)
B
02/06/2026
Violation issued (HPD, open)
B
02/06/2026
Violation issued (HPD, open)
B
02/06/2026
Violation issued (HPD, open)
B
02/06/2026
Violation issued (HPD, open)
B
05/16/2023
Signed off — Alteration
File application to install (2) new boilers at cellar. There is no change in use, egress and occupancy.
Q00856161-I1
05/16/2023
Signed off — Alteration
Plumbing work for existing mixed use building. There is no change in use, egress and occupancy.
Q00646122-I1
05/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
05/05/2023
Special inspection requirement — Heating Systems
Jinfar Liu
05/04/2023
Filed — Alteration
File application to install (2) new boilers at cellar. There is no change in use, egress and occupancy.
Q00856161-P1
05/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
05/04/2023
Special inspection requirement — Heating Systems
Jinfar Liu
05/02/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/26/2023
Permit issued — Boiler Equipment
Q00856161-I1-BE
04/07/2023
Filed — Alteration
File application to install (2) new boilers at cellar. There is no change in use, egress and occupancy.
Q00856161-I1
03/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/15/2023
Permit issued — Plumbing
Q00646122-I1-PL
03/07/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/14/2023
Signed off — Alteration
Interior renovation for existing mix use building. There is no change in use, egress and occupancy.
Q00646003-I1
11/29/2022
Filed — Alteration
Plumbing work for existing mixed use building. There is no change in use, egress and occupancy.
Q00646122-P1
11/29/2022
Filed — Alteration
Interior renovation for existing mix use building. There is no change in use, egress and occupancy.
Q00646003-P1
11/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
11/11/2022
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
06/01/2022
Permit issued — General Construction
Q00646003-I1-GC
04/04/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2022
Permit issued — Sidewalk Shed
Q00440006-I1-SH
02/16/2022
Permit issued — Plumbing
Q00646122-I1-PL
12/20/2021
Permit issued — General Construction
Q00646003-I1-GC
12/17/2021
Filed — Alteration
Plumbing work for existing mixed use building. There is no change in use, egress and occupancy.
Q00646122-I1
12/16/2021
Filed — Alteration
Interior renovation for existing mix use building. There is no change in use, egress and occupancy.
Q00646003-I1
02/19/2021
Permit issued — Sidewalk Shed
Q00440006-I1-SH
12/16/2020
Permit issued — Sidewalk Shed
Q00440006-I1-SH
12/15/2020
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DUE TO FULL VACATE ORDER ON PROPERTY AS A RESULT OF FIRE. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00440006-I1
12/15/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/10/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/10/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/11/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/11/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offINFINITI ESC PLUMBING COR04/26/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR03/15/2023
DOB NOWGeneral ConstructionSigned-offJOHN EVAN CONTRACTING COR06/01/2022
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC02/22/2022
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/16/2022
DOB NOWGeneral ConstructionSigned-offSUPERB CONSTRUCTION MGT12/20/2021
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC02/19/2021
DOB NOWSidewalk ShedPermit IssuedCREW CONTRACTING OF NJ IN12/16/2020
1 project · most recent 12/16/2020
FiledStatusContractorScope
12/16/2020Permit IssuedGREEN POWER ELECTRIC CORP—
1 project · most recent 12/15/2020
Sidewalk Shed
FiledStatusContractorScope
12/15/2020Permit IssuedYARKS NYC INCSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/05/2023Fire-Resistant Penetrations and JointsJinfar Liuspecial
05/05/2023Heating SystemsJinfar Liuspecial
05/04/2023Fire-Resistant Penetrations and JointsJinfar Liuspecial
05/04/2023Heating SystemsJinfar Liuspecial
11/11/2022Fire-Resistant Penetrations and JointsJinfar Liuspecial
11/11/2022Energy Code Compliance InspectionsJinfar Liuprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/25/2026Q00646003-P1Request digital key ↗
08/25/2026Q00646003-I1Request digital key ↗
08/25/2026Q00646122-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00440006-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q00646122-P1Open ↗
08/25/2026Q00646122-I1Open ↗
08/24/2026Q00856161-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q00856161-P1Open ↗
09/02/2026Q00856161-P1Open ↗
08/27/2026Q00856161-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q00646122-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026Q00646122-P1Open ↗
08/25/2026Q00646122-I1Open ↗
08/24/2026Q00856161-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00646003-I1Open ↗
08/13/2026Q00646122-I1Open ↗