← Back
Primarily 1 family with 1 store or office
109-23 JAMAICA AVENUE
QUEENS · Richmond Hill · BIN 4192211
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R6AZoning
2,160 sfGross Floor Area
2Units
3 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: 109-23 REALTY LLC · 2,100 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Roof7p · 1 filing · 20 docs
Floor 27p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar13p · 2 filings · 20 docs
Site & exterior6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AEG RESTORATION CORP2103/22/2026
CREW CONTRACTING OF NJ607/08/2026
RENNON CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGE ENGINEERING, LLC602/16/2023
JOEL PHAGOO P.E. PLLC112/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCOMETRIC DESIGN1203/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AEG RESTORATION CORPGeneral Contractor403/21/2026
YARKS NYC INCGeneral Contractor207/08/2026
LCS PLUMBING&CONSULT INCPlumbing207/08/2026
GREEN POWER ELECTRIC CORPElectrical103/22/2026
CREW CONTRACTING OF NJ INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AGE ENGINEERING, LLC6695602/16/2023
Building Lifecycle
All (62)Filed (7)Permit Issued (7)Signed Off (2)Violation (10)Inspection (6)Special Inspection (30)
03/20/2023
Signed off — Alteration
GC ALTERATION FOR MISCELLANEOUS INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR DUE TO FIRE, SMOKE, AND WATER DAMAGE; ALSO, REPLACEMENT OF DAMAGED ROOF DECKING AND ROOFING. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00490839-I1
03/14/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/22/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/16/2023
Filed — Alteration
GC ALTERATION FOR MISCELLANEOUS INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR DUE TO FIRE, SMOKE, AND WATER DAMAGE; ALSO, REPLACEMENT OF DAMAGED ROOF DECKING AND ROOFING. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00490839-P1
02/16/2023
Signed off — Alteration
GC ALTERATION FOR MISCELLANEOUS INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR DUE TO FIRE, SMOKE, AND WATER DAMAGE; ALSO, REPLACEMENT OF DAMAGED ROOF DECKING AND ROOFING. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00490839-S1
02/16/2023
Special inspection requirement — Mechanical Systems
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — Insulation placement and R values
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — Air barrier - visual inspection
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — Lighting in dwelling units
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
ROBESPIERRE ARISTILDE
02/16/2023
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
12/12/2022
Filed — Alteration
ON EXIST. TWO-STORY MIXED-USED BUILDING, FILING FOR MISCELLANEOUS PLUMBING WORK TO REPLACE ALL PLUMBING FIXTURES AND ROUGHING WITH NEW INCLUDING THE EXISTING RPZ, DUE TO FIRE DAMAGE. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00589547-P2
12/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
12/12/2022
Special inspection requirement — Energy Code Compliance Inspections
ROBESPIERRE ARISTILDE
12/12/2022
Special inspection requirement — Metering
ROBESPIERRE ARISTILDE
12/12/2022
Special inspection requirement — Permanent certificate
ROBESPIERRE ARISTILDE
12/08/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/03/2022
Permit issued — Boiler Equipment
Q00490839-S1-BE
11/29/2022
Filed — Alteration
GC ALTERATION FOR MISCELLANEOUS INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR DUE TO FIRE, SMOKE, AND WATER DAMAGE; ALSO, REPLACEMENT OF DAMAGED ROOF DECKING AND ROOFING. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00490839-S1
11/23/2022
Special inspection requirement — Maintenance information
ROBESPIERRE ARISTILDE
11/15/2022
Special inspection requirement — Heating Systems
ROBESPIERRE ARISTILDE
11/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
11/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
11/07/2022
Special inspection requirement — Energy Code Compliance Inspections
ROBESPIERRE ARISTILDE
11/07/2022
Special inspection requirement — Metering
ROBESPIERRE ARISTILDE
11/07/2022
Special inspection requirement — Permanent certificate
ROBESPIERRE ARISTILDE
10/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/11/2022
Filed — Alteration
ON EXIST. TWO-STORY MIXED-USED BUILDING, FILING FOR MISCELLANEOUS PLUMBING WORK TO REPLACE ALL PLUMBING FIXTURES AND ROUGHING WITH NEW INCLUDING THE EXISTING RPZ, DUE TO FIRE DAMAGE. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00589547-P1
08/29/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ROBESPIERRE ARISTILDE
08/29/2022
Special inspection requirement — Insulation placement and R values
ROBESPIERRE ARISTILDE
08/29/2022
Special inspection requirement — Air barrier - visual inspection
ROBESPIERRE ARISTILDE
08/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
ROBESPIERRE ARISTILDE
08/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBESPIERRE ARISTILDE
08/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
ROBESPIERRE ARISTILDE
08/29/2022
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
08/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBESPIERRE ARISTILDE
03/28/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2022
Permit issued — Plumbing
Q00589547-I1-PL
03/03/2022
Permit issued — Mechanical Systems
Q00490839-I1-GC-CX
02/28/2022
Filed — Alteration
ON EXIST. TWO-STORY MIXED-USED BUILDING, FILING FOR MISCELLANEOUS PLUMBING WORK TO REPLACE ALL PLUMBING FIXTURES AND ROUGHING WITH NEW INCLUDING THE EXISTING RPZ, DUE TO FIRE DAMAGE. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00589547-I1
02/22/2022
Permit issued — Sidewalk Shed
Q00440007-I1-SH
09/08/2021
Permit issued — General Construction
Q00490839-I1-GC-CX
09/03/2021
Filed — Alteration
GC ALTERATION FOR MISCELLANEOUS INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR DUE TO FIRE, SMOKE, AND WATER DAMAGE; ALSO, REPLACEMENT OF DAMAGED ROOF DECKING AND ROOFING. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00490839-I1
02/19/2021
Permit issued — Sidewalk Shed
Q00440007-I1-SH
12/16/2020
Permit issued — Sidewalk Shed
Q00440007-I1-SH
12/15/2020
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DUE TO FULL VACATE ORDER ON PROPERTY AS A RESULT OF FIRE. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00440007-I1
12/15/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/03/2008
Violation issued (HPD, open)
B
11/03/2008
Violation issued (HPD, open)
B
11/03/2008
Violation issued (HPD, open)
B
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offATTENTION TO DETAIL P&H.I12/03/2022
DOB NOWPlumbingSigned-offATTENTION TO DETAIL P&H.I03/21/2022
DOB NOWMechanical SystemsSigned-offAEG RESTORATION03/03/2022
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC02/22/2022
DOB NOWGeneral ConstructionSigned-offAEG RESTORATION09/08/2021
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC02/19/2021
DOB NOWSidewalk ShedPermit IssuedCREW CONTRACTING OF NJ IN12/16/2020
1 project · most recent 12/12/2022
Gas Water/Sanitary
FiledStatusContractorScope
12/12/2022Signed-offAWS MECHANICAL II LLCGas, Water/Sanitary
2 projects · most recent 02/11/2022
General Wiring
FiledStatusContractorScope
02/11/2022CompleteFISHMAN ELECT. & SON CORPGeneral Wiring
12/16/2020Permit IssuedGREEN POWER ELECTRIC CORP—
1 project · most recent 12/15/2020
Sidewalk Shed
FiledStatusContractorScope
12/15/2020Permit IssuedYARKS NYC INCSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/14/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/22/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/08/2022Pass-Final Boiler Equipment InspectionPassView ↗
10/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
02/16/2023Mechanical SystemsROBESPIERRE ARISTILDEspecial
02/16/2023Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
02/16/2023Exterior Insulation and Finish Systems (EIFS)ROBESPIERRE ARISTILDEspecial
02/16/2023Structural Stability – Alterations of existing buildingsROBESPIERRE ARISTILDEspecial
02/16/2023Insulation placement and R valuesROBESPIERRE ARISTILDEenergy_progress
02/16/2023Air barrier - visual inspectionROBESPIERRE ARISTILDEenergy_progress
02/16/2023HVAC-R and service water heating equipmentROBESPIERRE ARISTILDEenergy_progress
02/16/2023Lighting in dwelling unitsROBESPIERRE ARISTILDEenergy_progress
02/16/2023HVAC-R and service water piping design and insulationROBESPIERRE ARISTILDEenergy_progress
02/16/2023HVAC-R and service water heating system controlsROBESPIERRE ARISTILDEenergy_progress
02/16/2023FinalROBESPIERRE ARISTILDEprogress
12/12/2022Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
12/12/2022Energy Code Compliance InspectionsROBESPIERRE ARISTILDEprogress
12/12/2022MeteringROBESPIERRE ARISTILDEenergy_progress
12/12/2022Permanent certificateROBESPIERRE ARISTILDEenergy_progress
11/23/2022Maintenance informationROBESPIERRE ARISTILDEenergy_progress
11/15/2022Heating SystemsROBESPIERRE ARISTILDEspecial
11/15/2022Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
11/07/2022Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
11/07/2022Energy Code Compliance InspectionsROBESPIERRE ARISTILDEprogress
11/07/2022MeteringROBESPIERRE ARISTILDEenergy_progress
11/07/2022Permanent certificateROBESPIERRE ARISTILDEenergy_progress
08/29/2022Exterior Insulation and Finish Systems (EIFS)ROBESPIERRE ARISTILDEspecial
08/29/2022Insulation placement and R valuesROBESPIERRE ARISTILDEenergy_progress
08/29/2022Air barrier - visual inspectionROBESPIERRE ARISTILDEenergy_progress
Latest 25 of 37.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/25/2026Q00589547-P2Request digital key ↗
08/25/2026Q00589547-P1Request digital key ↗
08/25/2026Q00589547-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00440007-I1Request digital key ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026Q00490839-P1Open ↗
09/01/2026Q00490839-P1Open ↗
09/01/2026Q00490839-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026Q00490839-P1Open ↗
09/01/2026Q00490839-P1Open ↗
09/01/2026Q00490839-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00440007-I1Open ↗
08/25/2026Q00589547-P2Open ↗
08/25/2026Q00589547-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/25/2026Q00589547-I1Open ↗
08/25/2026Q00490839-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00589547-I1Open ↗
08/13/2026Q00490839-I1Open ↗