← Back
Two family converted from one family
109-31 134 STREET
QUEENS · South Ozone Park · BIN 4250086
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3-2Zoning
2,196 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS504/05/2023
SELF EMPLOYED111/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Younes Abouyaala PE103/21/2026
GERALD J. CALIENDO R.A., P.C.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST MATCH CORPORATIONGeneral Contractor707/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing207/08/2026
ABRAMS, JR, WElectrical103/21/2026
FABCON LLCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519404/05/2023
Building Lifecycle
All (55)Filed (6)Permit Issued (5)Signed Off (2)Violation (2)Inspection (7)Objection (4)Special Inspection (29)
01/24/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/09/2024
Signed off — Alteration
Q00456023-I1
01/09/2024
Signed off — Alteration
HEREWITH FILED ALTERATION TYPE -2 FOR INSTALLATION OF PLUMBING AND GAS FIXTURES FILED IN CONJUNCTION WITH ALTERATION -1 #440634146 AND NB#440634413
Q00444545-I1
04/09/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
04/09/2023
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
04/09/2023
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
04/09/2023
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
04/09/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/09/2023
Special inspection requirement — Soil Percolation Test - Individual On-Site Private Sewage Disposal Systems
Younes Abouyaala
04/05/2023
Filed — Alteration
HEREWITH FILED ALTERATION TYPE -2 FOR INSTALLATION OF PLUMBING AND GAS FIXTURES FILED IN CONJUNCTION WITH ALTERATION -1 #440634146 AND NB#440634413
Q00444545-P2
04/04/2023
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
04/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/04/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
04/04/2023
Special inspection requirement — Soil Percolation Test - Individual On-Site Private Sewage Disposal Systems
Younes Abouyaala
04/04/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/04/2023
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
04/04/2023
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
03/08/2023
Permit issued — Plumbing
Q00444545-I1-PL
01/12/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/22/2022
Filed — Alteration
HEREWITH FILED ALTERATION TYPE -2 FOR INSTALLATION OF PLUMBING AND GAS FIXTURES FILED IN CONJUNCTION WITH ALTERATION -1 #440634146 AND NB#440634413
Q00444545-P1
12/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/07/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
12/07/2022
Special inspection requirement — Soil Percolation Test - Individual On-Site Private Sewage Disposal Systems
Younes Abouyaala
12/07/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/07/2022
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
12/07/2022
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
12/07/2022
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
11/25/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/19/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/24/2022
Permit issued — Curb Cut
Q00465385-I1-CC
03/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/10/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/07/2022
Violation issued (ECB, closed)
Construction
02/22/2022
Permit issued — Construction Fence
Q00456023-I1-FN
02/22/2022
Permit issued — Plumbing
Q00444545-I1-PL
11/15/2021
Filed — Alteration
Foundation & WOOD STRUCTURAL FRAMING AT REAR FOR PROPSOED EXTENSION IN CONJUNCTION WITH ALT-1 JOB# 440634146
Q00577504-I1
11/15/2021
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
10/14/2021
Permit issued — Construction Fence
Q00456023-I1-FN
08/16/2021
Special inspection requirement — Footing and Foundation
Younes Abouyaala
08/16/2021
Special inspection requirement — Final
NAVEEN KUMAR
08/16/2021
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
08/16/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/16/2021
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
08/16/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
08/16/2021
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
02/19/2021
Objection raised — Inspections
02/19/2021
Objection resolved — Addressed
02/19/2021
Objection raised — Admin
02/19/2021
Objection resolved — Addressed
02/12/2021
Filed — Alteration
Q00456023-I1
02/12/2021
Filed — Alteration
HEREWITH FILED ALTERATION TYPE -2 FOR INSTALLATION OF PLUMBING AND GAS FIXTURES FILED IN CONJUNCTION WITH ALTERATION -1 #440634146 AND NB#440634413
Q00444545-I1
02/12/2021
Filed — Alteration
HEREWITH FILED TO ALTERATION-3 FOR PROPOSED CURB CUT FILED IN CONJUNCTION WITH NEW BUILDING #440634413 WITH A TOTAL WIDTH OF 10'-0" INCLUDING 1'-6"SPLAYS
Q00465385-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC03/08/2023
DOB NOWCurb CutPermit IssuedBEST MATCH CORPORATION06/24/2022
DOB NOWConstruction FenceSigned-offBEST MATCH CORPORATION02/22/2022
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC02/22/2022
DOB NOWConstruction FenceSigned-offBEST MATCH CORPORATION10/14/2021
BIS—ISSUEDBEST MATCH CORPORATION02/22/2022
BIS—ISSUEDBEST MATCH CORPORATION02/22/2022
BIS—ISSUEDBEST MATCH CORPORATION12/06/2021
BIS—ISSUEDBEST MATCH CORPORATION12/06/2021
1 project · most recent 08/12/2026
General Wiring
FiledStatusContractorScope
08/12/2026CompleteINDY ELECTRIC CORP.General Wiring
1 project · most recent 11/15/2021
Wood
FiledStatusContractorScope
11/15/2021——Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/24/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
01/12/2023Pass-Final PL - UndergroundPassView ↗
11/25/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/10/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/09/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
04/09/2023HVAC and service water heating system controls Younes Abouyaalaenergy_progress
04/09/2023HVAC and service water heating equipment Younes Abouyaalaenergy_progress
04/09/2023HVAC insulation and sealing Younes Abouyaalaenergy_progress
04/09/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/09/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/09/2023Soil Percolation Test - Individual On-Site Private Sewage Disposal SystemsYounes Abouyaalaspecial
04/04/2023HVAC insulation and sealing Younes Abouyaalaenergy_progress
04/04/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/04/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
04/04/2023Soil Percolation Test - Individual On-Site Private Sewage Disposal SystemsYounes Abouyaalaspecial
04/04/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/04/2023HVAC and service water heating equipment Younes Abouyaalaenergy_progress
04/04/2023HVAC and service water heating system controls Younes Abouyaalaenergy_progress
12/07/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/07/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
12/07/2022Soil Percolation Test - Individual On-Site Private Sewage Disposal SystemsYounes Abouyaalaspecial
12/07/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/07/2022HVAC and service water heating system controls Younes Abouyaalaenergy_progress
12/07/2022HVAC and service water heating equipment Younes Abouyaalaenergy_progress
12/07/2022HVAC insulation and sealing Younes Abouyaalaenergy_progress
11/15/2021Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
08/16/2021Footing and FoundationYounes Abouyaalaprogress
08/16/2021FinalNAVEEN KUMARprogress
08/16/2021Structural Wood FrameYounes Abouyaalaprogress
Latest 25 of 29.
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026Q00444545-I1Request digital key ↗
08/15/2026Q00444545-P1Request digital key ↗
08/15/2026Q00444545-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
08/27/2026Q00465385-P1Request digital key ↗
08/14/2026Q00465385-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/27/2026Q00577504-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00456023-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION9
12/05/2022440634146Open ↗
11/16/2021440634413Open ↗
10/22/2021440634413Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION2
12/06/2021440634413Open ↗
12/06/2021440634146Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
11/22/2021440634146Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
12/06/2021440634146Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
11/18/2021440634413Open ↗
08/17/2021440634146Open ↗
▸BISPD1 FORM WITH BP TOPO UNIT VERIFICATION(ZR 12-10 #ZONING LOT#)1
12/02/2021440634146Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/21/2022440634146Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00444545-P1Open ↗
09/01/2026Q00444545-P1Open ↗
08/24/2026Q00444545-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00456023-I1Open ↗
08/27/2026Q00465385-P1Open ↗
08/27/2026Q00465385-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00444545-P1Open ↗
08/24/2026Q00444545-I1Open ↗
08/24/2026Q00444545-P2Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/07/2021440634146Open ↗
12/15/2020440634413Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/15/2020440634413Open ↗
▸Trade Schedules & Equipment1
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
11/09/2021440634413Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST4
11/09/2021440634413Open ↗
04/19/2021440634146Open ↗
01/07/2021440634146Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00577504-I1Open ↗
08/25/2026Q00444545-P1Open ↗
08/25/2026Q00444545-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/19/2021440634146Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/06/2021440634413Open ↗
11/22/2021440634146Open ↗
11/09/2021440634413Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00444545-I1Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY12
12/06/2021440634413Open ↗
11/22/2021440634146Open ↗
11/22/2021440634146Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSOIL REPORT3
08/25/2026Q00444545-P1Open ↗
08/25/2026Q00444545-I1Open ↗
08/13/2026Q00444545-P2Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
01/07/2021440634146Open ↗
12/15/2020440634413Open ↗
▸BISSOIL REPORT2
01/07/2021440634146Open ↗
12/15/2020440634413Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00444545-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE3
05/24/2021440634146Open ↗
03/31/2021440634146Open ↗
03/25/2021440634146Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/17/2021440634146Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
08/17/2021440634146Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
12/06/2021440634413Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION9
12/09/2022440634146Open ↗
11/30/2021440634413Open ↗
11/18/2021440634413Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/07/2021440634146Open ↗
12/15/2020440634413Open ↗
▸Other Documents2
▸BISSUSTAINABLE ROOF ZONE FORM2
01/07/2021440634146Open ↗
12/15/2020440634413Open ↗