← Back
Two stories - detached, small or mid-size
109-31 197 STREET
QUEENS · BIN 4234029
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R2Zoning
2,262 sfGross Floor Area
1Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
Basement1p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/22/2023$888K—— → —$392/sf building
06/02/2021$444K—— → —$196/sf building
08/19/2019$430K—Private party → WILMINGTON SAVINGS FUND SOCIETY,$190/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA201/09/2024
JAHMAL SABAHA PE CONSULTING ENGR909/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING403/21/2026
KMS DRAFTING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAE MGMT INCGeneral Contractor603/21/2026
VILLAGE ELECTL CONTRS INCElectrical103/22/2026
HOPE HOME IMPROVEMENT INCGeneral Contractor107/08/2026
SOLAR PRO INCGeneral Contractor107/08/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415112/21/2023
AA BUILDING & INSPECTION1519809/09/2022
Building Lifecycle
All (140)Filed (11)Permit Issued (5)Signed Off (5)Violation (60)Inspection (5)Objection (24)Special Inspection (30)
11/25/2025
Violation issued (HPD, open)
I
02/02/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE , OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q00980956-I1
01/29/2024
Permit issued — Solar
Q00980956-I1-SL
01/09/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE , OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q00980956-P2
01/09/2024
Special inspection requirement — Air barrier - visual inspection
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/09/2024
Special inspection requirement — Energy Code Compliance Inspections
01/09/2024
Special inspection requirement — Final
12/21/2023
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE , OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q00980956-I1
11/29/2023
Violation issued (HPD, closed)
I
12/05/2022
Signed off — Alteration
Propose HVAC system with related components as per plans.
Q00569952-S1
12/01/2022
Signed off — Alteration
Propose HVAC system with related components as per plans.
Q00569952-I1
11/30/2022
Permit issued — Mechanical Systems
Q00569952-S1-MS
11/18/2022
Violation issued (HPD, closed)
I
09/09/2022
Filed — Alteration
Propose HVAC system with related components as per plans.
Q00569952-S1
09/09/2022
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
09/08/2022
Special inspection requirement — Maintenance information
Younes Abouyaala
09/08/2022
Special inspection requirement — Permanent certificate
Younes Abouyaala
09/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/05/2022
Signed off — Alteration
Propose cap and removal of all existing plumbing fixtures with new roughing and related components throughout as per plans. No change to use, bulk or egress
Q00573112-I1
07/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/13/2022
Filed — Alteration
Propose cap and removal of all existing plumbing fixtures with new roughing and related components throughout as per plans. No change to use, bulk or egress
Q00573112-P2
03/25/2022
Special inspection requirement — Final
NAVEEN KUMAR
03/25/2022
Special inspection requirement — Mechanical Systems
Younes Abouyaala
03/24/2022
Filed — Alteration
Propose cap and removal of all existing plumbing fixtures with new roughing and related components throughout as per plans. No change to use, bulk or egress
Q00573112-P1
03/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
03/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
03/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
03/17/2022
Violation issued (HPD, closed)
I
03/17/2022
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
03/17/2022
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
03/17/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
03/17/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
03/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/17/2022
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
03/17/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
03/17/2022
Special inspection requirement — Final
NAVEEN KUMAR
03/17/2022
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
03/10/2022
Objection resolved — Addressed
03/09/2022
Objection raised — Other
03/07/2022
Signed off — Alteration
PROPOSE CONSTRUCTION FENCE AS PER PLANS. NO CHANGE TO USE BULK OR EGRESS
Q00535974-I1
03/02/2022
Filed — Alteration
Propose HVAC system with related components as per plans.
Q00569952-P3
03/02/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
10/28/2021
Permit issued — Earth Work
Q00569952-I1-GC-CX
10/27/2021
Filed — Alteration
Propose HVAC system with related components as per plans.
Q00569952-P2
10/27/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/21/2021
Objection resolved — Addressed
10/12/2021
Objection resolved — Addressed
10/08/2021
Objection resolved — Addressed
09/30/2021
Objection resolved — Addressed
09/29/2021
Filed — Alteration
Propose HVAC system with related components as per plans.
Q00569952-P1
09/29/2021
Objection raised — Accessibility
09/29/2021
Objection raised — Accessibility
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR PRO INC01/29/2024
DOB NOWMechanical SystemsPermit IssuedHOPE HOME IMPROVEMENT INC11/30/2022
DOB NOWEarth WorkSigned-offRAE MGMT INC10/28/2021
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC09/07/2021
DOB NOWConstruction FenceSigned-offRAE MGMT INC08/06/2021
2 projects · most recent 12/08/2023
General Wiring
FiledStatusContractorScope
12/08/2023CompleteVILLAGE ELECTL CONTRS INC—
09/01/2021CompleteBLZ ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/02/2022Pass-Final Fence Non-Directive 14PassView ↗
10/27/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/15/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
01/09/2024Air barrier - visual inspection—energy_progress
01/09/2024Fire-Resistant Penetrations and Joints—special
01/09/2024Structural Stability – Alterations of existing buildings—special
01/09/2024Energy Code Compliance Inspections—progress
01/09/2024Final—progress
09/09/2022Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
09/08/2022Maintenance informationYounes Abouyaalaenergy_progress
09/08/2022Permanent certificateYounes Abouyaalaenergy_progress
09/08/2022HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/08/2022HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
09/08/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/15/2022HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/15/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/15/2022HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/15/2022HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
03/25/2022FinalNAVEEN KUMARprogress
03/25/2022Mechanical SystemsYounes Abouyaalaspecial
03/23/2022HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
03/23/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/23/2022HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
03/23/2022HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
03/17/2022Insulation placement and R valuesYounes Abouyaalaenergy_progress
03/17/2022Concrete - Cast-In-PlaceYounes Abouyaalaspecial
03/17/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
03/17/2022Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
Latest 25 of 55.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026Q00573112-P2Request digital key ↗
08/27/2026Q00573112-P1Request digital key ↗
08/27/2026Q00573112-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWRestrictive Declaration/Easement 17
08/27/2026Q00573112-I1Open ↗
08/27/2026Q00573112-P1Open ↗
08/14/2026Q00569952-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/14/2026Q00569952-I1Open ↗
08/13/2026Q00569952-P3Open ↗
08/13/2026Q00569952-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWSpecial Inspector Seal & Signature17
08/25/2026Q00569952-S1Open ↗
08/25/2026Q00573112-I1Open ↗
08/25/2026Q00569952-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00573112-P1Open ↗
08/27/2026Q00573112-I1Open ↗
08/25/2026Q00569952-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/25/2026Q00569952-S1Open ↗
08/25/2026Q00569952-S1Open ↗
08/25/2026Q00569952-S1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026Q00573112-P1Open ↗
08/27/2026Q00573112-I1Open ↗
08/25/2026Q00569952-S1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/14/2026Q00569952-I1Open ↗
08/13/2026Q00573112-I1Open ↗
08/13/2026Q00569952-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00980956-I1Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram4
08/14/2026Q00569952-I1Open ↗
08/13/2026Q00569952-P1Open ↗
08/13/2026Q00569952-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/14/2026Q00569952-I1Open ↗
08/13/2026Q00569952-P2Open ↗
08/13/2026Q00569952-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/14/2026Q00569952-I1Open ↗