← Back
BuildNYC
Two stories - detached, small or mid-size
109-32 PARK LANE SOUTH
QUEENS · Richmond Hill · BIN 4192258
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2Zoning
2,084 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,500 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11p · 1 filing · 10 docs
Site & exterior1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sung Ho Shin Architect105/27/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G-Brothers Contracting CoGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sung Ho Shin Architect2997105/27/2021
Building Lifecycle
11/12/2021
Signed off — Alteration
INSTALL EXTERIOR DOOR, STOOP, AND STAIR TO HAVE ACCESS FROM EXISTING KITCHEN TO REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q00529350-I1
10/20/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/24/2021
Permit issued — General Construction
Q00529350-I1-GC
05/27/2021
Filed — Alteration
INSTALL EXTERIOR DOOR, STOOP, AND STAIR TO HAVE ACCESS FROM EXISTING KITCHEN TO REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q00529350-I1
05/26/2021
Special inspection requirement — Concrete - Cast-In-Place
SUNG HO SHIN
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offG-Brothers Contracting Co08/24/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/20/2021Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/26/2021Concrete - Cast-In-PlaceSUNG HO SHINspecial
05/26/2021Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
05/26/2021Energy Code Compliance InspectionsSUNG HO SHINprogress
05/26/2021Fenestration air leakageSUNG HO SHINenergy_progress
05/26/2021Fenestration areasSUNG HO SHINenergy_progress
05/26/2021Fenestration and door U-factor and product ratingsSUNG HO SHINenergy_progress
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account