← Back
Two stories - detached, small or mid-size
109-42 125 STREET
QUEENS · South Ozone Park · BIN 4249691
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3-2Zoning
840 sfGross Floor Area
1Units
4 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,000 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Roof4p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR104/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VILLAGE ELECTL CONTRS INCElectrical103/22/2026
CENTURION SOLAR ENERGYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475104/08/2025
Building Lifecycle
All (14)Filed (1)Permit Issued (1)Violation (5)Objection (2)Special Inspection (5)
05/05/2025
Permit issued — Solar
Q01205959-I1-SL
04/23/2025
Objection resolved — Addressed
04/11/2025
Objection raised — Electrical
04/08/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01205959-I1
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
04/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
04/04/2025
Special inspection requirement — Final
Andres Arias Londono
04/04/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
02/27/2024
Violation issued (ECB, closed)
Construction
02/27/2024
Violation issued (ECB, open)
Zoning
11/01/2023
Violation issued (ECB, open)
Zoning
12/30/2022
Violation issued (ECB, open)
Construction
12/30/2022
Violation issued (ECB, open)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedCENTURION SOLAR ENERGY05/05/2025
2 projects · most recent 05/06/2025
General Wiring
FiledStatusContractorScope
05/06/2025Permit IssuedVILLAGE ELECTL CONTRS INCGeneral Wiring
04/06/2025Permit IssuedBERGER QUALITY ELEC'L CON—
1 project · most recent 04/08/2025
FiledStatusContractorScope
04/08/2025Permit IssuedCENTURION SOLAR ENERGY10 panels, 4.25 kw, 210.19 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/04/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
04/04/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
04/04/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
04/04/2025FinalAndres Arias Londonoprogress
04/04/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01205959-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01205959-I1Open ↗
08/25/2026Q01205959-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01205959-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01205959-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01205959-I1Open ↗