109 EAST 31ST STREET
MANHATTAN · BIN 1082106
💬 Discuss this project
1915Year Built
7Stories
O3Building Class
C6-4AZoning
14,053 sfGross Floor Area
2Units
3 Active Violations 2 unresolved · 1 paperwork only 2 likely answered 3 old, status unconfirmed ▸FISP: SAFE
Office only, 7-19 stories · Owner of record: Hope Church NYC · 2,173 sf lot · 6.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHope Church NYC, Mujigye Foundation11p · 2 filings · 20 docs
Floor 7Hope Church NYC, Mujigye Foundation12p · 3 filings · 20 docs
Floor 6Hope Church NYC, Mujigye Foundation11p · 3 filings · 20 docs
Floor 5Hope Church NYC, Mujigye Foundation13p · 3 filings · 20 docs
Floor 4Hope Church NYC, Mujigye Foundation6p · 2 filings · 13 docs
Floor 3Hope Church NYC, Mujigye Foundation5p · 2 filings · 13 docs
Floor 2Hope Church NYC, Mujigye Foundation6p · 2 filings · 13 docs
Floor 1Mujigye Foundation8p · 3 filings · 12 docs
Site & exteriorHeavy duty sidewalk shed5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mujigye Foundation1903/22/2026
Jewsforjesus1303/21/2026
Hope Church NYC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/05/2019$10.8M—Jews for Jesus → Mujigye Foundation$765/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SW Engineering Company105/12/2023
Asr Engineering104/24/2023
Syed Engineering101/14/2020
MDG Design Group401/06/2020
MCRB Service103/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting203/21/2026
Boyd Consulting203/21/2026
M-Dis Design Group403/21/2026
Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Topline NYC ContractingScaffold507/08/2026
Shah Group EnterprisesScaffold407/08/2026
Site EnterGeneral Contractor303/21/2026
Cornerstone Contracting*General Contractor303/21/2026
Liquid Plumbing & Heating SCSPlumbing303/22/2026
Avon Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sead Engineering2665401/06/2020
Building Lifecycle
All (99)Filed (8)Permit Issued (9)Signed Off (4)Facade (FISP) (20)Violation (34)Objection (8)Special Inspection (16)
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/30/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00863844-I1
08/11/2023
Violation issued (ECB, open)
Construction
08/03/2023
Cycle 9 facade report submitted
07/31/2023
Cycle 9 facade report signed — SAFE
07/06/2023
Cycle 9 facade inspection completed
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/25/2023
Permit issued — General Construction
M00868830-I1-GC
05/18/2023
Objection resolved — Addressed
05/18/2023
Objection resolved — Addressed
05/17/2023
Cycle 9 facade report submitted
05/17/2023
Cycle 9 facade report signed — UNSAFE
05/17/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/16/2023
Cycle 9 facade inspection completed
05/16/2023
Objection raised — Fire_Protection
05/16/2023
Objection raised — Admin
05/12/2023
Filed — Alteration
Brick replacement, brick repointing, stucco replacement, no change to use, egress or occupancy.
M00868830-I1
05/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Levon Shaginyan
05/02/2023
Special inspection requirement — Final
Levon Shaginyan
04/25/2023
Permit issued — Sidewalk Shed
M00863844-I1-SH
04/24/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00863844-I1
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/26/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00296208-I1
10/30/2020
Cycle 8 facade report submitted
10/29/2020
Cycle 8 facade report signed — SWARMP
10/26/2020
Signed off — Alteration
HEREWITH FILE TO OBTAIN EQUIPMENT USE PERMIT FOR ROOF-TOP A.C. UNIT WITH CEILING MOUNTED AIR HANDLER FOR EXIST. MIXED-USE BUILDING (C/O#102613). NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00229072-I1
10/16/2020
Signed off — Alteration
HEREWITH FILE RENOVATE EXIST. MIXED-USE BUILDING WORK INCLUDES PLUMBING. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00229018-I1
10/14/2020
Cycle 8 facade inspection completed
09/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/18/2020
Permit issued — Plumbing
M00229018-I1-PL
04/24/2020
Permit issued — Sidewalk Shed
M00296208-I1-SH
01/15/2020
Permit issued — Sidewalk Shed
M00296208-I1-SH
01/15/2020
Special inspection requirement — Mechanical Systems
INHWAN CHANG
01/15/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
01/15/2020
Special inspection requirement — HVAC and service water heating equipment
INHWAN CHANG
01/15/2020
Special inspection requirement — HVAC insulation and sealing
INHWAN CHANG
01/15/2020
Special inspection requirement — Final
Kyumyeon Lee
01/15/2020
Special inspection requirement — HVAC and service water heating system controls
INHWAN CHANG
01/14/2020
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00296208-I1
01/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2020
Filed — Alteration
HEREWITH FILE TO OBTAIN EQUIPMENT USE PERMIT FOR ROOF-TOP A.C. UNIT WITH CEILING MOUNTED AIR HANDLER FOR EXIST. MIXED-USE BUILDING (C/O#102613). NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00229072-P1
01/04/2020
Special inspection requirement — HVAC and service water heating equipment
INHWAN CHANG
01/04/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
01/04/2020
Special inspection requirement — Mechanical Systems
INHWAN CHANG
01/04/2020
Special inspection requirement — Final
Kyumyeon Lee
01/04/2020
Special inspection requirement — HVAC and service water heating system controls
INHWAN CHANG
01/04/2020
Special inspection requirement — HVAC insulation and sealing
INHWAN CHANG
12/17/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
12/12/2019
Objection resolved — Addressed
12/12/2019
Objection resolved — Addressed
12/10/2019
Objection raised — Other
12/10/2019
Objection raised — Other
12/05/2019
Filed — Alteration
HEREWITH FILE RENOVATE EXIST. MIXED-USE BUILDING WORK INCLUDES PLUMBING. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00229018-P1
12/05/2019
Permit issued — Mechanical Systems
M00229072-I1-MS
12/04/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
10/28/2019
Permit issued — Plumbing
M00229018-I1-PL
09/17/2019
Filed — Alteration
HEREWITH FILE TO OBTAIN EQUIPMENT USE PERMIT FOR ROOF-TOP A.C. UNIT WITH CEILING MOUNTED AIR HANDLER FOR EXIST. MIXED-USE BUILDING (C/O#102613). NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00229072-I1
09/17/2019
Filed — Alteration
HEREWITH FILE RENOVATE EXIST. MIXED-USE BUILDING WORK INCLUDES PLUMBING. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00229018-I1
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/07/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCornerstone Contracting*05/25/2023
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting04/25/2023
DOB NOWPlumbingSigned-offAvon Plumbing & Heating06/18/2020
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting04/24/2020
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting01/15/2020
DOB NOWMechanical SystemsSigned-offSite Enter12/05/2019
DOB NOWPlumbingSigned-offAvon Plumbing & Heating10/28/2019
DOB NOWSidewalk ShedPermit IssuedShah Group Enterprises10/26/2018
DOB NOWSidewalk ShedPermit IssuedShah Group Enterprises04/02/2018
BISOTISSUEDHarrow Construction & Ma*07/28/2020
BISOTISSUEDSite Enter12/18/2019
BISOTISSUEDHarrow Construction & Ma*10/18/2018
BISOTISSUEDAwr Group04/18/2012
BISEQISSUEDCS Bridge03/20/2012
BISOTISSUEDAwr Group02/29/2012
BISEQISSUEDCS Bridge01/19/2012
BISPLISSUEDH2O Concept Plumbing & Heating Co02/26/2009
BISEQISSUEDRockledge Scaffold01/10/2008
BISMHRE-ISSUEDTrane U.S08/29/2007
BISOTISSUEDDJM Restoration07/31/2007
BISEQISSUEDRockledge Scaffold06/22/2007
BISFPISSUEDFire Command Co04/02/2007
BISMHISSUEDNY Friendly Construction03/10/2004
BISPLISSUEDDual Fuel Plumbing & Heating10/22/1999
BISBLISSUEDDual Fuel Plumbing & Heating10/22/1999
3 projects · most recent 05/19/2021
General Wiring Lighting
FiledStatusContractorScope
05/19/2021CompleteY.S. ElectricGeneral Wiring, Lighting
01/14/2020Permit IssuedRichard Neu—
04/02/2018Permit IssuedWCK Electric—
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/02/2023Energy Code Compliance InspectionsLevon Shaginyanprogress
05/02/2023FinalLevon Shaginyanprogress
01/15/2020Mechanical SystemsINHWAN CHANGspecial
01/15/2020Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
01/15/2020HVAC and service water heating equipment INHWAN CHANGenergy_progress
01/15/2020HVAC insulation and sealing INHWAN CHANGenergy_progress
01/15/2020FinalKyumyeon Leeprogress
01/15/2020HVAC and service water heating system controls INHWAN CHANGenergy_progress
01/04/2020HVAC and service water heating equipment INHWAN CHANGenergy_progress
01/04/2020Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
01/04/2020Mechanical SystemsINHWAN CHANGspecial
01/04/2020FinalKyumyeon Leeprogress
01/04/2020HVAC and service water heating system controls INHWAN CHANGenergy_progress
01/04/2020HVAC insulation and sealing INHWAN CHANGenergy_progress
12/17/2019Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
12/04/2019Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hope Church NYCReligiousFloors 2–7, Roof
Project M00868830 Alteration · Permit Entire · 05/12/2023
Mujigye FoundationCommunity FacilityFloors 1–7, Roof
Project M00229018 Alteration · LOC Issued · 09/17/2019
Project M00229072 Alteration · LOC Issued · 09/17/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch3
09/06/2026M00030864-I1Request digital key ↗
08/31/2026M00863844-I1Request digital key ↗
08/31/2026M00868830-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00229072-I1Request digital key ↗
08/15/2026M00229072-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00229018-I1Request digital key ↗
08/15/2026M00229018-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00296208-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION14
10/29/2020123803367Open ↗
07/23/2020140929672Open ↗
12/23/2019123803367Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION9
07/28/2020140929672Open ↗
12/18/2019123803367Open ↗
09/18/2019123803367Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications47
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
02/05/2020123803358Open ↗
02/05/2020123803358Open ↗
09/18/2019123803367Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/31/2026M00229072-P1Open ↗
08/31/2026M00229072-P1Open ↗
08/31/2026M00229072-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/05/2026M00229072-P1Open ↗
09/05/2026M00229072-I1Open ↗
09/05/2026M00229018-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026M00229072-P1Open ↗
08/31/2026M00229072-P1Open ↗
08/30/2026M00229018-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/23/2020140929672Open ↗
09/09/2019123803358Open ↗
10/15/2018140812404Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/09/2019123803358Open ↗
01/20/2012120946441Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/23/2020140929672Open ↗
10/15/2018140812404Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/23/2020140929672Open ↗
10/15/2018140812404Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/20/2012120946441Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA2
12/27/2012120575323Open ↗
02/03/2012120575323Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
09/18/2019123803367Open ↗
09/09/2019123803367Open ↗
09/09/2019123803358Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00229072-P1Open ↗
09/05/2026M00229072-I1Open ↗
09/05/2026M00229018-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/23/2020140929672Open ↗
09/09/2019123803367Open ↗
09/09/2019123803358Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/02/2012120959784Open ↗
01/12/2011120575323Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/05/2020123803358Open ↗
02/05/2020123803358Open ↗
09/18/2019123803367Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
11/25/2020123803367Open ↗
09/24/2020140929672Open ↗
02/05/2020123803358Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/25/2020123803367Open ↗
09/24/2020140929672Open ↗
07/23/2020140929672Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/23/2020140929672Open ↗
10/15/2018140812404Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/02/2012120959784Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/25/2020123803367Open ↗
11/25/2020123803367Open ↗
09/24/2020140929672Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
11/25/2020123803367Open ↗
09/24/2020140929672Open ↗
02/05/2020123803358Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
02/02/2012120959784Open ↗
01/31/2012120946441Open ↗
01/12/2011120575323Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/27/2012120575323Open ↗
03/27/2012120946441Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
09/24/2020140929672Open ↗
07/23/2020140929672Open ↗
02/05/2020123803358Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION7
11/24/2020123803367Open ↗
02/03/2020123803367Open ↗
12/18/2019123803367Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
02/05/2020123803358Open ↗
12/23/2019123803367Open ↗
12/04/2019123803367Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
09/09/2019123803367Open ↗
09/09/2019123803358Open ↗
02/02/2012120959784Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/23/2020140929672Open ↗
10/15/2018140812404Open ↗