← Back
BuildNYC
One family attached or semi-detached
109 PERRY AVENUE
STATEN ISLAND · BIN 5175355
💬 Discuss this project
2022Year Built
3Stories
A5Building Class
R3-1Zoning
2,796 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 3,064 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 1 filing · 20 docs
Attic4p · 1 filing · 4 docs
Floor 29p · 3 filings · 20 docs
Floor 19 foot curb cut9p · 5 filings · 20 docs
Basement6p · 1 filing · 20 docs
Sub-Basement4p · 2 filings · 6 docs
Site & exteriorInstall 8' construction fence2p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riderallc1307/08/2026
89-08 48th Ave307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bayside Associates103/29/2024
Lobue & Valenziano702/22/2023
A Tech Engineering NYC105/12/2022
William Montague Engineering107/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LO Bue Valenziano AIA1403/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Palermo ConstructionGeneral Contractor507/08/2026
Palermo ConstructionScaffold307/08/2026
JB Buzco PlumbingPlumbing207/08/2026
LXC ConstructionGeneral Contractor107/08/2026
Sken ServicesGeneral Contractor108/16/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S7010103/29/2024
A Tech Engineering NYC, P6738302/22/2023
Building Lifecycle
11/25/2024
Signed off — Alteration
S01028176-I1
11/20/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/12/2024
Closed: Cmu block wall under construction with excavations over 4FT. Deep. No approved drainage, plans or permits.
DOB violation · closed on the city's record
05/20/2024
Permit issued — General Construction
S01028176-I1-GC
03/29/2024
Filed — Alteration
S01028176-I1
68 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLXC Construction05/20/2024
DOB NOWCurb CutSigned-offPalermo Construction11/30/2022
DOB NOWFoundationPermit IssuedPalermo Construction10/25/2022
DOB NOWPlumbingSigned-offJB Buzco Plumbing08/01/2022
DOB NOWPlumbingSigned-offJB Buzco Plumbing06/09/2022
DOB NOWStructuralPermit IssuedPalermo Construction05/02/2022
DOB NOWConstruction FenceSigned-offPalermo Construction04/15/2022
BIS—ISSUEDSken Services08/16/2021
1 project · most recent 08/13/2022
General Wiring
FiledStatusContractorScope
08/13/2022CompleteB & R Electrical ContractingGeneral Wiring
1 project · most recent 02/22/2023
Wood
FiledStatusContractorScope
02/22/2023Permit IssuedPalermo ConstructionWood
1 project · most recent 02/22/2023
Earthwork
FiledStatusContractorScope
02/22/2023Permit IssuedPalermo ConstructionEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/20/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/07/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
12/05/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/03/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
03/29/2024Tenant Protection Plan ComplianceXIUCHENG LIspecial
03/29/2024Concrete - Cast-In-PlaceXIUCHENG LIspecial
02/24/2023Concrete - Cast-In-Placeanthony santorospecial
02/24/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
02/24/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
02/24/2023Fire-Resistance Rated Constructionanthony santoroprogress
02/24/2023Finalanthony santoroprogress
02/24/2023Energy Code Compliance Inspectionsanthony santoroprogress
02/24/2023Footing and Foundationanthony santoroprogress
02/24/2023Structural Wood Frameanthony santoroprogress
02/24/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
02/24/2023Subgrade Inspectionsanthony santorospecial
02/24/2023Air barrier - visual inspectionanthony santoroenergy_progress
02/24/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
02/24/2023Fenestration areasanthony santoroenergy_progress
02/24/2023Permanent certificateanthony santoroenergy_progress
02/24/2023Maintenance informationanthony santoroenergy_progress
02/24/2023Air barrier — testing anthony santoroenergy_progress
02/24/2023Fenestration air leakageanthony santoroenergy_progress
02/24/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
02/24/2023Interior lighting poweranthony santoroenergy_progress
02/24/2023Insulation placement and R valuesanthony santoroenergy_progress
02/24/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/22/2023Permanent certificateanthony santoroenergy_progress
02/22/2023Concrete - Cast-In-Placeanthony santorospecial
Latest 25 of 65.
100 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account