109 PRESIDENT STREET
BROOKLYN · BIN 3004462
💬 Discuss this project
1900Year Built
3Stories
C3Building Class
R6BZoning
2,880 sfGross Floor Area
4Units
Rent Stabilized10 Active Violations 2 unresolved · 8 paperwork only ▸
Four families · Owner of record: Ancar Realty · 2,000 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSprinkler system installationUnder Construction15p · 3 filings · 20 docs
Floor 3Sprinkler system installationUnder Construction33p · 3 filings · 20 docs
Floor 2Sprinkler system installationUnder Construction33p · 3 filings · 20 docs
Floor 1Sprinkler system installationUnder Construction33p · 3 filings · 20 docs
CellarSprinkler system installationUnder Construction39p · 3 filings · 20 docs
Basement10p · 1 filing · 20 docs
Sub-BasementSprinkler system installationUnder Construction24p · 2 filings · 20 docs
Site & exteriorSprinkler system installationUnder Construction14p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Anstat5109/13/2026
Ancar Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/07/2023$2.5M—109 PRESIDENT LLC → ANCAR REALTY LLC$885/sf building
06/25/2014$2.2M—Private party → 109 PRESIDENT LLC$781/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kelley Design905/02/2026
Avishay I. Mazor, P.E.209/17/2024
Andrew Katz Engineers103/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Progeny Management & Expediting Services1603/21/2026
Kelley Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gaudioso ContractingGeneral Contractor2107/08/2026
Gaudioso Contractingspecialty_contractor307/08/2026
Aspect Plumbing & HeatingPlumbing107/08/2026
Plumbing NYCFire Protection107/08/2026
L & Z RestorationGeneral Contractor510/20/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
David Katz, P.E.6087809/17/2024
Building Lifecycle
05/02/2026
Filed — Alteration CO
New front and rear stair access to cellar. New rear balconies.
B01031784-S4
04/09/2026
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
B00958861-S2-ST
04/09/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
B00958861-S3-MS
04/09/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01031784-I1-GC-CX
04/09/2026
Permit expired, never signed off — Support of Excavation
The city's record still shows this permit as issued, with no sign-off on its filing
B01031784-S1-SE
117 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGaudioso Contracting03/16/2026
DOB NOWSupport of ExcavationPermit IssuedGaudioso Contracting04/09/2025
DOB NOWGeneral ConstructionPermit IssuedGaudioso Contracting04/09/2025
DOB NOWStructuralPermit IssuedGaudioso Contracting04/09/2025
DOB NOWMechanical SystemsPermit IssuedGaudioso Contracting04/09/2025
DOB NOWStructuralPermit IssuedGaudioso Contracting04/09/2025
DOB NOWGeneral ConstructionPermit IssuedGaudioso Contracting04/09/2025
DOB NOWMechanical SystemsPermit IssuedGaudioso Contracting03/03/2025
DOB NOWSupport of ExcavationPermit IssuedGaudioso Contracting12/20/2024
DOB NOWStructuralPermit IssuedGaudioso Contracting11/08/2024
DOB NOWStructuralPermit IssuedGaudioso Contracting09/23/2024
DOB NOWPlumbingSigned-offAspect Plumbing & Heating07/30/2024
DOB NOWGeneral ConstructionPermit IssuedGaudioso Contracting07/15/2024
DOB NOWStructuralPermit IssuedGaudioso Contracting05/16/2024
DOB NOWSprinklersPermit IssuedPlumbing NYC05/08/2024
DOB NOWGeneral ConstructionPermit IssuedGaudioso Contracting11/17/2023
BISEQISSUEDL & Z Restoration10/20/2016
BISEQISSUEDL & Z Restoration10/20/2016
BISOTISSUEDL & Z Restoration06/24/2016
BISEQISSUEDL & Z Restoration11/24/2015
BISEQISSUEDL & Z Restoration11/23/2015
1 project · most recent 03/28/2024
FiledStatusContractorScope
03/28/2024Permit IssuedPlumbing Works NYC—
1 project · most recent 06/20/2025
Water/Sanitary
FiledStatusContractorScope
06/20/2025Signed-offAspect Plumbing & HeatingWater/Sanitary
1 project · most recent 08/03/2026
General Wiring
FiledStatusContractorScope
08/03/2026Permit IssuedSunbird Electrical ContractingGeneral Wiring
2 projects · most recent 05/02/2026
Wood Steel Masonry
FiledStatusContractorScope
05/02/2026Permit IssuedGaudioso ContractingSteel, Masonry, Wood
06/20/2025Permit IssuedGaudioso ContractingWood
1 project · most recent 05/02/2026
Fence
FiledStatusContractorScope
05/02/2026Permit IssuedGaudioso ContractingFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/17/2024Subsurface Investigations (Borings/Test Pits)SOORJBALLY HARILALLspecial
09/13/2024Concrete - Cast-In-PlaceDavid Katzspecial
09/13/2024Excavations - Sheeting, Shoring, and BracingDavid Katzspecial
09/13/2024Post-installed AnchorsDavid Katzspecial
09/13/2024Structural Steel - DetailsDavid Katzspecial
09/13/2024Structural Steel - High Strength BoltingDavid Katzspecial
09/06/2024Structural Stability – Alterations of existing buildingsDavid Katzspecial
09/05/2024Footing and FoundationDavid Katzprogress
09/05/2024FinalDavid Katzprogress
09/04/2024Construction Utilizing CLT or SCL, Type IVDavid Katzspecial
09/02/2024HVAC-R and service water heating equipmentBeth Kelleyenergy_progress
09/02/2024Ventilation and air distribution systemBeth Kelleyenergy_progress
08/29/2024MeteringBeth Kelleyenergy_progress
08/29/2024Fenestration air leakageBeth Kelleyenergy_progress
08/29/2024Lighting in dwelling unitsBeth Kelleyenergy_progress
08/29/2024Fenestration and door U-factor and product ratingsBeth Kelleyenergy_progress
07/21/2024Structural Stability – Alterations of existing buildingsDavid Katzspecial
04/17/2024MasonryDavid Katzspecial
04/06/2024Structural Stability – Alterations of existing buildingsDavid Katzspecial
04/06/2024Wood – Seismic ResistanceDavid Katzspecial
04/06/2024FinalDavid Katzprogress
03/25/2024Sprinkler SystemsDavid Katzspecial
01/08/2024FinalDavid Katzprogress
01/08/2024Mechanical SystemsDavid Katzspecial
01/08/2024FinalBeth Kelleyprogress
Latest 25 of 26.