← Back
Walk-up cooperative
109 SEAMAN AVENUE
MANHATTAN · Inwood · BIN 1064970
💬 Discuss this project
1918Year Built
5Stories
C6Building Class
R7AZoning
43,195 sfGross Floor Area
41Units
LL97 CoveredRent Stabilized5 Open Violations ▸
Walk-up cooperative · Owner of record: 117 SEAMAN AVE RLTY C · 12,501 sf lot · 3.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionEquipmentGeneral
Roof9p · 1 filing · 17 docs
Floor 55p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1
Cellar3p · 1 filing · 3 docs
Site & exterior16p · 2 filings · 20 docs
Filed — no permit issued11p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
117 SEAMAN AVENUE REALTY CORP.1703/22/2026
A M KATZ MANAGEMENT907/08/2026
PRESIDENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC104/11/2024
LANE ENGINEERING CONSULTING, P.C.201/23/2023
RAAD204/10/2022
AMY GREEN DESIGN ARCHITECT107/12/2021
ASHRAF CORP105/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY LLC103/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
CLARKE CONSTRUCTION CONSULTANTS103/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EV HOME RENOVATIONS CORPGeneral Contractor307/08/2026
NOBLE MECHANICAL CORPPlumbing303/22/2026
FERRY, ANTHONYElectrical103/21/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
JOHNSON, GRADElectrical103/21/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
P & D MECHANICAL CORPFire Protection107/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor107/08/2026
SKY RISE RESTORATION INCGeneral Contractor107/08/2026
RAYMOND WILSONElectrical103/21/2026
CHELLI, NINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129104/11/2024
LANE ENGINEERING CONSULTI2967201/23/2023
RAAD7727204/10/2022
Building Lifecycle
All (77)Filed (7)Permit Issued (5)Signed Off (3)Violation (46)Inspection (3)Objection (2)Special Inspection (11)
10/29/2024
Signed off — Alteration
M01029419-I1
05/31/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/29/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/02/2024
Permit issued — Sprinklers
M01029419-I1-EW-SP
04/11/2024
Filed — Alteration
M01029419-I1
04/06/2023
Signed off — Alteration
EXTERIOR REPAIRS TO INCLUDE LOCALIZED PARAPET WALL REPAIRS, MASONRY REPLACEMENT, POINTING,ROOF DRAIN WATERPROOFING, EMERGENCY OVERFLOW SCUPPER INSTALLATION AND STEEL LINTEL MAINTENANCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00773489-I1
03/13/2023
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
03/13/2023
Special inspection requirement — Masonry
Douglas Lane
03/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
03/13/2023
Special inspection requirement — Final
Douglas Lane
03/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
01/31/2023
Objection resolved — Addressed
01/30/2023
Objection raised — Accessibility
01/23/2023
Filed — Alteration
EXTERIOR REPAIRS TO INCLUDE LOCALIZED PARAPET WALL REPAIRS, MASONRY REPLACEMENT, POINTING,ROOF DRAIN WATERPROOFING, EMERGENCY OVERFLOW SCUPPER INSTALLATION AND STEEL LINTEL MAINTENANCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00773489-P1
01/18/2023
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
01/18/2023
Special inspection requirement — Masonry
Douglas Lane
01/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
01/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
01/18/2023
Special inspection requirement — Final
Douglas Lane
08/19/2022
Permit issued — General Construction
M00773489-I1-GC
08/17/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/21/2022
Filed — Alteration
EXTERIOR REPAIRS TO INCLUDE LOCALIZED PARAPET WALL REPAIRS, MASONRY REPLACEMENT, POINTING,ROOF DRAIN WATERPROOFING, EMERGENCY OVERFLOW SCUPPER INSTALLATION AND STEEL LINTEL MAINTENANCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00773489-I1
06/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/10/2022
Filed — Alteration
Installation of New HVAC System
M00572756-P1
12/20/2021
Signed off — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00524815-I1
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/23/2021
Filed — Alteration
Installation of New HVAC System
M00572756-I1
11/16/2021
Permit issued — General Construction
M00550763-I1-GC
08/11/2021
Permit issued — General Construction
M00550763-I1-GC
07/12/2021
Filed — Alteration
INTERIOR RENOVATION OF APT 5FH ON THE 5TH FL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00550763-I1
07/01/2021
Violation issued (ECB, closed)
Construction
05/19/2021
Filed — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00524815-I1
05/19/2021
Permit issued — Sidewalk Shed
M00524815-I1-SH
05/19/2021
Special inspection requirement — Final
Eric Foster
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2019
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2017
Violation issued (HPD, open)
B
01/24/2017
Violation issued (HPD, closed)
B
01/24/2017
Violation issued (HPD, closed)
B
01/24/2017
Violation issued (HPD, closed)
A
01/24/2017
Violation issued (HPD, open)
B
01/24/2017
Violation issued (HPD, closed)
A
01/24/2017
Violation issued (HPD, closed)
C
01/24/2017
Violation issued (HPD, closed)
B
09/01/2016
Violation issued (HPD, closed)
C
07/12/2016
Violation issued (HPD, closed)
C
06/16/2015
Violation issued (HPD, closed)
B
06/16/2015
Violation issued (HPD, closed)
B
06/16/2015
Violation issued (HPD, closed)
B
06/16/2015
Violation issued (HPD, closed)
B
06/16/2015
Violation issued (HPD, closed)
B
05/27/2015
Violation issued (HPD, closed)
A
07/05/2013
Violation issued (HPD, closed)
B
07/05/2013
Violation issued (HPD, closed)
C
07/05/2013
Violation issued (HPD, closed)
A
07/05/2013
Violation issued (HPD, closed)
C
07/05/2013
Violation issued (HPD, closed)
B
07/05/2013
Violation issued (HPD, closed)
A
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offP & D MECHANICAL CORP05/02/2024
DOB NOWGeneral ConstructionSigned-offSKY RISE RESTORATION INC08/19/2022
DOB NOWGeneral ConstructionPermit IssuedEV HOME RENOVATIONS11/16/2021
DOB NOWGeneral ConstructionPermit IssuedEV HOME RENOVATIONS08/11/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION05/19/2021
BISOTISSUEDKAMTECH RESTORATION CORP12/13/2018
BISPLISSUEDORBIT PLBG & HTG INC06/25/2018
BISOTISSUEDDJM RESTORATION INC10/11/2012
BISOTISSUEDDJM RESTORATION INC11/17/2011
BISEQISSUEDROCKLEDGE SCAFFOLD CORP11/07/2011
BISPLISSUEDBILLHARZ PLUMBING, INC10/07/2009
BISOTISSUEDDARINE GENERAL CONSTRUCTION01/26/2007
BISBLISSUEDBILLHARZ PLMB INC07/05/2005
BISPLISSUEDBILLHARZ PLMB INC07/05/2005
BISPLISSUEDCOOPER MECHANICAL CORP11/04/2004
BISOTISSUEDAJC STUDIOS07/22/2004
BISOTISSUEDSATO CONSTRUCTION CO.INC06/03/2004
BISOTISSUEDRENOVATION BY MY HOME INC10/24/2002
BISEQISSUEDBRIDGEMASTER OF NY03/06/1996
1 project · most recent 04/10/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2022——Air Conditioning Systems
Cooling
Lg ARUN060GSS4 60,000 BTU · Vrf Outdoor ×2
5 projects · most recent 02/08/2022
General Wiring
FiledStatusContractorScope
02/08/2022CompleteGEMINI ELECTRIC CO., INC.General Wiring
05/17/2021CompleteSTEVEN FARKAS—
08/24/2020CompleteJ.H.I. ELECTRIC LLCGeneral Wiring
01/29/2019CompleteBERGER QUALITY ELEC'L CON2 meters, 2 new_meters
12/03/2018CompleteBERGER QUALITY ELEC'L CON—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/31/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/17/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
03/13/2023Air barrier - visual inspectionDouglas Laneenergy_progress
03/13/2023MasonryDouglas Lanespecial
03/13/2023Structural Stability – Alterations of existing buildingsDouglas Lanespecial
03/13/2023FinalDouglas Laneprogress
03/13/2023Energy Code Compliance InspectionsDouglas Laneprogress
01/18/2023Air barrier - visual inspectionDouglas Laneenergy_progress
01/18/2023MasonryDouglas Lanespecial
01/18/2023Structural Stability – Alterations of existing buildingsDouglas Lanespecial
01/18/2023Energy Code Compliance InspectionsDouglas Laneprogress
01/18/2023FinalDouglas Laneprogress
05/19/2021FinalEric Fosterprogress
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00524815-I1Request digital key ↗
09/03/2026M00550763-I1Request digital key ↗
09/03/2026M00572756-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
03/30/2023123238932Open ↗
10/19/2022123238932Open ↗
11/13/2019140815768Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
12/13/2018140815768Open ↗
06/25/2018123238932Open ↗
10/16/2012120712194Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/20/2023123238932Open ↗
04/11/2016122747386Open ↗
10/10/2014120885471Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00550763-I1Open ↗
09/01/2026M00773489-P1Open ↗
09/01/2026M00773489-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026M00773489-P1Open ↗
08/29/2026M00773489-P1Open ↗
08/29/2026M00773489-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026M00773489-P1Open ↗
08/29/2026M00773489-P1Open ↗
08/29/2026M00773489-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/13/2018123238932Open ↗
11/09/2011120885471Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/09/2011120885471Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/13/2018123238932Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/08/2018140815768Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/13/2018123238932Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
06/13/2018123238932Open ↗
05/09/2016122747386Open ↗
11/08/2018140815768Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00550763-I1Open ↗
09/01/2026M00773489-I1Open ↗
08/27/2026M01029419-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
11/08/2018140815768Open ↗
06/13/2018123238932Open ↗
04/11/2016122747386Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/09/2011120885471Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/09/2011120712194Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/02/2023123238932Open ↗
05/02/2023123238932Open ↗
03/19/2020140815768Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/02/2023123238932Open ↗
03/19/2020140815768Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/13/2018123238932Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/08/2018140815768Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/19/2020140815768Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00773489-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
05/02/2023123238932Open ↗
05/02/2023123238932Open ↗
03/30/2023123238932Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/04/2023123238932Open ↗
10/10/2014120885471Open ↗
02/10/2015120712194Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/09/2011120885471Open ↗
06/09/2011120712194Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/19/2020140815768Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/10/2014120885471Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
03/19/2020140815768Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
05/02/2023123238932Open ↗
05/02/2023123238932Open ↗
03/19/2020140815768Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION5
03/30/2023123238932Open ↗
01/10/2020140815768Open ↗
12/20/2019140815768Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
06/13/2018123238932Open ↗
04/11/2016122747386Open ↗
11/09/2011120885471Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/08/2018140815768Open ↗
▸Other Documents1
▸BISDHCR DOCUMENT1
04/27/2020140815768Open ↗