← Back
Two family brick
109 VANDERBILT STREET
BROOKLYN · BIN 3122093
💬 Discuss this project
1901Year Built
2Stories
B1Building Class
R5Zoning
2,892 sfGross Floor Area
2Units
Two family brick · 1,440 sf lot · 2.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 2 filings · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 2Under Construction22p · 2 filings · 20 docs
Floor 1Under Construction24p · 2 filings · 20 docs
CellarUnder Construction18p · 3 filings · 20 docs
BasementUnder Construction8p · 1 filing · 20 docs
1 job · most recent 01/05/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/05/2026Permit IssuedJ S REMODELING NY INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ2 41,000 BTU · Condensing Unit ×1
PUZ-A18NKA7 22,000 BTU · Condensing Unit ×1
Ventilation
Zehnder COMFOAIR Q350 205 CFM · Erv ×1
1 job · most recent 01/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/05/2026Permit IssuedPLBG P & H INCGas, Storm, Water/Sanitary
2 jobs · most recent 09/16/2026
General Wiring
FiledStatusContractorScope
09/16/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
06/06/2022CompleteKJK ELECTRIC INCGeneral Wiring
1 job · most recent 01/05/2026
Steel Wood
FiledStatusContractorScope
01/05/2026Permit IssuedPLBG P & H INCSteel, Wood
Building Lifecycle
All (120)Filed (12)Permit Issued (10)Signed Off (4)Inspection (4)Objection (61)Special Inspection (29)
09/14/2026
Permit issued — Plumbing
B01326661-S2-PL
09/01/2026
Permit issued — General Construction
B01326661-I1-GC
09/01/2026
Permit issued — Structural
B01326661-S3-ST
09/01/2026
Permit issued — Mechanical Systems
B01326661-S1-MS
04/13/2026
Objection resolved — Resolved
04/06/2026
Objection resolved — Addressed
02/26/2026
Objection raised — Zoning
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/28/2026
Objection resolved — Addressed
01/26/2026
Objection resolved — Addressed
01/26/2026
Objection resolved — Addressed
01/26/2026
Objection resolved — Addressed
01/21/2026
Objection raised — Cost
01/21/2026
Objection raised — Zoning
01/21/2026
Objection raised — Admin
01/21/2026
Objection raised — Energy
01/21/2026
Objection raised — Inspections
01/21/2026
Objection raised — Plumbing
01/21/2026
Objection raised — Zoning
01/21/2026
Objection raised — Plumbing
01/21/2026
Objection raised — Energy
01/05/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION W/RENOVATION AND CONVERSION FROM 2 TO 1 FAMILY. INSTALL PLUMBING FIXTURES AND PIPING.
B01326661-S1
01/05/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION W/RENOVATION AND CONVERSION FROM 2 TO 1 FAMILY. INSTALL PLUMBING FIXTURES AND PIPING.
B01326661-I1
01/05/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION W/RENOVATION AND CONVERSION FROM 2 TO 1 FAMILY. INSTALL PLUMBING FIXTURES AND PIPING.
B01326661-S2
01/05/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION W/RENOVATION AND CONVERSION FROM 2 TO 1 FAMILY. INSTALL PLUMBING FIXTURES AND PIPING.
B01326661-S3
12/16/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Ivan Luk
12/16/2025
Special inspection requirement — Structural Wood Frame
Ivan Luk
12/16/2025
Special inspection requirement — Final
Ivan Luk
12/16/2025
Special inspection requirement — Structural Steel - Welding
Ivan Luk
12/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Ivan Luk
12/16/2025
Special inspection requirement — Post-installed Anchors
Ivan Luk
12/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ivan Luk
12/16/2025
Special inspection requirement — Structural Cold-Formed Steel
Ivan Luk
12/16/2025
Special inspection requirement — Structural Steel - Details
Ivan Luk
09/07/2022
Signed off — Alteration
cellar: install new plumbing fixtures and piping distribution. remove and relocate the existing gas-fired hot water heater. no change in use, egress or occupancy.
B00522417-I1
07/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kam Chiu
07/15/2022
Filed — Alteration
cellar: install new plumbing fixtures and piping distribution. remove and relocate the existing gas-fired hot water heater. no change in use, egress or occupancy.
B00522417-P3
05/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kam Chiu
05/12/2022
Signed off — Alteration
INTERIOR RENOVATIONS, NEW PARTITIONS AND WINDOWS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522295-I1
05/12/2022
Signed off — Alteration
INTERIOR RENOVATIONS, NEW PARTITIONS AND WINDOWS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522295-S1
05/06/2022
Permit issued — Mechanical Systems
B00522295-S1-MS
05/05/2022
Signed off — Alteration
INTERIOR RENOVATIONS, NEW PARTITIONS AND WINDOWS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522295-S2
05/05/2022
Permit issued — General Construction
B00522295-I1-GC
05/03/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/18/2022
Objection resolved — Addressed
04/17/2022
Objection raised — Scope
04/07/2022
Filed — Alteration
cellar: install new plumbing fixtures and piping distribution. remove and relocate the existing gas-fired hot water heater. no change in use, egress or occupancy.
B00522417-P2
04/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kam Chiu
01/14/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/21/2021
Filed — Alteration
cellar: install new plumbing fixtures and piping distribution. remove and relocate the existing gas-fired hot water heater. no change in use, egress or occupancy.
B00522417-P1
12/20/2021
Filed — Alteration
INTERIOR RENOVATIONS, NEW PARTITIONS AND WINDOWS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522295-P1
12/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kam Chiu
11/12/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/29/2021
Permit issued — General Construction
B00522295-I1-GC
09/27/2021
Permit issued — Plumbing
B00522417-I1-PL
09/23/2021
Permit issued — Structural
B00522295-S2-ST
09/23/2021
Permit issued — Mechanical Systems
B00522295-S1-MS
Latest 60 of 120 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/14/2021$1.5M—Private party → Private party$527/sf building
04/24/2018$1.5M—— → —$510/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1603/21/2026
ANZALONE ARCHITECTURE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J S REMODELING NY INCGeneral Contractor1209/02/2026
PLBG P & H INCPlumbing209/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IVAN DESIGN ENGINEERING &6983201/05/2026
QUALITY TESTING, LLC7344301/05/2026
KAM W CHIU1429507/15/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLBG P & H INC09/14/2026
DOB NOWGeneral ConstructionPermit IssuedJ S REMODELING NY INC09/01/2026
DOB NOWStructuralPermit IssuedJ S REMODELING NY INC09/01/2026
DOB NOWMechanical SystemsPermit IssuedJ S REMODELING NY INC09/01/2026
DOB NOWMechanical SystemsSigned-offJ S REMODELING NY INC05/06/2022
DOB NOWGeneral ConstructionSigned-offJ S REMODELING NY INC05/05/2022
DOB NOWGeneral ConstructionSigned-offJ S REMODELING NY INC10/29/2021
DOB NOWPlumbingSigned-offPLBG P & H INC09/27/2021
DOB NOWStructuralSigned-offJ S REMODELING NY INC09/23/2021
DOB NOWMechanical SystemsSigned-offJ S REMODELING NY INC09/23/2021
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/03/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/12/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/16/2025Construction Operations Influencing Adjacent StructuresIvan Lukspecial
12/16/2025Structural Wood FrameIvan Lukprogress
12/16/2025FinalIvan Lukprogress
12/16/2025Structural Steel - WeldingIvan Lukspecial
12/16/2025Structural Steel - High Strength BoltingIvan Lukspecial
12/16/2025Post-installed AnchorsIvan Lukspecial
12/16/2025Structural Stability – Alterations of existing buildingsIvan Lukspecial
12/16/2025Structural Cold-Formed SteelIvan Lukspecial
12/16/2025Structural Steel - DetailsIvan Lukspecial
07/22/2022Fire-Resistant Penetrations and JointsKam Chiuspecial
05/20/2022Fire-Resistant Penetrations and JointsKam Chiuspecial
04/06/2022Fire-Resistant Penetrations and JointsKam Chiuspecial
12/17/2021Fire-Resistant Penetrations and JointsKam Chiuspecial
05/26/2021HVAC-R and service water heating equipmentKam Chiuenergy_progress
05/26/2021FinalKam Chiuprogress
05/26/2021Concrete - Cast-In-PlaceIvan Lukspecial
05/26/2021Post-installed AnchorsIvan Lukspecial
05/26/2021Structural Stability – Alterations of existing buildingsIvan Lukspecial
05/26/2021Structural Steel - DetailsIvan Lukspecial
05/26/2021Structural Steel - High Strength BoltingIvan Lukspecial
05/26/2021Structural Steel - WeldingIvan Lukspecial
05/26/2021Subgrade InspectionsIvan Lukspecial
05/26/2021Subsurface Conditions – Fill Placement & In-Place DensityIvan Lukspecial
05/26/2021FinalIvan Lukprogress
05/26/2021Structural Wood FrameIvan Lukprogress
Latest 25 of 29.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/01/2026B00522295-P1Request digital key ↗
09/01/2026B00522295-S2Request digital key ↗
08/30/2026B00522417-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
01/08/2021321761492Open ↗
10/02/2018321761492Open ↗
05/30/2018321761492Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 16
08/13/2026B00522417-P1Open ↗
08/13/2026B00522417-I1Open ↗
08/13/2026B00522295-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01326661-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026B00522417-I1Open ↗
08/28/2026B00522417-P2Open ↗
08/26/2026B00522417-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/19/2026B01326661-S3Open ↗
08/19/2026B01326661-I1Open ↗
08/19/2026B01326661-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/26/2026B00522295-S2Open ↗
08/26/2026B00522295-S2Open ↗
08/26/2026B00522295-S1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/30/2018321761492Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/30/2018321761492Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
05/30/2018321761492Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01326661-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/19/2026B01326661-S3Open ↗
08/15/2026B01326661-S1Open ↗
08/15/2026B01326661-S2Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00522295-S1Open ↗
08/13/2026B00522295-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/30/2018321761492Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
10/02/2018321761492Open ↗
▸BISEFILING COVER SHEET1
05/30/2018321761492Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/15/2026B01326661-I1Open ↗