← Back
Elevator co-op, conversion from loft/warehouse
109 WEST 26 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1015040
💬 Discuss this project
1910Year Built
11Stories
D0Building Class
M1-8A/R11Zoning
53,350 sfGross Floor Area
15Units
LL97 CoveredRent Stabilized14 Open Violations 7 unresolved · 7 paperwork only ▸FISP: SWARMP
Elevator co-op, conversion from loft/warehouse · Owner of record: 109 W 26TH ST OWNER CORP · 4,905 sf lot · 10.88 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof1p · 1 filing · 5 docs
Floor 71p · 1 filing · 2 docs
Floor 6
Floor 5
Floor 43p · 1 filing · 20 docs
Floor 34p · 1 filing · 14 docs
Floor 24p · 2 filings · 20 docs
Floor 1
Cellar5p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DICKINSON CAMERON CONSTRUCTION COMP1207/08/2026
109 WEST 26 OWNERS3704/09/2026
BETHPAGE FEDERAL CREDIT UNION603/22/2026
109 W 26TH STREET OWNER2403/22/2026
109 WEST 26TH ST OWNERS2903/22/2026
108 W 26TH OWNER CORP103/22/2026
ARGO403/22/2026
109 WEST OWNERS CORP 50 W103/22/2026
109 WEST 26 OWNERS COR303/22/2026
109 WEST 26 STREET OWN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOVA CONSTRUCTION SERVICEGeneral Contractor1304/09/2026
DICKINSON CAMERON CONSTRUCTIONGeneral Contractor907/08/2026
TRIBUTE RESTORATION INCGeneral Contractor403/21/2026
THE SCI CONSTRUCTIONGeneral Contractor303/21/2026
GW MECHANICAL CORPPlumbing207/08/2026
PHOENIX PLMBG & MECH CORPFire Protection107/08/2026
LEGACY PLUMBING & HTG LLCPlumbing107/08/2026
RAPTOR MECHANICAL,INCPlumbing107/08/2026
DREW ROMANELLOElectrical103/21/2026
GOING SIGN SVCNGScaffold107/08/2026
FRANK LA GREGAElectrical103/21/2026
MARC CANNELLAElectrical103/21/2026
MICHAEL LIFRIERIElectrical103/21/2026
P & D MECHANICAL CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASSURE PROFESSIONAL ENGIN6962112/11/2025
IP CONCRETE TESTING AND I6252208/29/2024
AR CONSULTING ENGINEER P.4054109/11/2023
JON LIBASCI3068103/03/2023
RICHARD H. BALSER ENGINEE3028412/13/2022
HIGH LINE ENGINEERING PC2920111/13/2019
Building Lifecycle
All (157)Filed (19)Permit Issued (22)Signed Off (11)Facade (FISP) (6)Violation (60)Inspection (7)Objection (2)Special Inspection (30)
03/16/2026
Signed off — Alteration
M01304028-I1
02/26/2026
Signed off — Alteration
M00924216-I1
12/23/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00488002-I1
12/23/2025
Permit issued — Mechanical Systems
M01304028-I1-MS
12/11/2025
Filed — Alteration
M01304028-I1
11/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
10/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GUNJAN KHANDWALA
10/16/2025
Special inspection requirement — Mechanical Systems
GUNJAN KHANDWALA
10/16/2025
Special inspection requirement — Final
GUNJAN KHANDWALA
10/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
GUNJAN KHANDWALA
10/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
GUNJAN KHANDWALA
10/16/2025
Special inspection requirement — Maintenance information
GUNJAN KHANDWALA
08/26/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/01/2025
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01163582-I1
01/30/2025
Permit issued — Sign
M01163582-I1-SG
01/28/2025
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01163582-I1
12/31/2024
Permit issued — Sidewalk Shed
M00488002-I1-SH
10/23/2024
Signed off — Alteration
All work done & completed under DOB# 123507311. Minor as builts to be shown on submitted plans. No change in use, egress, or occupancy.
M01050184-I1
09/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/06/2024
Objection raised — Scope
09/06/2024
Objection resolved — Addressed
08/29/2024
Filed — Alteration
REMOVAL OF AN EXISTING SINK & INTRODUCTION OF NEW ROUGHING AS PER PLANS. (APPROXIMATELY 3,735 S.F.).NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01093143-S1
08/29/2024
Filed — Alteration
REMOVAL OF AN EXISTING SINK & INTRODUCTION OF NEW ROUGHING AS PER PLANS. (APPROXIMATELY 3,735 S.F.).NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01093143-I1
08/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
08/29/2024
Special inspection requirement — Lighting in dwelling units
INDARDEO PARBHUNATH
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
08/07/2024
Special inspection requirement — Final
Andrew Fredman
08/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
08/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
07/24/2024
Permit issued — Plumbing
M01050184-I1-PL
07/11/2024
Filed — Alteration
All work done & completed under DOB# 123507311. Minor as builts to be shown on submitted plans. No change in use, egress, or occupancy.
M01050184-I1
05/01/2024
Signed off — Alteration
Facade, masonry and exterior repairs as per drawings. No change in use, egress or occupancy is involved under this application.
M08044207-I1
12/29/2023
Permit issued — Sidewalk Shed
M00488002-I1-SH
09/12/2023
Permit issued — Supported Scaffold
M00924216-I1-SF
09/11/2023
Filed — Alteration
M00924216-I1
07/24/2023
Permit issued — General Construction
M08044207-I1-GC
06/02/2023
Permit issued — Sidewalk Shed
M00488002-I1-SH
03/03/2023
Filed — Alteration
Facade, masonry and exterior repairs as per drawings. No change in use, egress or occupancy is involved under this application.
M08044207-I1
01/12/2023
Signed off — Alteration
MECHANICAL WORK ASSOCIATED WITH OFFICE RENOVATION AS PER PLANS FILED HEREWITH.
M00545346-I1
01/12/2023
Signed off — Alteration
M00536980-I1
12/14/2022
Special inspection requirement — Maintenance information
Balser Richard
12/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Balser Richard
12/14/2022
Special inspection requirement — Shutoff dampers
Balser Richard
12/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
Balser Richard
12/14/2022
Special inspection requirement — Lighting controls
Balser Richard
12/14/2022
Special inspection requirement — Mechanical Systems
Balser Richard
12/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Balser Richard
12/14/2022
Special inspection requirement — Final
Balser Richard
12/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Balser Richard
12/14/2022
Special inspection requirement — Interior lighting power
Balser Richard
12/13/2022
Filed — Alteration
MECHANICAL WORK ASSOCIATED WITH OFFICE RENOVATION AS PER PLANS FILED HEREWITH.
M00545346-P1
11/22/2022
Special inspection requirement — Final
Robert Bates
11/22/2022
Special inspection requirement — Tenant Protection Plan Compliance
jon libasci
11/10/2022
Permit issued — Mechanical Systems
M00545346-I1-MS
11/10/2022
Permit issued — General Construction
M00536980-I1-GC
11/02/2022
Violation issued (HPD, closed)
I
10/28/2022
Signed off — Alteration
M00545330-I1
10/25/2022
Cycle 9 facade report signed — SWARMP
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTHE SCI CONSTRUCTION12/23/2025
DOB NOWSignSigned-offPOLSINELLI, HENRY01/30/2025
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE12/31/2024
DOB NOWPlumbingSigned-offLEGACY PLUMBING & HEATING07/24/2024
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE12/29/2023
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC09/12/2023
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC07/24/2023
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE06/02/2023
DOB NOWMechanical SystemsSigned-offDICKINSON CAMERON CONSTRU11/10/2022
DOB NOWGeneral ConstructionSigned-offDICKINSON CAMERON CONSTRU11/10/2022
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE06/16/2022
DOB NOWMechanical SystemsSigned-offDICKINSON CAMERON CONSTRU12/04/2021
DOB NOWGeneral ConstructionSigned-offDICKINSON CAMERON CONSTRU12/01/2021
DOB NOWPlumbingSigned-offP & D MECHANICAL CORP11/16/2021
DOB NOWPlumbingSigned-offRAPTOR MECHANICAL, INC11/01/2021
DOB NOWGeneral ConstructionSigned-offDICKINSON CAMERON CONSTRU07/28/2021
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE06/16/2021
DOB NOWProtection and Mechanical MethodsPermit IssuedNOVA CONSTRUCTION SERVICE04/15/2021
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE04/15/2021
DOB NOWPlumbingSigned-offGW MECHANICAL CORP11/09/2020
DOB NOWSprinklersSigned-offGW MECHANICAL CORP01/30/2020
DOB NOWPlumbingSigned-offGW MECHANICAL CORP12/02/2019
BISSPISSUEDGO PRO FIRE PROTECTION C03/02/2022
BISOTISSUEDNOVA CONSTRUCTION SERVICE01/13/2022
BISOTISSUEDNOVA CONSTRUCTION SERVICE07/14/2021
BIS—ISSUEDDUTCHESS CABINETS OF NY *09/28/2020
BISSPISSUEDC.H.P.H. CO02/19/2019
BISOTISSUEDINTREVCO INC10/23/2018
BISPLISSUEDPLUMBING NYC INC08/21/2018
BISOTISSUEDJAVA MANAGEMENT LLC08/08/2018
BISSPISSUEDSIRINA FIRE PROT CORP01/10/2018
BISMHISSUEDVRD CONTRACTING INC11/16/2017
BISOTISSUEDVRD CONTRACTING INC11/16/2017
BISPLISSUEDMETROTECH MECHANICAL CORP03/27/2017
BISOTISSUEDDICKINSON CAMERON CONSTRUCTION03/03/2017
BISOTISSUEDGOING SIGN & SERVICING CO10/27/2016
BIS—ISSUEDGOING SIGN & SVCNG CO,INC10/27/2016
BIS—ISSUEDGOING SIGN & SVCNG CO,INC10/27/2016
BISOTISSUEDGOING SIGN & SERVICING CO10/25/2016
BISOTISSUEDGOING SIGN & SERVICING CO10/25/2016
+ 32 more permits on file
1 project · most recent 08/29/2024
Water/Sanitary
FiledStatusContractorScope
08/29/2024——Water/Sanitary
8 projects · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026CompleteROMCON ELECTRIC, INC13 meters, 1 new_meters
08/13/2025Permit IssuedCANNELLA ELECTRIC INC—
11/30/2022Permit IssuedALL CITY ELECTL CONTS INCGeneral Wiring
04/27/2021CompleteCAVAN ELECTRIC CORP.General Wiring
04/06/2021Permit IssuedTOP SHELF ELECTRIC CORP—
10/29/2020CompleteARC POWER ELECL CONTS INCGeneral Wiring
11/04/2019Permit IssuedBLUE SEAGULL ELECTRICALGeneral Wiring
05/24/2018CompleteROCKMOR ELEC. ENTERPR INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/17/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/03/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
11/25/2025Tenant Protection Plan ComplianceGUNJAN KHANDWALAspecial
10/16/2025HVAC-R and service water piping design and insulationGUNJAN KHANDWALAenergy_progress
10/16/2025Mechanical SystemsGUNJAN KHANDWALAspecial
10/16/2025FinalGUNJAN KHANDWALAprogress
10/16/2025HVAC-R and service water heating equipmentGUNJAN KHANDWALAenergy_progress
10/16/2025HVAC-R and service water heating system controlsGUNJAN KHANDWALAenergy_progress
10/16/2025Maintenance informationGUNJAN KHANDWALAenergy_progress
08/29/2024Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
08/29/2024Lighting in dwelling unitsINDARDEO PARBHUNATHenergy_progress
08/29/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/29/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/29/2024Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
08/07/2024FinalAndrew Fredmanprogress
08/07/2024Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
08/07/2024Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
12/14/2022Maintenance informationBalser Richardenergy_progress
12/14/2022HVAC-R and service water piping design and insulationBalser Richardenergy_progress
12/14/2022Shutoff dampersBalser Richardenergy_progress
12/14/2022HVAC-R and service water heating system controlsBalser Richardenergy_progress
12/14/2022Lighting controlsBalser Richardenergy_progress
12/14/2022Mechanical SystemsBalser Richardspecial
12/14/2022Energy Code Compliance InspectionsBalser Richardprogress
12/14/2022FinalBalser Richardprogress
12/14/2022HVAC-R and service water heating equipmentBalser Richardenergy_progress
12/14/2022Interior lighting powerBalser Richardenergy_progress
Latest 25 of 53.
▾Documents — 599 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch13
09/03/2026M00488014-I1Request digital key ↗
09/03/2026M00488002-I1Request digital key ↗
09/03/2026M00536980-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00262321-P3Request digital key ↗
09/05/2026M00262321-I1Request digital key ↗
08/15/2026M00262321-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00263802-I1Request digital key ↗
▸Applications & Permits110
▸BISPLAN / WORK APPROVAL APPLICATION66
07/20/2023123507311Open ↗
06/30/2023123507311Open ↗
06/12/2023123507311Open ↗
Showing 3 of 66 on file for this type
▸BISWORK PERMIT APPLICATION41
03/03/2022123504001Open ↗
01/14/2022123780854Open ↗
01/07/2022123780854Open ↗
Showing 3 of 41 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
04/16/2021123780854Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/30/2020123518746Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/01/2020123518746Open ↗
▸Seals & Professional Certifications161
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION61
02/21/2020123518746Open ↗
09/13/2019123364778Open ↗
09/13/2019123364778Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
08/31/2026M00262321-P4Open ↗
08/31/2026M00262321-P4Open ↗
08/31/2026M00262321-P4Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/05/2026M00262321-P3Open ↗
09/05/2026M00262321-I1Open ↗
09/05/2026M00262321-P2Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
05/28/2019123780854Open ↗
10/24/2018123507311Open ↗
Showing 2 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
05/28/2019123780854Open ↗
10/24/2018123507311Open ↗
Showing 2 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026M00263802-I1Open ↗
08/31/2026M08044207-I1Open ↗
08/27/2026M00545346-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/21/2019140849321Open ↗
05/21/2019140849312Open ↗
▸Trade Schedules & Equipment37
▸BISSCHEDULE B - PLUMBING13
05/21/2019140849321Open ↗
Showing 1 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
09/16/2019123364778Open ↗
10/24/2018123507311Open ↗
10/12/2018123504001Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS1
01/04/2022140237054Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/04/2022140237054Open ↗
▸BISSPRINKLER SYSTEMS1
01/04/2022140237054Open ↗
▸BISPLUMBING (PL) SIGNOFF1
01/12/2022140237054Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
01/18/2022140237054Open ↗
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes10
05/28/2019123780854Open ↗
05/21/2019140849321Open ↗
05/21/2019140849312Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan6
09/05/2026M00262321-I1Open ↗
09/05/2026M00262321-P3Open ↗
09/05/2026M00262321-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos41
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
02/21/2020123518746Open ↗
05/28/2019123780854Open ↗
05/21/2019140849321Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/05/2026M00262321-P3Open ↗
09/05/2026M00262321-I1Open ↗
09/05/2026M00262321-P2Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance55
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
09/13/2019123364778Open ↗
05/28/2019123780854Open ↗
10/24/2018123507311Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
11/30/2023123507311Open ↗
11/28/2023123507311Open ↗
11/25/2023123507311Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/30/2023123507311Open ↗
11/28/2023123507311Open ↗
11/25/2023123507311Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
01/04/2022140237054Open ↗
12/16/2021123518746Open ↗
09/25/2020123518746Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
01/04/2022140237054Open ↗
▸BIS* DUCT LEAKAGE TESTING1
01/04/2022140237054Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
01/04/2022140237054Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/04/2022140237054Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00545346-I1Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY19
11/28/2023123507311Open ↗
11/28/2023123507311Open ↗
11/28/2023123507311Open ↗
Showing 3 of 19 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/04/2022140237054Open ↗
12/16/2021123518746Open ↗
▸BISMECHANICAL SYSTEMS1
01/04/2022140237054Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
01/04/2022140237054Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/16/2021123518746Open ↗
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
03/10/2022123780854Open ↗
11/21/2018123275990Open ↗
07/10/2018123255315Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
09/04/2020123518746Open ↗
09/04/2020123518746Open ↗
Showing 2 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
09/03/2020123518746Open ↗
08/18/2020123518746Open ↗
Showing 2 of 3 on file for this type
▸BISMECHANICAL (MH) SIGNOFF1
01/12/2022140237054Open ↗
▸BISSUPERSEDING LETTER1
03/03/2022123504001Open ↗
▸BISFINAL1
01/04/2022140237054Open ↗
▸Cost, Insurance & Ownership51
▸BISCOST AFFIDAVIT50
11/30/2023123507311Open ↗
11/28/2023123507311Open ↗
11/25/2023123507311Open ↗
Showing 3 of 50 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/04/2022140237054Open ↗
▸Filing & Intake Forms52
▸BISEFILING COVER SHEET27
02/21/2020123518746Open ↗
05/28/2019123780854Open ↗
10/24/2018123507311Open ↗
Showing 3 of 27 on file for this type
▸BISADDITIONAL INFORMATION11
07/20/2023123507311Open ↗
01/14/2022123780854Open ↗
09/04/2019140849321Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM9
03/03/2022123504001Open ↗
01/14/2022123780854Open ↗
01/07/2022123780854Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
05/21/2019140849321Open ↗
05/21/2019140849312Open ↗
Showing 2 of 5 on file for this type
▸Other Documents4
▸BISPRELIMINARY2
01/04/2022140237054Open ↗
12/16/2021123518746Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type