Elevator apt, fireproof with stores
The 111 Willoughby Street Leasehold Condominium
109 WILLOUGHBY STREET · BIN 3427523
💬 Discuss this project
2023Year Built
40Stories
D6Building Class
C6-4.5Zoning
194,451 sfGross Floor Area
0Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: ROMAN CATHOLIC CHURCH OF ST. BONIFACE · 7,604 sf lot · 25.57 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
111 WILLOUGHBY DEVELOPER1208/28/2026
SKYLINE SCAFFOLDING GROUP306/28/2026
ROMAN CATHOLIC CHURCH OF ST. BONIFACE103/22/2026
ZDG1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEPTUNE MECHANICAL INCFire Protection706/28/2026
ZDG, LLCGeneral Contractor606/28/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor306/28/2026
NEPTUNE MECHANICAL INCPlumbing306/28/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor206/28/2026
NEPTUNE MECHANICAL INCGeneral Contractor106/28/2026
GOOD-WILL MECHANICAL CORP.General Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352108/17/2026
SPECIAL TESTING & CONSULT16881507/24/2025
G. BLINN CONSULTING, LLC2894403/18/2025
GEORGE J. XERAKIAS, PE1658112/09/2024
LOMBARDO PROF ENGINEERING8566205/28/2024
VALJATO ENGINEERING PC2486107/24/2023
DESIMONE CONSULTING ENGIN5942112/04/2020
Building Lifecycle
All (250)Filed (52)Permit Issued (50)Signed Off (26)Violation (44)Inspection (16)Objection (32)Special Inspection (30)
08/17/2026
Filed — Alteration
Installation of AHU units as per plans. No change in use egress or occupancy under our application.
B01440579-I1
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/10/2026
Special inspection requirement — Shutoff dampers
08/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
08/10/2026
Special inspection requirement — Electrical motors and elevators
08/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/10/2026
Special inspection requirement — Metering
08/10/2026
Special inspection requirement — Maintenance information
08/04/2026
Signed off — Alteration
Installation of a sprinkler/ standpipe system as per plans filed herewith. Filed in connection with NB# 321592200.
B00368471-I1
08/04/2026
Special inspection requirement — Mechanical Systems
08/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/04/2026
Special inspection requirement — Final
07/08/2026
Signed off — Alteration
B00368463-I1
07/07/2026
Signed off — Alteration
Installation of plumbing fixtures as per plans filed herewith. Filed in conjunction with NB# 321592200
B00368453-I1
12/02/2025
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01094300-I1
12/02/2025
Signed off — Alteration
TEMPORARY SUSPENDED SCAFFOLD SYSTEM DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00994078-I1
12/02/2025
Signed off — Alteration
Installation of boilers as per plans.
B00461232-I1
12/02/2025
Signed off — Alteration
Installation of HVAC system as per plans filed herewith. Filed in conjunction with NB# 321592200.
B00368446-I1
11/11/2025
Signed off — Alteration
B01022619-I1
11/10/2025
Permit issued — Suspended Scaffold
B01022619-I1-SC
11/07/2025
Signed off — Alteration
B01128392-I1
10/20/2025
Signed off — Alteration
B01174005-I1
10/20/2025
Signed off — Alteration
B00368478-I1
10/20/2025
Signed off — Alteration
Installation of a Cogen System as per plans filed herewith. Filed in conjunction with DOB# 321592200.
B00483878-I1
10/20/2025
Signed off — Alteration
B00368432-I1
10/02/2025
Signed off — Alteration
B01084330-I1
09/09/2025
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
09/09/2025
Special inspection requirement — Standpipe Systems
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2025
Objection resolved — Addressed
08/14/2025
Objection raised — Other
07/24/2025
Filed — Alteration
Installation of a sprinkler/ standpipe system as per plans filed herewith. Filed in connection with NB# 321592200.
B00368471-P5
07/17/2025
Special inspection requirement — Standpipe Systems
SEBASTIAN SETTEDUCATE JR., P.E
07/17/2025
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
05/20/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/14/2025
Signed off — Alteration
Installation of a temporary chain link fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00853475-I1
05/09/2025
Permit issued — General Construction
B01174005-I1-GC
05/08/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00853461-I1
05/08/2025
Signed off — Alteration
Installation of a temporary roof protection as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00913605-I1
04/30/2025
Signed off — Alteration
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 6548# & CAR # 2 SHALL BE 6880# CAPACITY DURING NEW BUILDING CONST FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APPL SEP.
B00795818-I1
04/28/2025
Permit issued — Construction Fence
B00853475-I1-FN
04/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2025
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
04/07/2025
Filed — Alteration
B01174005-I1
03/18/2025
Filed — Alteration
TEMPORARY SUSPENDED SCAFFOLD SYSTEM DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00994078-P4
03/12/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/10/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/10/2025
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
03/10/2025
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
03/04/2025
Filed — Alteration
Installation of a Cogen System as per plans filed herewith. Filed in conjunction with DOB# 321592200.
B00483878-P2
03/04/2025
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
03/04/2025
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
03/03/2025
Violation issued (ECB, closed)
Unknown
03/03/2025
Violation issued (ECB, closed)
Construction
02/27/2025
Signed off — Alteration
B00642874-I1
02/25/2025
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
02/25/2025
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
02/25/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
SEBASTIAN SETTEDUCATE JR., P.E
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
Latest 60 of 250 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offPIONEER WINDOW MFG CORP11/10/2025
DOB NOWGeneral ConstructionSigned-offZDG, LLC05/09/2025
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP04/28/2025
DOB NOWSuspended ScaffoldSigned-offPIONEER WINDOW MFG CORP01/22/2025
DOB NOWStandpipeSigned-offNEPTUNE MECHANICAL INC12/26/2024
DOB NOWSuspended ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC12/02/2024
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC09/30/2024
DOB NOWSprinklersSigned-offNEPTUNE MECHANICAL INC09/30/2024
DOB NOWSprinklersSigned-offNEPTUNE MECHANICAL INC09/30/2024
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC08/12/2024
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S07/25/2024
DOB NOWSuspended ScaffoldPermit IssuedELM SUSPENSION SYSTEMS07/08/2024
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/10/2024
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP05/02/2024
DOB NOWGeneral ConstructionSigned-offZDG, LLC04/15/2024
DOB NOWSuspended ScaffoldSigned-offPIONEER WINDOW MFG CORP03/28/2024
DOB NOWMechanical SystemsSigned-offNEPTUNE MECHANICAL INC03/26/2024
DOB NOWMechanical SystemsSigned-offNEPTUNE MECHANICAL INC02/01/2024
DOB NOWSuspended ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC01/23/2024
DOB NOWGeneral ConstructionSigned-offZDG, LLC12/29/2023
DOB NOWStandpipeSigned-offNEPTUNE MECHANICAL INC12/26/2023
DOB NOWConstruction FenceSigned-offPRECISE CONSTRUCTION CONR12/14/2023
DOB NOWStructuralSigned-offZDG, LLC11/16/2023
DOB NOWProtection and Mechanical MethodsSigned-offZDG, LLC10/11/2023
DOB NOWProtection and Mechanical MethodsSigned-offZDG, LLC09/12/2023
DOB NOWMechanical SystemsSigned-offNEPTUNE MECHANICAL INC08/31/2023
DOB NOWStandpipeSigned-offNEPTUNE MECHANICAL INC08/17/2023
DOB NOWMechanical SystemsSigned-offNEPTUNE MECHANICAL INC08/16/2023
DOB NOWSprinklersSigned-offNEPTUNE MECHANICAL INC08/16/2023
DOB NOWBoiler EquipmentSigned-offNEPTUNE MECHANICAL INC08/16/2023
DOB NOWGeneral ConstructionSigned-offZDG, LLC08/16/2023
DOB NOWGeneral ConstructionSigned-offZDG, LLC08/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offZDG, LLC08/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP08/07/2023
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL07/19/2023
DOB NOWGeneral ConstructionSigned-offZDG, LLC07/13/2023
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC06/29/2023
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP06/19/2023
+ 18 more permits on file
1 project · most recent 08/17/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026——Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Daikin BSF6Q54TVJ 18 tons ×1
Heat / Cool
Daikin FXMQ24TBVJU 742 CFM · Vrf Indoor ×14
FXSQ12TBVJU 335 CFM · Vrf Indoor ×13
FXMQ36TBVJU 1,130 CFM · Vrf Indoor ×3
FXMQ18TBVJU 636 CFM · Vrf Indoor ×2
FXMQ48MFVJU 635 CFM · Vrf Indoor ×1
Neptronic DF CI00H 635 CFM · Ductwork ×6
— FXSQ12TBVJU 335 CFM ×1
Ventilation
Daikin BSF6Q54TVJ 18 BTU ×4
FXMQ48MFVJU 635 CFM · Vrf Indoor ×3
FXMQ36MFVJU 635 CFM · Vrf Indoor ×2
1 project · most recent 07/24/2025
FiledStatusContractorScope
07/24/2025Signed-offNEPTUNE MECHANICAL INC3,514 heads, 20 outlets
1 project · most recent 01/30/2025
Gas
FiledStatusContractorScope
01/30/2025——Gas
6 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedA & M ELEC'L SERVICE INC.General Wiring
01/30/2026CompleteJAM ELECTRICAL CORP—
09/26/2023Permit IssuedA & M ELEC'L SERVICE INC.General Wiring
03/31/2023CompleteTOP SHELF ELECTRIC CORP—
11/15/2022CompleteA & M ELEC'L SERVICE INC.General Wiring
12/06/2021CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 08/17/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/17/2026——Tenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
05/20/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/22/2025Pass-Final SP - More than 10 Requested FloorsPassView ↗
03/12/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/10/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/22/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/18/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
10/12/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/29/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/27/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
08/10/2026Fire-Resistant Penetrations and Joints—special
08/10/2026Energy Code Compliance Inspections—progress
08/10/2026Shutoff dampers—energy_progress
08/10/2026HVAC-R and service water heating system controls—energy_progress
08/10/2026HVAC-R and service water piping design and insulation—energy_progress
08/10/2026HVAC-R and service water heating equipment—energy_progress
08/10/2026Electrical motors and elevators—energy_progress
08/10/2026Metering—energy_progress
08/10/2026Maintenance information—energy_progress
08/04/2026Final—progress
08/04/2026Tenant Protection Plan Compliance—special
08/04/2026Mechanical Systems—special
09/09/2025Standpipe SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
09/09/2025Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
07/17/2025Standpipe SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
07/17/2025Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
03/10/2025Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
03/10/2025FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
03/04/2025FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
03/04/2025Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
02/25/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
02/25/2025High-Pressure Fuel-Gas Piping (Welding)SEBASTIAN SETTEDUCATE JR., P.Especial
02/25/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/25/2025Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/25/2025HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
Latest 25 of 88.
▾Documents — 172 on file (BIS + DOB NOW)
▸Plans & Drawings56
▸DOB NOWPlans/Sketch34
09/01/2026B00483878-P2Request digital key ↗
09/01/2026B00483878-I1Request digital key ↗
09/01/2026B00483878-P1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Standpipe6
09/02/2026B00368478-I1Request digital key ↗
08/23/2026B00368471-I1Request digital key ↗
08/23/2026B00368471-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/23/2026B00368471-P3Request digital key ↗
08/23/2026B00368471-P2Request digital key ↗
08/23/2026B00368471-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/01/2026B00461232-I1Request digital key ↗
08/15/2026B00461232-P2Request digital key ↗
08/15/2026B00461232-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00368463-I1Request digital key ↗
08/23/2026B00368453-I1Request digital key ↗
08/23/2026B00368453-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00368446-P1Request digital key ↗
09/02/2026B00368446-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00368432-I1Request digital key ↗
▸Seals & Professional Certifications83
▸DOB NOWDPL-1: Design Professional Seal & Signature51
09/01/2026B00461232-P1Open ↗
09/01/2026B00461232-P2Open ↗
09/01/2026B00461232-P3Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026B00368471-P2Open ↗
09/01/2026B01054259-I1Open ↗
08/29/2026B00368471-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/29/2026B00368453-P2Open ↗
08/27/2026B00483878-I1Open ↗
08/27/2026B00461232-P3Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/23/2026B00368453-I1Open ↗
08/13/2026B00461232-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00368446-I1Open ↗
08/13/2026B00461232-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWConcrete Testing Exception Report1
08/13/2026B00368432-I1Open ↗
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter24
09/01/2026B00461232-I1Open ↗
09/01/2026B00461232-P2Open ↗
09/01/2026B00461232-P3Open ↗
Showing 3 of 24 on file for this type
▸Other Documents4
▸DOB NOWCalculations2
08/13/2026B01128392-I1Open ↗
08/13/2026B01054259-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B01128392-I1Open ↗
08/13/2026B01054259-I1Open ↗