← Back
Elevator cooperative
Phoenix
160 EAST 65 STREET · BIN 1042369
💬 Discuss this project
1968Year Built
31Stories
D4Building Class
C1-9Zoning
246,320 sfGross Floor Area
184Units
LL97 CoveredRent Stabilized11 Open Violations 10 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: PHOENIX OWNERS CORP · 20,083 sf lot · 12.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 20 docs
Bulkhead3p · 1 filing · 2 docs
Floor 27Under Construction2p · 1 filing · 3 docs
Floor 26Under Construction19p · 1 filing · 15 docs
Floor 25Under Construction5p · 1 filing · 18 docs
Floor 241p · 1 filing · 6 docs
Floor 231p · 1 filing · 7 docs
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14Under Construction4p · 1 filing · 9 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 31p · 1 filing · 7 docs
Floor 2Under Construction1 filing · 5 docs
Floor 12p · 1 filing · 15 docs
Cellar6p · 3 filings · 20 docs
Sub-Cellar4p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORSID REALTY408/29/2026
ORSID NEW YORK607/08/2026
PHOENIX OWNERS11903/22/2026
CONTRACTING CORP TWO-TONE203/22/2026
160 PARKING CORP403/22/2026
-TONE CONTRACTING CORP TW203/22/2026
PHONEIX OWNERS CORP403/22/2026
DEHARI SERVICES INC.103/22/2026
PHOENIX OWNERS GROUP103/22/2026
THE BANK OF NEW YORK303/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIERARCH-E203/21/2026
DOMANI CONSULTING403/21/2026
CODE403/21/2026
JM ZONING, LLC.203/21/2026
OUTSOURCE CONSULTANTS, INC.1603/21/2026
LMS-ACE SERVICES203/21/2026
D D EXPEDITORS403/21/2026
BAC Developers Group503/21/2026
A K EXPEDITING603/21/2026
BUILDING BROTHERS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE NY INSTALLATIONS INCGeneral Contractor3007/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor1607/08/2026
TOP DOG PLBG & HTG CORPPlumbing507/08/2026
ALPHACRAFT CONSTRUCTION*General Contractor407/08/2026
VELOCITY PLUMBING & HEATPlumbing407/08/2026
HI-TECH PLUMBING & HEATINGPlumbing407/08/2026
NEIL CABERAElectrical403/21/2026
TWO-TONE CONTRACTING CORP.General Contractor407/08/2026
SIGNSTAR NYCScaffold307/08/2026
JSD CONSTRUCTION GROUP INGeneral Contractor303/21/2026
METHOD GENERAL CONTRACTORGeneral Contractor303/21/2026
AFFECT BUILD LLCGeneral Contractor303/21/2026
LAKE CONTRACTING LLCGeneral Contractor207/08/2026
CBB PLUMBING CORPPlumbing207/08/2026
TWINTECH ELECTRIC INCElectrical103/22/2026
S & J INDUSTRIAL CORPFire Protection107/08/2026
BELFOR LONG ISLAND LLCGeneral Contractor104/09/2026
JP ROCHE INCGeneral Contractor104/09/2026
NOVA INTERIOR RENOVATIONSGeneral Contractor109/24/2026
PERFORMANCE MECHANCIALGeneral Contractor107/08/2026
ROMEL CONSTRUCTION CORPGeneral Contractor106/28/2026
ROSS & ASSOCIATES LLCGeneral Contractor104/09/2026
STONE & OAK INTERIORS INCGeneral Contractor104/09/2026
THE RENOVATED HOME 1 LTDGeneral Contractor107/08/2026
UNITED ELITE GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A2 ARCHITECT, PC2504405/18/2026
MILROSE CONSULTANTS LLC2003203/24/2026
AK ENGINEERING PC678103/12/2026
MILLWARD ARCHITECTURE DES9680103/02/2026
EDG2578209/30/2024
AG ENGINEERING PLLC8899107/09/2024
ATLANTIC ENGINEERINGLABOR1381212/06/2023
ACCARDO ENGINEERING, PLLC1247212/06/2023
MARCO GIARDINA ARCHITECTU7882102/23/2023
TSF ENGINEERING, PC1274512/07/2022
Building Lifecycle
All (300)Filed (60)Permit Issued (70)Signed Off (25)Facade (FISP) (17)Violation (44)Inspection (26)Objection (28)Special Inspection (30)
09/23/2026
Permit issued — General Construction
M01453485-I1-GC
08/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
06/02/2026
Permit issued — Plumbing
M01363684-S1-PL
05/29/2026
Permit issued — General Construction
M01363684-I1-GC
05/26/2026
Special inspection requirement — Lighting in dwelling units
Ann Macklin
05/26/2026
Special inspection requirement — Final
Ann Macklin
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
05/18/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 25E ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366651-P1
05/18/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 25E ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366651-P2
05/07/2026
Permit issued — Plumbing
M01366651-S1-PL
05/06/2026
Filed — Alteration
M01363684-S1
05/01/2026
Special inspection requirement — Final
Ann Macklin
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
05/01/2026
Special inspection requirement — Lighting in dwelling units
Ann Macklin
04/30/2026
Permit issued — General Construction
M01366651-I1-GC
04/13/2026
Violation issued (ECB, open)
Construction
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
04/09/2026
Special inspection requirement — Final
Christopher Drutjons
04/09/2026
Special inspection requirement — Lighting in dwelling units
Christopher Drutjons
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
04/03/2026
Permit issued — General Construction
M01368085-I1-GC
03/30/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 25E ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366651-S1
03/30/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 25E ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366651-I1
03/27/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK MILLWARD
03/25/2026
Objection raised — Admin
03/25/2026
Objection raised — Inspections
03/25/2026
Objection raised — Admin
03/25/2026
Objection raised — Scope
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/24/2026
Filed — Alteration
INTERIOR RENOVATION TO APARTMENT UNIT #26DE- MINOR INTERIOR PARTITION AND PLUMBING WORK- NO CHANGE IN MEANS OF EGRESS, USE OR OCCUPANCY
M01287916-P2
03/24/2026
Filed — Alteration
INTERIOR RENOVATION TO APARTMENT UNIT #26DE- MINOR INTERIOR PARTITION AND PLUMBING WORK- NO CHANGE IN MEANS OF EGRESS, USE OR OCCUPANCY
M01287916-P1
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/13/2026
Objection raised — Admin
03/13/2026
Objection raised — Fire_Protection
03/13/2026
Objection raised — Mechanical
03/13/2026
Objection raised — Structural
03/12/2026
Filed — Alteration
INTERIOR RENOVATION AS SHOWN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NO ALTERATIONS OF STRUCTURAL SYSTEM OR EXTERIOR OF THE BUILDING
M01368085-I1
03/02/2026
Filed — Alteration
M01363684-I1
02/24/2026
Special inspection requirement — Final
ERIK MILLWARD
01/12/2026
Signed off — Alteration
M01253483-I1
11/13/2025
Permit issued — Plumbing
M01287916-S1-PL
10/28/2025
Signed off — Alteration
RENOVATION OF EXISTING BATHROOM AND MINOR CARPENTRY AND CABINETRYWORK IN APARTMENT #21C ON THE 21ST FLOOR. NO CHANGE OF USE, OCCUPANCY, OR EGRESS. NO RISERS SHALL BE RELOCATED OR REPLACED.FOOTPRINTS OF ALL ROOMS SHALL REMAIN AS IS.
M01250658-I1
10/24/2025
Permit issued — General Construction
M01287916-I1-GC
10/08/2025
Filed — Alteration
INTERIOR RENOVATION TO APARTMENT UNIT #26DE- MINOR INTERIOR PARTITION AND PLUMBING WORK- NO CHANGE IN MEANS OF EGRESS, USE OR OCCUPANCY
M01287916-S1
10/01/2025
Filed — Alteration
INTERIOR RENOVATION TO APARTMENT UNIT #26DE- MINOR INTERIOR PARTITION AND PLUMBING WORK- NO CHANGE IN MEANS OF EGRESS, USE OR OCCUPANCY
M01287916-I1
09/04/2025
Permit issued — General Construction
M01250658-I1-GC
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNOVA INTERIOR RENOVATIONS09/23/2026
DOB NOWPlumbingPermit IssuedPIPEWORKS NYC INC06/02/2026
DOB NOWGeneral ConstructionPermit IssuedUNITED ELITE GROUP INC05/29/2026
DOB NOWPlumbingPermit IssuedXPRESS PLBG AND HTG LLC05/07/2026
DOB NOWGeneral ConstructionPermit IssuedROMEL CONSTRUCTION CORP04/30/2026
DOB NOWGeneral ConstructionPermit IssuedBELFOR LONG ISLAND LLC04/03/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.11/13/2025
DOB NOWGeneral ConstructionPermit IssuedROSS & ASSOCIATES LLC10/24/2025
DOB NOWGeneral ConstructionSigned-offSTONE & OAK INTERIORS INC09/04/2025
DOB NOWGeneral ConstructionSigned-offJP ROCHE INC09/02/2025
DOB NOWStructuralPermit IssuedLAKE CONTRACTING LLC08/27/2025
DOB NOWStructuralPermit IssuedLAKE CONTRACTING LLC08/14/2024
DOB NOWPlumbingSigned-offCBB PLUMBING CORP08/06/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC07/29/2024
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I05/24/2024
DOB NOWGeneral ConstructionSigned-offTWO-TONE CONTRACTING CORP04/05/2024
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP12/07/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/11/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC08/01/2023
DOB NOWGeneral ConstructionSigned-offTHE RENOVATED HOME 1 LTD07/31/2023
DOB NOWPlumbingSigned-offCBB PLUMBING CORP07/22/2023
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I06/15/2023
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT05/18/2023
DOB NOWGeneral ConstructionSigned-offTWO-TONE CONTRACTING CORP03/24/2023
DOB NOWGeneral ConstructionSigned-offTWO-TONE CONTRACTING CORP03/16/2023
DOB NOWGeneral ConstructionSigned-offAFFECT BUILD LLC03/02/2023
DOB NOWSprinklersSigned-offS & J INDUSTRIAL CORP11/16/2022
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/12/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC08/10/2022
DOB NOWGeneral ConstructionSigned-offALPHACRAFT CONSTRUCTION*07/07/2022
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT06/17/2022
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I05/28/2022
DOB NOWSupported ScaffoldPermit IssuedEMPIRE NY INSTALLATIONS I05/23/2022
DOB NOWPlumbingSigned-offVELOCITY PLUMBING & HEAT04/19/2022
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP04/09/2022
DOB NOWGeneral ConstructionSigned-offJSD CONSTRUCTION GROUP IN03/09/2022
DOB NOWSignSigned-offSIGNSTAR NYC03/07/2022
+ 60 more permits on file
4 projects · most recent 05/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/18/2026Permit IssuedXPRESS PLBG AND HTG LLCGas, Water/Sanitary
03/24/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
06/16/2021Permit IssuedTOP DOG PLBG & HTG CORPGas, Water/Sanitary
10/22/2019Signed-offADRIATIC PLBG & HTG CORPWater/Sanitary
25 projects · most recent 07/29/2026
General Wiring
FiledStatusContractorScope
07/29/2026Permit IssuedIP2 ELECTRIC LLCGeneral Wiring
06/03/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
05/11/2026Permit IssuedBRONXDALE ELECTRIC INCGeneral Wiring
04/24/2026CompleteCOBRA ELECTRICAL NYC LLC—
12/15/2025CompleteV.R. ELECTRICAL CORPGeneral Wiring
11/24/2025Permit IssuedCITYONE ELECTRICAL CORPGeneral Wiring
10/20/2025Permit IssuedTEMPEST ELEC'L CONTRG, INGeneral Wiring
09/03/2025CompleteAPPROVED ELECTRIC CORP.General Wiring
06/27/2025CompleteP & Z ELECTRIC CORP—
04/16/2025CompleteUNITY ELECTRIC CO. INC—
08/22/2024Permit IssuedR.A. PHILLIPS ELEC'L CONTGeneral Wiring
04/25/2024CompleteGRX EURO ELECTRIC CORPGeneral Wiring
11/13/2023CompleteACCURATE ELEC'L CORP.General Wiring
07/25/2023CompleteGRX EURO ELECTRIC CORPGeneral Wiring
03/20/2023Permit IssuedRE-CON ELECTRIC INCGeneral Wiring
1 project · most recent 08/08/2018
Scaffold
FiledStatusContractorScope
08/08/2018Permit IssuedEMPIRE NY INSTALLATIONS IScaffold
1 project · most recent 04/14/2025
FiledStatusContractorScope
04/14/2025———
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
08/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/29/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
06/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
06/08/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/26/2026Lighting in dwelling unitsAnn Macklinenergy_progress
05/26/2026FinalAnn Macklinprogress
05/26/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/26/2026Energy Code Compliance InspectionsAnn Macklinprogress
05/01/2026Lighting in dwelling unitsAnn Macklinenergy_progress
05/01/2026Energy Code Compliance InspectionsAnn Macklinprogress
05/01/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/01/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/01/2026FinalAnn Macklinprogress
04/09/2026FinalChristopher Drutjonsprogress
04/09/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
04/09/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
04/09/2026Lighting in dwelling unitsChristopher Drutjonsenergy_progress
03/26/2026Fire-Resistant Penetrations and JointsERIK MILLWARDspecial
02/24/2026FinalERIK MILLWARDprogress
07/16/2025Lighting controlsDAVID HOFMANNenergy_progress
07/16/2025Lighting in dwelling unitsDAVID HOFMANNenergy_progress
07/09/2025FinalDAVID HOFMANNprogress
07/02/2025FinalJill Diamantprogress
10/02/2024Concrete - Cast-In-PlaceAnthony Stasiospecial
10/02/2024Tenant Protection Plan ComplianceARIEL GOLSHANspecial
10/02/2024FinalAnthony Stasioprogress
10/02/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
09/27/2024Concrete - Cast-In-Place—special
Latest 25 of 81.
▾Documents — 1,358 on file (BIS + DOB NOW)
▸Plans & Drawings61
▸DOB NOWPlans/Sketch54
09/06/2026M00062009-I1Request digital key ↗
09/06/2026M00062351-I1Request digital key ↗
09/03/2026M00483950-I1Request digital key ↗
Showing 3 of 54 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00230436-I1Request digital key ↗
09/05/2026M00205020-I1Request digital key ↗
09/03/2026M00269410-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00374449-I1Request digital key ↗
▸Applications & Permits251
▸BISWORK PERMIT APPLICATION124
07/22/2025123409935Open ↗
02/12/2025101819052Open ↗
01/15/2025101819052Open ↗
Showing 3 of 124 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION123
07/08/2025123409935Open ↗
06/23/2025123409935Open ↗
06/17/2025123409935Open ↗
Showing 3 of 123 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWState DEC Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications320
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION138
04/10/2020123691497Open ↗
04/10/2020123691497Open ↗
03/02/2020123769635Open ↗
Showing 3 of 138 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature61
09/06/2026M00062009-I1Open ↗
09/05/2026M00187772-I1Open ↗
09/05/2026M00230436-I1Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWProgress Inspector Seal & Signature50
09/19/2026M00661850-I1Open ↗
09/19/2026M00661850-I1Open ↗
09/01/2026M01366651-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/01/2026M01366651-I1Open ↗
09/01/2026M00809061-I1Open ↗
09/01/2026M00809061-I1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
06/08/2020140906250Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment77
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection29
▸BISTenant Protection Plan and Notes22
10/30/2019123697712Open ↗
10/17/2019123786386Open ↗
08/02/2019123769635Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWTenant Protection Plan7
09/05/2026M00230436-I1Open ↗
09/04/2026M00374449-I1Open ↗
Showing 2 of 7 on file for this type
▸Environmental & Asbestos101
▸DOB NOWDEP ACP-5: Asbestos Assessment Report33
09/05/2026M00230436-I1Open ↗
09/05/2026M00205020-I1Open ↗
09/05/2026M00205020-P1Open ↗
Showing 3 of 33 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)24
10/17/2019123786386Open ↗
08/02/2019123769635Open ↗
07/10/2019123691497Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)9
09/15/2020140906250Open ↗
10/30/2019123697712Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
09/03/2026M00269410-I1Open ↗
09/03/2026M00661850-I1Open ↗
09/02/2026M00583400-I1Open ↗
Showing 3 of 9 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
06/14/2019123768538Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance104
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS54
04/10/2020123691497Open ↗
04/10/2020123691497Open ↗
02/14/2020123769635Open ↗
Showing 3 of 54 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS28
10/15/2021140906250Open ↗
11/09/2020123697712Open ↗
09/16/2020123786386Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
07/21/2025123409935Open ↗
10/15/2021140906250Open ↗
10/15/2021140906250Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00552545-I1Open ↗
Showing 1 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/21/2025123409935Open ↗
09/21/2020140906250Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
07/21/2025123409935Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/21/2025123409935Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY18
07/21/2025123409935Open ↗
03/19/2025101819052Open ↗
01/09/2025101819052Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
03/31/2025102957034Open ↗
03/19/2025101819052Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/21/2025123409935Open ↗
09/15/2020140906250Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/15/2020140906250Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs100
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST52
07/29/2025123409935Open ↗
07/09/2025102957034Open ↗
04/30/2025102957034Open ↗
Showing 3 of 52 on file for this type
▸BISADMINISTRATIVE OBJECTIONS22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
06/24/2019123599668Open ↗
Showing 1 of 15 on file for this type
▸BISSUPERSEDING LETTER7
07/22/2025123409935Open ↗
02/12/2025101819052Open ↗
Showing 2 of 7 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
10/03/2023121857446Open ↗
09/15/2020140906250Open ↗
▸Cost, Insurance & Ownership107
▸BISCOST AFFIDAVIT105
10/03/2023121857446Open ↗
10/15/2021140906250Open ↗
11/09/2020123697712Open ↗
Showing 3 of 105 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/24/2025123409935Open ↗
10/03/2023121857446Open ↗
▸Filing & Intake Forms145
▸BISEFILING COVER SHEET54
10/30/2019123697712Open ↗
10/17/2019123786386Open ↗
08/02/2019123769635Open ↗
Showing 3 of 54 on file for this type
▸BISADDITIONAL INFORMATION45
07/08/2025123409935Open ↗
02/11/2025101819052Open ↗
09/14/2020123697712Open ↗
Showing 3 of 45 on file for this type
▸BISBOROUGH INTAKE FORM39
07/22/2025123409935Open ↗
11/03/2021123499348Open ↗
04/10/2020123691497Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
06/08/2020140906250Open ↗
Showing 1 of 7 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
08/14/2020140906250Open ↗
Showing 1 of 9 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDHCR DOCUMENT2
07/09/2025102957034Open ↗
02/11/2025101819052Open ↗
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDHCR Document2
09/03/2026M00661850-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type