← Back
BuildNYC
Three families
1090 WOODYCREST AVENUE
BRONX · BIN 2099367
💬 Discuss this project
1995Year Built
3Stories
C0Building Class
R7-1Zoning
3,188 sfGross Floor Area
3Units
Rent Stabilized2 Active Violations ▸
Three families · 2,100 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Boiler replacement and installation20p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Housing Deve Fund203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jose A. Santos P.E.P.C310/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Alea NYC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Doval Plumbing & HeatingPlumbing106/28/2026
Premier Pipe SolutionsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jose A Santos PE3292310/17/2025
Building Lifecycle
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
10/17/2025
Filed — Alteration
PROPOSE TO REMOVE AN EXISITNG HOT WATER HEATER AND BOILER, & INSTALL 3 WALL MOUNTED COMBI BOILERS, AS PER PLANS SUBMITTED HERWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLIACTION.
X00206250-P2
10/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2025
Special inspection requirement — HVAC and service water heating equipment
Jose Santos
10/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
27 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDoval Plumbing & Heating05/29/2025
DOB NOWPlumbingPermit IssuedTomkat Plumbing & Heating11/29/2019
BIS—ISSUEDCasbro Construction02/08/1994
BISPLISSUEDDuo Plumbing & Heating01/24/1994
1 project · most recent 10/17/2025
Gas
FiledStatusContractorScope
10/17/2025Permit IssuedPremier Pipe SolutionsGas
1 project · most recent 07/06/2018
FiledStatusContractorScope
07/06/2018Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/17/2025HVAC and service water heating equipment Jose Santosenergy_progress
10/17/2025Fire-Resistant Penetrations and JointsJose Santosspecial
10/17/2025Energy Code Compliance InspectionsJose Santosprogress
10/17/2025Fire-Resistance Rated ConstructionJose Santosprogress
10/17/2025HVAC insulation and sealing Jose Santosenergy_progress
10/17/2025HVAC and service water heating system controls Jose Santosenergy_progress
05/07/2025Fire-Resistant Penetrations and JointsJose Santosspecial
05/07/2025Energy Code Compliance InspectionsFRANCISCO PEREZprogress
05/07/2025Fire-Resistance Rated ConstructionFRANCISCO PEREZprogress
05/07/2025HVAC and service water heating system controls FRANCISCO PEREZenergy_progress
05/07/2025HVAC and service water heating equipment FRANCISCO PEREZenergy_progress
05/07/2025HVAC insulation and sealing FRANCISCO PEREZenergy_progress
18 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account