Hospital, sanitarium, mental institution
St. Luke's Hospital
1091 AMSTERDAM AVENUE · Morningside Heights · BIN 1090071
💬 Discuss this project
1954Year Built
13Stories
I1Building Class
R8Zoning
511,567 sfGross Floor Area
1Units
LL97 Covered33 Open Violations 29 unresolved · 4 paperwork only ▸FISP: UNSAFE
Hospital, sanitarium, mental institution · Owner of record: ST LUKE'S/ROOSEVELT HOSPITAL · 64,954 sf lot · 7.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction73p · 8 filings · 20 docs
Bulkhead1p · 1 filing · 8 docs
Floor 15Under Construction12p · 1 filing · 12 docs
Floor 14Under Construction14p · 2 filings · 18 docs
Floor 13Under Construction38p · 2 filings · 20 docs
Floor 12Under Construction48p · 3 filings · 20 docs
Floor 11Under Construction46p · 2 filings · 20 docs
Floor 10Under Construction46p · 2 filings · 20 docs
Floor 9Under Construction39p · 2 filings · 20 docs
Floor 8Under Construction54p · 3 filings · 20 docs
Floor 7Under Construction40p · 3 filings · 20 docs
Floor 6Under Construction55p · 6 filings · 20 docs
Floor 5Under Construction67p · 5 filings · 20 docs
Floor 4Under Construction74p · 7 filings · 20 docs
Floor 377p · 11 filings · 20 docs
Floor 2Under Construction60p · 4 filings · 20 docs
Floor 1102p · 13 filings · 20 docs
CellarUnder Construction97p · 7 filings · 20 docs
Basement1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MOUNT SINAI HEALTH SYSTEMS10509/16/2026
MOUNT SINAI QUEENS307/08/2026
LEMX CORP503/22/2026
ST LUKES ROOSEVELT HOSPITAL5803/22/2026
ST LUKES HOSPITAL4903/21/2026
MT. SINAI ST. LUKE HOSPITAL20803/21/2026
MOUNT SINAI ST LUKES HOSPITAL803/21/2026
VEZANDIO CONTRACTING303/21/2026
PHOENIX1103/21/2026
CONTINUUM HEALTH PARTNERS2703/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.8703/21/2026
Rigid Structural Design, LLC1603/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
AE DESIGN SOLUTION603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITY CONSTR. SVCS INCGeneral Contractor2707/08/2026
PHOENIX SUTTON STR INCGeneral Contractor1709/23/2026
TURNER CONSTRUCTION COMPANYGeneral Contractor1607/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor1509/30/2026
L.F. DRISCOLL COMPANY LLCGeneral Contractor807/08/2026
ALLIANCE PLUMBING CORPPlumbing807/08/2026
J T & T AIR CONDITIONINGGeneral Contractor708/30/2026
CAULDWELL WINGATE CO LLCGeneral Contractor607/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection607/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor607/08/2026
PAR PLUMBING CO., INCPlumbing507/08/2026
PAUL M MAINTENANCE INCGeneral Contractor507/08/2026
NELSON AIR DEVICE CORPGeneral Contractor404/09/2026
PACE PLUMBING CORPFire Protection407/08/2026
STANDARD WATERPROOFING CGeneral Contractor403/21/2026
B & A RESTORATION CONTRAGeneral Contractor308/30/2026
TRISTATE PLBG SVCS CORPPlumbing307/08/2026
STARR INDUSTRIES LLCGeneral Contractor303/21/2026
EMPIRE GENERAL CONTRACTINGeneral Contractor304/09/2026
CARDOZA PLUMBING CORPPlumbing307/08/2026
LEMX CORPGeneral Contractor303/21/2026
PAR FIRE PROTECTION LLCFire Protection307/08/2026
NYC FIRE SPRINKLER CORPFire Protection307/08/2026
M & J MECHANICAL CORPGeneral Contractor203/21/2026
E-J ELEC. INSTALLATION COElectrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT28272906/30/2026
ALAN MARGOLIN & ASSOC4234101/14/2026
MOHAMMAD AHEAD - PROFESSI9286109/19/2025
VINCENT J. LIOTTA P. E.1974105/17/2023
Building Lifecycle
All (300)Filed (58)Permit Issued (80)Signed Off (32)Facade (FISP) (9)Violation (5)Inspection (60)Objection (26)Special Inspection (30)
09/29/2026
Permit issued — Sidewalk Shed
M01291189-I1-SH
09/22/2026
Permit issued — Supported Scaffold
M01459995-I1-SF
09/17/2026
Permit issued — Standpipe
M01268265-S3-EW-SD
09/15/2026
Permit issued — Suspended Scaffold
M01442333-I1-SC
09/08/2026
Permit issued — Sidewalk Shed
M01270161-I1-SH
08/28/2026
Permit issued — Mechanical Systems
M01184318-I1-MS
08/28/2026
Permit issued — Structural
M01210027-I1-GC-CX
08/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2026
Permit issued — Supported Scaffold
M01270201-I1-SF
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2026
Objection resolved — Resolved
06/30/2026
Filed — Alteration
Facade repairs as per plans filed herewith. No change in use, egress or occupancy.
M01396962-I1
06/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
06/25/2026
Permit issued — Mechanical Systems
M01362218-S1-MS
06/23/2026
Permit issued — Plumbing
M01362218-S2-PL
06/23/2026
Permit issued — General Construction
M01362218-I1-GC
06/16/2026
Cycle 9 facade report submitted
06/16/2026
Cycle 9 facade report signed — UNSAFE
06/12/2026
Permit issued — Mechanical Systems
M01184318-I1-MS
06/12/2026
Cycle 9 facade inspection completed
06/01/2026
Signed off — Alteration
M01279503-I1
05/25/2026
Objection raised — Scope
05/18/2026
Permit issued — Protection and Mechanical Methods
M01215743-I1-PMM
05/15/2026
Permit issued — Mechanical Systems
M01184318-I1-MS
05/07/2026
Filed — Alteration
MSM SP S Block - SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01268265-S3
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
05/06/2026
Special inspection requirement — Post-installed Anchors
Young Suh
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
05/04/2026
Special inspection requirement — Masonry
JONAR MADRIAGA
05/04/2026
Special inspection requirement — Final
JONAR MADRIAGA
05/04/2026
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
04/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/10/2026
Permit issued — Plumbing
M01186338-I1-PL
03/09/2026
Filed — Alteration
Mechanical modifications to include replacement of duct work and associated Air outlet as shown on plans filed herewith. No change in egress, occupancy or use.
M01362218-S2
03/09/2026
Filed — Alteration
Mechanical modifications to include replacement of duct work and associated Air outlet as shown on plans filed herewith. No change in egress, occupancy or use.
M01362218-S1
03/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
03/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
03/02/2026
Filed — Alteration
Mechanical modifications to include replacement of duct work and associated Air outlet as shown on plans filed herewith. No change in egress, occupancy or use.
M01362218-I1
02/24/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
JONAR MADRIAGA
02/24/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
02/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
02/19/2026
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
02/19/2026
Special inspection requirement — Final
JONAR MADRIAGA
02/19/2026
Special inspection requirement — Lighting controls
JONAR MADRIAGA
02/19/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
02/19/2026
Special inspection requirement — Final
JONAR MADRIAGA
02/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/02/2026
Permit issued — General Construction
M01268265-I1-GC
01/28/2026
Permit issued — Sprinklers
M01268265-S2-EW-SP
01/14/2026
Filed — Alteration
MSM SP S Block - SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01268265-S2
01/13/2026
Special inspection requirement — Post-installed Anchors
Young Suh
01/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
01/05/2026
Cycle 10 facade report submitted
01/05/2026
Cycle 10 facade report signed — SWARMP
12/29/2025
Permit issued — Mechanical Systems
M01022106-S1-MS
12/29/2025
Permit issued — General Construction
M01022106-I1-GC
12/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCEPRINE CONSTRUCTION INC09/29/2026
DOB NOWSupported ScaffoldPermit IssuedPHOENIX SUTTON STR INC09/22/2026
DOB NOWStandpipePermit IssuedSIRINA FIRE PROT CORP09/17/2026
DOB NOWSuspended ScaffoldPermit IssuedPHOENIX SUTTON STR, INC09/15/2026
DOB NOWSidewalk ShedPermit IssuedCEPRINE CONSTRUCTION INC09/08/2026
DOB NOWMechanical SystemsPermit IssuedJ T & T AIR CONDITIONING08/28/2026
DOB NOWStructuralPermit IssuedB & A RESTORATION CONTRA08/28/2026
DOB NOWSupported ScaffoldPermit IssuedCEPRINE CONSTRUCTION INC08/13/2026
DOB NOWMechanical SystemsPermit IssuedUNITY CONSTR. SVCS INC06/25/2026
DOB NOWGeneral ConstructionPermit IssuedUNITY CONSTR. SVCS INC06/23/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC06/23/2026
DOB NOWMechanical SystemsPermit IssuedJ T & T AIR CONDITIONING06/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCEPRINE CONSTRUCTION INC05/18/2026
DOB NOWMechanical SystemsPermit IssuedJ T & T AIR CONDITIONING05/15/2026
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE04/10/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION02/02/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP01/28/2026
DOB NOWMechanical SystemsPermit IssuedNELSON AIR DEVICE CORP12/29/2025
DOB NOWGeneral ConstructionPermit IssuedNELSON AIR DEVICE CORP12/29/2025
DOB NOWPlumbingPermit IssuedCAPITAL CONTR P&H CORP11/18/2025
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE11/18/2025
DOB NOWMechanical SystemsPermit IssuedUNITY CONSTR. SVCS INC11/18/2025
DOB NOWSprinklersPermit IssuedFULL CAPACITY FIRE CORP11/17/2025
DOB NOWGeneral ConstructionPermit IssuedUNITY CONSTR. SVCS INC11/14/2025
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE11/03/2025
DOB NOWSuspended ScaffoldPermit IssuedB&A RESTORATION CONTR.INC10/20/2025
DOB NOWGeneral ConstructionPermit IssuedB & A RESTORATION CONTRA10/15/2025
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE10/09/2025
DOB NOWSuspended ScaffoldPermit IssuedB&A RESTORATION CONTR.INC10/08/2025
DOB NOWSidewalk ShedPermit IssuedCEPRINE CONSTRUCTION INC10/08/2025
DOB NOWSidewalk ShedPermit IssuedCEPRINE CONSTRUCTION INC10/07/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM09/19/2025
DOB NOWSidewalk ShedPermit IssuedCEPRINE CONSTRUCTION INC09/11/2025
DOB NOWMechanical SystemsSigned-offEMPIRE GENERAL CONTRACTIN09/09/2025
DOB NOWGeneral ConstructionSigned-offEMPIRE GENERAL CONTRACTIN09/09/2025
DOB NOWGeneral ConstructionPermit IssuedB & A RESTORATION CONTRA09/04/2025
DOB NOWSupported ScaffoldPermit IssuedCEPRINE CONSTRUCTION INC08/18/2025
DOB NOWMechanical SystemsPermit IssuedJ T T AIR CONDITIONING06/20/2025
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE06/01/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCEPRINE CONSTRUCTION INC05/23/2025
+ 60 more permits on file
5 projects · most recent 05/07/2026
Sprinkler System
FiledStatusContractorScope
05/07/2026Permit IssuedSIRINA FIRE PROT CORPSprinkler System
11/14/2025Permit IssuedFULL CAPACITY FIRE CORP—
04/08/2025Permit IssuedNYC FIRE SPRINKLER CORP18 heads
03/25/2025——Sprinkler System
01/24/2024Permit IssuedNYC FIRE SPRINKLER CORPSprinkler System
6 projects · most recent 03/09/2026
Water/Sanitary
FiledStatusContractorScope
03/09/2026Permit IssuedPAR PLUMBING CO., INCWater/Sanitary
11/14/2025Permit IssuedCAPITAL CONTR P&H CORPWater/Sanitary
03/28/2025Permit IssuedCARDOZA PLUMBING WMBEWater/Sanitary
03/25/2025Permit IssuedCARDOZA PLUMBING CORPWater/Sanitary
01/09/2025Permit IssuedI.M.P. PLBG. & HTG. CORPWater/Sanitary
01/24/2024Permit IssuedALLIANCE PLUMBING CORPWater/Sanitary
25 projects · most recent 09/29/2026
General Wiring Lighting
FiledStatusContractorScope
09/29/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
08/25/2026Permit IssuedNJS ELEC'L SERVICES CORP.General Wiring
08/10/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
09/11/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
01/24/2025CompleteNEAD ELECTRIC INC.General Wiring
11/20/2024CompleteADCO ELEC'L CORPGeneral Wiring
05/21/2024CompleteHUGH O'KANE ELEC. CO. INCGeneral Wiring
03/22/2024CompleteE-J ELEC. INSTALLATION COGeneral Wiring
11/17/2023CompleteRICHARD NEU—
10/18/2023Permit IssuedBOROWIDE ELECT'L CONTR'S—
08/01/2023Permit IssuedADCO ELEC'L CORPGeneral Wiring
04/17/2023CompleteRAIDEN ELECTRIC LLC—
04/12/2022Permit IssuedCOMMERCIAL ELECT CONT INCGeneral Wiring
01/26/2022CompleteE-J ELEC. INSTALLATION COGeneral Wiring
11/22/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
2 projects · most recent 06/30/2026
Steel Masonry
FiledStatusContractorScope
06/30/2026——Steel, Masonry
01/24/2024Signed-offEMPIRE GENERAL CONTRACTIN1 scope_items
3 projects · most recent 10/03/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
10/03/2025Permit IssuedCEPRINE CONSTRUCTION INCScaffold
09/10/2025Permit IssuedCEPRINE CONSTRUCTION INCSidewalk Shed
09/09/2025Permit IssuedCEPRINE CONSTRUCTION INCSidewalk Shed
▾Field Inspections (DOB CAP) — 70
DateTypeResultReport
08/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/03/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/27/2025Fail-Final CND-Occupancy InspectionFailView ↗
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/11/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
02/11/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
02/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
Latest 25 of 70.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/29/2026Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
05/06/2026Post-installed AnchorsYoung Suhspecial
05/06/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
05/05/2026Energy Code Compliance InspectionsJONAR MADRIAGAprogress
05/04/2026MasonryJONAR MADRIAGAspecial
05/04/2026FinalJONAR MADRIAGAprogress
05/04/2026Structural Steel - DetailsJONAR MADRIAGAspecial
03/09/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
03/06/2026Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
02/24/2026Exhaust and Vent Systems in Plenums and DuctsJONAR MADRIAGAspecial
02/24/2026Post-installed AnchorsJONAR MADRIAGAspecial
02/19/2026Mechanical SystemsJONAR MADRIAGAspecial
02/19/2026Lighting controlsJONAR MADRIAGAenergy_progress
02/19/2026Interior lighting powerJONAR MADRIAGAenergy_progress
02/19/2026Energy Code Compliance InspectionsJONAR MADRIAGAprogress
02/19/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
02/19/2026FinalJONAR MADRIAGAprogress
02/19/2026FinalJONAR MADRIAGAprogress
01/13/2026Post-installed AnchorsYoung Suhspecial
01/13/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
11/25/2025Standpipe SystemsYoung Suhspecial
11/25/2025Sprinkler SystemsYoung Suhspecial
09/24/2025Lighting controlsJONAR MADRIAGAenergy_progress
09/24/2025Interior lighting powerJONAR MADRIAGAenergy_progress
09/22/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mount Sinai WestMedical / HealthcareFloor 9
Project M00797507 Alteration · LOC Issued · 10/13/2022
Project M00797531 Alteration · LOC Issued · 10/13/2022
Project M00797573 Alteration · LOC Issued · 10/13/2022
Project M00797477 Alteration · LOC Issued · 09/29/2022
Mount Sinai Morningside Cath Lab #3Medical / HealthcareFloor 3
Project M00411037 Alteration · LOC Issued · 12/01/2020
Mt Sinai St Luke'sMedical / HealthcareFloor 3
Project M00309702 Alteration · LOC Issued · 03/16/2020
Project M00309719 Alteration · LOC Issued · 03/16/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 3,020 on file (BIS + DOB NOW)
▸Plans & Drawings104
▸DOB NOWPlans/Sketch83
09/06/2026M00040616-I1Request digital key ↗
09/06/2026M00099805-I1Request digital key ↗
09/03/2026M00506874-I1Request digital key ↗
Showing 3 of 83 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00254102-I1Request digital key ↗
09/05/2026M00309719-I1Request digital key ↗
09/04/2026M00385127-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00254164-I1Request digital key ↗
09/05/2026M00309702-I1Request digital key ↗
09/04/2026M00385135-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/05/2026M00254252-I1Request digital key ↗
09/05/2026M00254209-I1Request digital key ↗
09/04/2026M00386998-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00312316-I1Request digital key ↗
09/04/2026M00404622-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00152997-I1Request digital key ↗
09/04/2026M00404609-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00388904-I1Request digital key ↗
▸Applications & Permits562
▸BISPLAN / WORK APPROVAL APPLICATION323
04/25/2024122236259Open ↗
04/25/2024122236259Open ↗
01/04/2024122644451Open ↗
Showing 3 of 323 on file for this type
▸BISWORK PERMIT APPLICATION239
08/17/2022122967968Open ↗
08/02/2022122630563Open ↗
08/02/2022122485300Open ↗
Showing 3 of 239 on file for this type
▸Seals & Professional Certifications853
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION342
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 342 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT114
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 114 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature102
09/05/2026M00254102-I1Open ↗
09/05/2026M00254209-I1Open ↗
09/05/2026M00312316-I1Open ↗
Showing 3 of 102 on file for this type
▸DOB NOWProgress Inspector Seal & Signature90
09/28/2026M00850892-P1Open ↗
09/26/2026M00958324-I1Open ↗
09/26/2026M00958324-I1Open ↗
Showing 3 of 90 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST80
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 80 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature78
09/28/2026M00850892-P1Open ↗
09/26/2026M00958324-I1Open ↗
09/23/2026M00850950-P1Open ↗
Showing 3 of 78 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISProfessional and Owner Certification (POC3)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Trade Schedules & Equipment142
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE85
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 85 on file for this type
▸BISSCHEDULE B - PLUMBING14
10/25/2022122485300Open ↗
Showing 1 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS11
02/16/2023122524848Open ↗
02/16/2023122524848Open ↗
02/09/2023122524848Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
02/16/2023122524848Open ↗
02/09/2023122524848Open ↗
01/30/2023122485319Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT3
05/16/2023122691328Open ↗
02/09/2023122524848Open ↗
05/10/2022122485284Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS3
05/16/2023122691328Open ↗
02/09/2023122524848Open ↗
05/10/2022122485284Open ↗
▸DOB NOWFDNY: Letter of No Objection2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection9
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Environmental & Asbestos173
▸BISASBESTOS: CERTIFICATION (DEP ACP5)78
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 78 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report50
09/05/2026M00309702-I1Open ↗
09/04/2026M00385135-I1Open ↗
09/04/2026M00411037-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form24
09/05/2026M00254102-I1Open ↗
09/05/2026M00254209-I1Open ↗
09/02/2026M00707653-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance206
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS104
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 104 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS24
12/22/2022140961975Open ↗
Showing 1 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY22
03/28/2023122671518Open ↗
03/16/2023122691328Open ↗
12/22/2022140961975Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)13
05/16/2023122691328Open ↗
02/15/2023122671518Open ↗
02/09/2023122524848Open ↗
Showing 3 of 13 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS5
05/16/2023122691328Open ↗
02/09/2023122524848Open ↗
05/10/2022122485284Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BIS* DUCT LEAKAGE TESTING5
05/16/2023122691328Open ↗
02/15/2023122671518Open ↗
02/09/2023122524848Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRIC MOTORS5
05/16/2023122691328Open ↗
02/15/2023122671518Open ↗
02/09/2023122524848Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER4
05/16/2023122691328Open ↗
02/15/2023122671518Open ↗
02/09/2023122524848Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING CONTROLS4
05/16/2023122691328Open ↗
02/15/2023122671518Open ↗
02/09/2023122524848Open ↗
Showing 3 of 4 on file for this type
▸BIS* HVAC INSULATION AND SEALING4
05/16/2023122691328Open ↗
02/09/2023122524848Open ↗
05/10/2022122485284Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL ENERGY CONSUMPTION3
02/15/2023122671518Open ↗
02/09/2023122524848Open ↗
05/10/2022122485284Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL3
01/23/2023122485319Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports71
▸BISTECHNICAL REPORT: RESPONSIBILITY50
04/04/2023122671518Open ↗
03/29/2023122671518Open ↗
03/28/2023122671518Open ↗
Showing 3 of 50 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)6
05/16/2023122691328Open ↗
02/15/2023122671518Open ↗
02/09/2023122524848Open ↗
Showing 3 of 6 on file for this type
▸BISMECHANICAL SYSTEMS5
05/16/2023122691328Open ↗
02/15/2023122671518Open ↗
02/09/2023122524848Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISMASONRY3
01/23/2023122485319Open ↗
Showing 1 of 3 on file for this type
▸BIS* EXIT SIGNS3
05/16/2023122691328Open ↗
02/15/2023122671518Open ↗
05/10/2022122485284Open ↗
▸Approvals, Objections & Sign-offs260
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter98
09/05/2026M00254102-I1Open ↗
09/05/2026M00254209-I1Open ↗
09/05/2026M00312316-I1Open ↗
Showing 3 of 98 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST72
01/04/2024140399842Open ↗
01/03/2024140430647Open ↗
01/03/2024122644451Open ↗
Showing 3 of 72 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION21
08/25/2022122967968Open ↗
Showing 1 of 21 on file for this type
▸BISLANDMARKS APPROVAL20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISFINAL14
05/16/2023122691328Open ↗
02/15/2023122671518Open ↗
02/09/2023122524848Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLANDMARKS SIGNOFF11
01/04/2024140399842Open ↗
01/03/2024140430647Open ↗
02/09/2023122524848Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter9
09/02/2026M00707653-I1Open ↗
09/02/2026M00707667-I1Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership229
▸BISCOST AFFIDAVIT203
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 203 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW322
05/16/2023122691328Open ↗
02/15/2023122524848Open ↗
01/23/2023122485319Open ↗
Showing 3 of 22 on file for this type
▸BISDEPT OF FINANCE VERIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Filing & Intake Forms270
▸BISEFILING COVER SHEET153
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 153 on file for this type
▸BISBOROUGH INTAKE FORM58
08/17/2022122967968Open ↗
08/02/2022122630563Open ↗
08/02/2022122485300Open ↗
Showing 3 of 58 on file for this type
▸BISADDITIONAL INFORMATION44
11/01/2022122485300Open ↗
Showing 1 of 44 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸Other Documents93
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION79
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 79 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISMAINTENANCE INFORMATION3
05/16/2023122691328Open ↗
02/09/2023122524848Open ↗
05/10/2022122485284Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type