💬 Discuss this project
1930Year Built
2Stories
F5Building Class
M1-2A/R6AZoning
44,923 sfGross Floor Area
14Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: GMDC Atlantic Avenue · 26,365 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWUD Furniture1p · 1 filing · 20 docs
Floor 1WUD Furniture8p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
D.P. Consulting501/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D.P. Consulting1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Schweitzer and CrossonGeneral Contractor303/21/2026
Irwin Friedman & SonsFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&B Engineers and Architects2461501/10/2025
Building Lifecycle
All (33)Filed (5)Permit Issued (2)Signed Off (2)Violation (1)Inspection (3)Objection (8)Special Inspection (12)
02/06/2025
Signed off — Alteration
Project is associated with the installation of a spray booth to conduct surface coating operations. 2 sprinkler heads being added to existing approved sprinkler system
B01073118-I1
02/05/2025
Signed off — Alteration
Project is associated with the installation of a spray booth to conduct surface coating operations. 2 sprinkler heads being added to existing approved sprinkler system
B01073118-S1
02/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/14/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/13/2025
Special inspection requirement — Sprinkler Systems
Christopher Desmond
01/10/2025
Filed — Alteration
Project is associated with the installation of a spray booth to conduct surface coating operations. 2 sprinkler heads being added to existing approved sprinkler system
B01073118-P3
01/09/2025
Permit issued — Sprinklers
B01073118-S1-EW-SP
01/03/2025
Objection resolved — Addressed
12/31/2024
Objection raised — Scope
12/30/2024
Filed — Alteration
Project is associated with the installation of a spray booth to conduct surface coating operations. 2 sprinkler heads being added to existing approved sprinkler system
B01073118-P2
12/23/2024
Special inspection requirement — Sprinkler Systems
Christopher Desmond
11/26/2024
Special inspection requirement — Mechanical Systems
Christopher Desmond
11/26/2024
Special inspection requirement — Final
Christopher Desmond
11/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Desmond
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Desmond
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Desmond
11/20/2024
Filed — Alteration
Project is associated with the installation of a spray booth to conduct surface coating operations. 2 sprinkler heads being added to existing approved sprinkler system
B01073118-P1
11/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Desmond
11/18/2024
Special inspection requirement — Mechanical Systems
Christopher Desmond
11/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Desmond
11/18/2024
Special inspection requirement — Final
Christopher Desmond
11/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Desmond
11/01/2024
Filed — Alteration
Project is associated with the installation of a spray booth to conduct surface coating operations. 2 sprinkler heads being added to existing approved sprinkler system
B01073118-S1
10/15/2024
Permit issued — General Construction
B01073118-I1-GC-CX
08/02/2024
Objection resolved — Addressed
07/26/2024
Objection resolved — Addressed
07/17/2024
Objection resolved — Addressed
07/16/2024
Objection raised — Other
07/16/2024
Objection raised — Admin
07/15/2024
Objection raised — Other
07/10/2024
Filed — Alteration
Project is associated with the installation of a spray booth to conduct surface coating operations. 2 sprinkler heads being added to existing approved sprinkler system
B01073118-I1
12/01/2021
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offIrwin Friedman & Son01/09/2025
DOB NOWGeneral ConstructionSigned-offSchweitzer and Crosson10/15/2024
BISSPISSUEDJ. Caiazzo Plumbing & Heating12/16/2016
BISSPISSUEDJ. Caiazzo Plumbing & Heating11/04/2015
BISMHISSUEDFire Violations Services08/18/2015
2 projects · most recent 11/07/2024
General Wiring
FiledStatusContractorScope
11/07/2024CompleteRedline Electric—
12/06/2018CompleteOhm Pro Electl ConstructionGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/13/2025Sprinkler SystemsChristopher Desmondspecial
12/23/2024Sprinkler SystemsChristopher Desmondspecial
11/26/2024Mechanical SystemsChristopher Desmondspecial
11/26/2024FinalChristopher Desmondprogress
11/26/2024Fire-Resistance Rated ConstructionChristopher Desmondprogress
11/26/2024Energy Code Compliance InspectionsChristopher Desmondprogress
11/26/2024Fire-Resistant Penetrations and JointsChristopher Desmondspecial
11/18/2024Fire-Resistant Penetrations and JointsChristopher Desmondspecial
11/18/2024Mechanical SystemsChristopher Desmondspecial
11/18/2024Energy Code Compliance InspectionsChristopher Desmondprogress
11/18/2024FinalChristopher Desmondprogress
11/18/2024Fire-Resistance Rated ConstructionChristopher Desmondprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
WUD FurnitureIndustrial / WarehouseFloor 1
Project B01073118 Alteration · LOC Issued · 07/10/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01073118-S1Request digital key ↗
08/23/2026B01073118-I1Request digital key ↗
08/23/2026B01073118-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
11/17/2015321166368Open ↗
09/02/2015321166368Open ↗
09/02/2015321166368Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
07/25/2016321166368Open ↗
08/19/2015321166368Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/21/2016321166368Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature6
08/24/2026B01073118-I1Open ↗
08/24/2026B01073118-I1Open ↗
08/24/2026B01073118-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/30/2026B01073118-S1Open ↗
08/24/2026B01073118-I1Open ↗
08/24/2026B01073118-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026B01073118-P1Open ↗
08/23/2026B01073118-S1Open ↗
08/23/2026B01073118-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/08/2017321166368Open ↗
01/11/2017321166368Open ↗
08/19/2015321166368Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/19/2015321166368Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/19/2015321166368Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/19/2015321166368Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026B01073118-P1Open ↗
08/23/2026B01073118-S1Open ↗
08/23/2026B01073118-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/19/2015321166368Open ↗
08/19/2015321166368Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/08/2017321166368Open ↗
08/19/2015321166368Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/08/2017321166368Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/08/2017321166368Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/08/2017321166368Open ↗
08/19/2015321166368Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
08/08/2017321166368Open ↗
08/08/2017321166368Open ↗
07/25/2016321166368Open ↗
▸BISEFILING COVER SHEET1
08/19/2015321166368Open ↗