RoofUnder Construction2p · 2 filings · 8 docs
DMStructural
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet
Installation of a kitchen exhuast fan.
On file for this job
2 documents · 1 drawing sheet
Floor 412p · 12 filings · 16 docs
ArchitectureGeneral
No filed description on record for this job.
On file for this job
2 documents
No filed description on record for this job.
On file for this job
2 documents
No filed description on record for this job.
On file for this job
2 documents
Latest 3 of 8 filings on this floor.
Floor 40Under Construction7p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 40th Floor as per plans (Hines - Demo.) No change to use, egress or occupancy.
On file for this job
4 documents
Modifications to the existing Sprinkler System: Remove (277) existing sprinkler heads, Install (43) new sprinkler heads and associated sprinkler piping on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy.
On file for this job
3 documents
Removal of plumbing fixtures and associated CW/sanitary piping on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy. No change to use, egress or occupancy.
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 398p · 3 filings · 17 docs
ArchitectureDMGeneralMechanicalOther
Issued Permit Scope
General Construction · Mechanical Systems
General construction on 39th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Replacement of air conditioning units on the 39th and 40th floor IDF rooms
On file for this job
3 documents
INTERIOR RENOVATION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
9 documents · 3 drawing sheets
Floor 38Under Construction14p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Removal of plumbing fixtures and associated CW/sanitary piping on the 38th Floors as per plans (IMC Demo Phase.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 38th Floors as per plans (IMC - Demo Phase.) No change to use, egress or occupancy.
On file for this job
7 documents
Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 38th Floor as per plans (IMC Demo Phase.) No change to use, egress or occupancy.
On file for this job
3 documents
Latest 3 of 8 filings on this floor.
Floor 378p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Interior removals and modifications to ductwork, associated piping on the 36th & 37th Floors as per plans (Standard Chartered Bank.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
New mechanical system throughout 37th Floor, inclusive of new ductwork, piping, air outlets, AC units, as per plans (Standard Chartered Bank.) No change to use, egress or occupancy.
On file for this job
6 documents · 3 drawing sheets
Plumbing and piping capping & removals for the 36th & 37th Floors, as per plans (Standard Charter Bank). No change to use, egress, or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 36Under Construction17p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Alt CO filed to increase population and establish PA on the 36th fl.
On file for this job
14 documents · 4 drawing sheets
Furnish and Install New Mechanical System throughout floor - new ductwork, piping, FPBs, air outlets and AC Units on the 36th Floor as per plans (Standard Chartered Bank - Phase 2.) No change to use, egress or occupancy.
On file for this job
12 documents · 3 drawing sheets
Interior removals and modifications to ductwork, associated piping on the 36th & 37th Floors as per plans (Standard Chartered Bank.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3517p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers
Structural Modifications: Installation of New Structural Steel and supports for equipment at HUB Room and miscellaneous steel supports on the 35-36th Floors as per plans (Standard Chartered Bank.) No change to use, egress or occupancy.
On file for this job
8 documents · 2 drawing sheets
Install new Mechanical System throughout: New CAC, WSHPs, PCWPs, HX, SCWP, new ductwork, associated piping, FPBs, air outlets etc on the 35th Floor as per plans (Standard Chartered Bank.) No change to use, egress or occupancy.
On file for this job
12 documents · 3 drawing sheets
Modifications to the existing Sprinkler System: Removal of (179) existing heads and associated piping; Install (22) new temporary heads and associated piping on the 35th Floor as per plans (LL Work - Demolition.) No change to use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 344p · 3 filings · 15 docs
ArchitectureFire ProtectionMechanical
Modifications to the existing HVAC System as per plans (Lloyds Banking Group.) No change to use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
Modifications to the existing sprinkler system: Install (9) new sprinkler heads, Relocate (13) existing sprinkler heads and Remove (2) existing sprinkler heads and associated piping on the 34th Floor as per plans (Lloyds Banking Group.)
On file for this job
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 34th Floor as per plans (Lloyds Banking Group.) No change to use, egress or occupancy.
On file for this job
5 documents · 2 drawing sheets
Floor 3340p · 14 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction
Herewith filing administrative removal of Place of assembly occupancies on the 25th and 33rd office floors. Related Alt-2 application numbers: M00987959 and M01085014. No changes to use or egress.
On file for this job
16 documents · 4 drawing sheets
Modifications to the existing Sprinkler System: Install (134) new sprinkler heads and associated piping on the 33rd Floor as per plans (CDPQ.) No change to use, egress or occupancy.
On file for this job
8 documents · 5 drawing sheets
Modifications to the existing HVAC System: Installation of new ductwork, diffusers, controls and AC Units on the 33rd Floor as per plans (CDPQ.) No change to use, egress or occupancy.
On file for this job
6 documents · 8 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3218p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction
Herewith filing administrative removal of Place of assembly occupancies on the 25th and 33rd office floors. Related Alt-2 application numbers: M00987959 and M01085014. No changes to use or egress.
On file for this job
16 documents
Modifications to the existing Sprinkler System: Removal of (100) existing sprinkler heads and piping, Install (110) new sprinkler heads and piping on the 32nd Floor as per plans (China Construction Bank.) No change to use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
Herewith filing to establish new place of assembly on the 32nd floor, accessory to offices.
On file for this job
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 315p · 2 filings · 10 docs
Fire ProtectionGeneral
Issued Permit Scope
Sprinklers
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 26-27, 29-31st Floors as per plans (Dechert LLP - Demo and Buildout.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Remove (15) heads, Relocate (44), Install (10) new heads on 26; REL (11) heads, Install (3) new heads on 27; REL (28) heads, Install (3) new on 29; REM (6) heads, REL (31) heads, Install (7) new heads on 30; REL (14) and Install (3) new heads and piping.
On file for this job
4 documents
Floor 305p · 2 filings · 10 docs
Fire ProtectionMechanical
Issued Permit Scope
Sprinklers
Modifications to the existing HVAC System: Removal of ductwork, piping, AC units, controls and wiring. Relocate thermostats, extend control wiring, install new BMS controllers on 26-27, 29-31st Floor as per plans (Dechert LLP - Demo & Buildout.)
On file for this job
6 documents · 1 drawing sheet
Remove (15) heads, Relocate (44), Install (10) new heads on 26; REL (11) heads, Install (3) new heads on 27; REL (28) heads, Install (3) new on 29; REM (6) heads, REL (31) heads, Install (7) new heads on 30; REL (14) and Install (3) new heads and piping.
On file for this job
4 documents
Floor 295p · 2 filings · 10 docs
Fire ProtectionMechanical
Issued Permit Scope
Sprinklers
Modifications to the existing HVAC System: Removal of ductwork, piping, AC units, controls and wiring. Relocate thermostats, extend control wiring, install new BMS controllers on 26-27, 29-31st Floor as per plans (Dechert LLP - Demo & Buildout.)
On file for this job
6 documents · 1 drawing sheet
Remove (15) heads, Relocate (44), Install (10) new heads on 26; REL (11) heads, Install (3) new heads on 27; REL (28) heads, Install (3) new on 29; REM (6) heads, REL (31) heads, Install (7) new heads on 30; REL (14) and Install (3) new heads and piping.
On file for this job
4 documents
Floor 28Under Construction5p · 2 filings · 9 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Modifications to the existing HVAC System: Installation of new supplemental AC Unit, ductwork, controls on the 28th Floor as per plans (Dechert LLP - Supplemental AC Unit.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Modifications to the existing HVAC System: Installation of new 40-ton AC Unit, ductwork, controls on the 28th Floor as per plans (Dechert LLP - AC Unit.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Floor 274p · 1 filing · 4 docs
Fire Protection
Issued Permit Scope
Sprinklers
Remove (15) heads, Relocate (44), Install (10) new heads on 26; REL (11) heads, Install (3) new heads on 27; REL (28) heads, Install (3) new on 29; REM (6) heads, REL (31) heads, Install (7) new heads on 30; REL (14) and Install (3) new heads and piping.
On file for this job
4 documents
Floor 265p · 2 filings · 7 docs
ArchitectureFire Protection
Issued Permit Scope
Sprinklers
Remove (15) heads, Relocate (44), Install (10) new heads on 26; REL (11) heads, Install (3) new heads on 27; REL (28) heads, Install (3) new on 29; REM (6) heads, REL (31) heads, Install (7) new heads on 30; REL (14) and Install (3) new heads and piping.
On file for this job
4 documents
Interior stair demolition on 25th floor as per plans filed herewith. No change to use, egress, or occupancy .
On file for this job
3 documents · 1 drawing sheet
Floor 25Under Construction28p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Alt CO filed to increase population and establish PA on the 36th fl.
On file for this job
14 documents
Herewith filing administrative removal of Place of assembly occupancies on the 25th and 33rd office floors. Related Alt-2 application numbers: M00987959 and M01085014. No changes to use or egress.
On file for this job
16 documents · 2 drawing sheets
Install New Plumbing Fixtures: (10) lavatories, (8) WCs, (2) UR, (1) FD and associated CW/sanitary piping on the 25th Floor as per plans (LL Work - Restrooms.) No change to use, egress or occupancy. No change to use, egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 24Under Construction6p · 1 filing · 4 docs
Plumbing
Issued Permit Scope
Plumbing
Install (5) BFPs (secondary), (3) CM, (2) DW, (1) IM, (4) FDs, (1) WC, (1) Lav, (1) HWH, (2) sinks, (1) water dispenser, (1) circulation pump and associated CW/drainage piping on 25th Floor; Install sanitary piping on 24th Floor (Salesforce Tower NY F25.)
On file for this job
4 documents · 1 drawing sheet
Floor 232p · 3 filings · 10 docs
ArchitectureDMMechanical
Modifications to the existing HVAC system on the 23rd Floor (Salesforce - AV Room), as per plans. No change to use, egress, or occupancy.
On file for this job
6 documents · 2 drawing sheets
No filed description on record for this job.
On file for this job
2 documents
No filed description on record for this job.
On file for this job
2 documents
Floor 222p · 2 filings · 10 docs
ArchitectureElectrical
Modifications to the existing Sprinkler System: Remove (253) existing sprinkler heads, Install (43) new temporary sprinkler heads, and (5) new permanent heads and associated sprinkler piping on the 25th Floor as per plans (LL Work - Demo & Restrooms.)
On file for this job
8 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 21
Floor 2039p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Plumbing Modifications: Remove 3/4 Cold Water Piping from point of connection to base building stub, points to be adjusted and capped on the 20th Floor as per plans (Salesforce Demo.) No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Install New: (1) HWH, (2) FDs, (1) sink, (1) WC, (1) Lav, (2) CM, (1) WD, (1) IM, (4) backflow preventers and associated CW/sanitary piping on the 20th Floor, and sanitary piping on the 19th Floor as per plans (Salesforce Conference Room Conversions.)
On file for this job
15 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Install (9) new sprinkler heads and associated piping on the 20th Floor as per plans (Salesforce - Buildout/ Conference Room Conversion.) No change to use, egress or occupancy.
On file for this job
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 19Under Construction32p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Remove plumbing fixtures and associated piping. Install new plumbing fixtures and associated CW/sanitary piping on the 16-20th Floors as per plans (Salesforce Restrooms Refresh.) No change to use, egress or occupancy.
On file for this job
8 documents
Remove (6) head, install (6) new heads on 17; Remove (7) head, install (7) new heads on 18; Remove (7) head, install (7) new heads on 19; Remove (6) head, install (6) new heads on 20th Flr and associated piping as per plans (Salesforce Restroom Refresh.)
On file for this job
4 documents
Modifications to the existing HVAC System: Installation of new ductwork, diffusers and grilles on the 17-20th Floors as per plans (Salesforce Restroom Refresh.) No change to use, egress or occupancy.
On file for this job
5 documents
Latest 3 of 6 filings on this floor.
Floor 18Under Construction34p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Remove plumbing fixtures and associated piping. Install new plumbing fixtures and associated CW/sanitary piping on the 16-20th Floors as per plans (Salesforce Restrooms Refresh.) No change to use, egress or occupancy.
On file for this job
8 documents
Remove (6) head, install (6) new heads on 17; Remove (7) head, install (7) new heads on 18; Remove (7) head, install (7) new heads on 19; Remove (6) head, install (6) new heads on 20th Flr and associated piping as per plans (Salesforce Restroom Refresh.)
On file for this job
4 documents
Modifications to the existing HVAC System: Installation of new ductwork, diffusers and grilles on the 17-20th Floors as per plans (Salesforce Restroom Refresh.) No change to use, egress or occupancy.
On file for this job
5 documents
Latest 3 of 7 filings on this floor.
Floor 17Under Construction35p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Remove plumbing fixtures and associated piping. Install new plumbing fixtures and associated CW/sanitary piping on the 16-20th Floors as per plans (Salesforce Restrooms Refresh.) No change to use, egress or occupancy.
On file for this job
8 documents
Remove (6) head, install (6) new heads on 17; Remove (7) head, install (7) new heads on 18; Remove (7) head, install (7) new heads on 19; Remove (6) head, install (6) new heads on 20th Flr and associated piping as per plans (Salesforce Restroom Refresh.)
On file for this job
4 documents
Modifications to the existing HVAC System: Installation of new ductwork, diffusers and grilles on the 17-20th Floors as per plans (Salesforce Restroom Refresh.) No change to use, egress or occupancy.
On file for this job
5 documents
Latest 3 of 8 filings on this floor.
Floor 16Under Construction7p · 2 filings · 12 docs
PlumbingStructural
Issued Permit Scope
Plumbing
Remove plumbing fixtures and associated piping. Install new plumbing fixtures and associated CW/sanitary piping on the 16-20th Floors as per plans (Salesforce Restrooms Refresh.) No change to use, egress or occupancy.
On file for this job
8 documents
Modification of Standpipe system. Relocation of hose cabinet. No change of use, occupancy or egress.
On file for this job
4 documents · 1 drawing sheet
Floor 15
Floor 1415p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Installation of new plumbing fixtures: (2) drinking fountains, (2) sinks, (2) water dispensers and (1) HWH with associated waste, vent, and water piping on the 14th Floor as per plans (VTS Office Renovations.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Remove (39) existing sprinkler heads, Relocate (19) existing sprinkler heads and install (12) new sprinkler heads and associated piping on the 14th Floor as per plans (VTS Office Renovations.)
On file for this job
7 documents · 1 drawing sheet
Minor interior demo: Removal and disposal of interior partitions, fixtures, suspended ceilings, floor finishes; Installation of new partitions, doors, floor/wall finishes and suspended ceilings on the 14th Floor as per plans (VTS Office Renovation.)
On file for this job
3 documents · 7 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 13
Floor 1210p · 3 filings · 10 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Hereby filing modification to existing sprinkler system per plans filed herewith.
On file for this job
4 documents · 1 drawing sheet
Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.
On file for this job
3 documents
Hereby filing general construction for modification to concrete equipment pad and minor wall alterations in support of new mechanical equipment and rigging paths. No change to use, egress or occupancy
On file for this job
3 documents · 1 drawing sheet
Floor 1122p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Hereby filing modification to existing sprinkler system per plans filed herewith.
On file for this job
3 documents · 1 drawing sheet
Hereby filing concrete equipment pad modifications and minor wall alterations in support of new mechanical equipment and rigging paths on floor 7, and 9 thru 11
On file for this job
11 documents · 1 drawing sheet
Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.
On file for this job
3 documents
Latest 3 of 7 filings on this floor.
Floor 1015p · 4 filings · 11 docs
ArchitectureDMMechanical
Issued Permit Scope
Mechanical Systems
Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.
On file for this job
3 documents · 1 drawing sheet
Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.
On file for this job
3 documents · 4 drawing sheets
Hereby filing general construction for modification to concrete equipment pad and minor wall alterations in support of new mechanical equipment and rigging paths. No change to use, egress or occupancy
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 910p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Hereby filing modification to existing sprinkler system per plans filed herewith.
On file for this job
3 documents · 1 drawing sheet
Hereby filing concrete equipment pad modifications and minor wall alterations in support of new mechanical equipment and rigging paths on floor 7, and 9 thru 11
On file for this job
11 documents · 6 drawing sheets
Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 813p · 3 filings · 10 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Hereby filing modification to existing sprinkler system per plans filed herewith.
On file for this job
4 documents · 1 drawing sheet
Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.
On file for this job
3 documents · 2 drawing sheets
Hereby filing general construction for modification to concrete equipment pad and minor wall alterations in support of new mechanical equipment and rigging paths. No change to use, egress or occupancy
On file for this job
3 documents · 2 drawing sheets
Floor 715p · 10 filings · 20 docs
ArchitectureMechanicalPlumbing
Hereby filing concrete equipment pad modifications and minor wall alterations in support of new mechanical equipment and rigging paths on floor 7, and 9 thru 11
On file for this job
11 documents · 1 drawing sheet
Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.
On file for this job
3 documents · 3 drawing sheets
No filed description on record for this job.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 6
Floor 516p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Minor interior demolition. Installation of new interior partitions, office fronts, folding partitions, flooring, suspended ceilings, conference rooms, closets and finishes as per plans (RenRe - Tenant Renovations.) No change to use, egress or occupancy.
On file for this job
12 documents · 6 drawing sheets
Installation of new Structural Steel beam and supports for for sliding modernfold partition and movable partition tracks on the 5th Floor as per plans (RenRe - Tenant Renovations.) No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Modifications to the existing HVAC System: Install new ductwork, new pipework distribution, new FPB's, FCU's, (2) CRAC's and BMS controls on the 5th Floor as per plans (RenRe - Tenant Renovation.) No change to use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 422p · 16 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Sign
Modifications to the existing Sprinkler System: Remove (14) heads and Install (16) new heads and piping on 3rd Floor, Remove (16) heads and Install (19) new heads and associated piping on the 4th Floor as per plans (Stifel Pantry Project.)
On file for this job
4 documents · 1 drawing sheet
Minor interior demo: remove and discard walls, ceilings, flooring and millwork. Install new walls, doors, frames, pantry cabinets, island, suspended ceiling, flooring and finishes on the 3-4th Floors as per plans (Stifel Restroom Project.)
On file for this job
3 documents · 4 drawing sheets
Remove fixtures and piping. Install NEW: (2) DF, (2) chiller, (2) CM, (1) IM, (1) DW, (1) PS, (1) WD, (1) HWH, (1) FD on 3rd Floor, (2) Chiller, (2) CM, (2) IM, (1) DW, (1) PS, (1) WD, (1) HWH, (1) FD on 4th Floor and associated CW/sanitary piping.
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 316p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sign
Modifications to the existing HVAC System: Installation of new ductwork, insulation, air outlets, relocate FPB and controls on the 3-4th Floors as per plans (Stifel - New Offices & Conference Rooms.) No change to use, egress or occupancy.
On file for this job
6 documents · 2 drawing sheets
Modifications to the existing Sprinkler System: Remove (14) heads and Install (16) new heads and piping on 3rd Floor, Remove (16) heads and Install (19) new heads and associated piping on the 4th Floor as per plans (Stifel Pantry Project.)
On file for this job
4 documents · 1 drawing sheet
Remove fixtures and piping. Install NEW: (2) DF, (2) chiller, (2) CM, (1) IM, (1) DW, (1) PS, (1) WD, (1) HWH, (1) FD on 3rd Floor, (2) Chiller, (2) CM, (2) IM, (1) DW, (1) PS, (1) WD, (1) HWH, (1) FD on 4th Floor and associated CW/sanitary piping.
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 218p · 8 filings · 20 docs
CivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sign
Plumbing Modifications: Install (1) DFs, (1) WD, (2) DW, (2) sinks, (2) CMs, (1) IM, (2) refrigerators, (3) WCs, (3) Lavatories, (1) shower, (4) HWHs and associated CW/sanitary piping on the 33rd Floor as per plans (CDPQ.)
On file for this job
8 documents · 1 drawing sheet
Modifications to the existing HVAC, Install new ductwork, exhaust flue, dampers and controls in relation to new Life Safety Generator as per plans. No change to use, egress or occupancy.
On file for this job
22 documents · 2 drawing sheets
Installation of new 1,300 gallon NYC-rated Main Fuel Oil Tank with concrete curb around room for 100% containment as per plans (Life Safety Generator.) No change to use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 161p · 16 filings · 19 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (Retail Wine Store.) No change to use, egress or occupancy.
On file for this job
3 documents
HVAC removals on the 1st floor (Retail- Demo & Whitebox) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Removal of existing plumbing fixtures and associated piping on the 1st floor (Retail- Demo & Whitebox) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Mezzanine1p · 1 filing · 10 docs
Structural
Structural Modifications and reinforcement of existing beams as per plans (Life Safety Generator Project.) No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Cellar44p · 5 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
Minor demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar & 1st Floor as per plans (Pandora Evoke 2.0.) No change to use, egress or occupancy.
On file for this job
12 documents · 6 drawing sheets
Modifications to the existing HVAC System on the Cellar & 1st Floors as per plans (Pandora - Evoke 2.0.) No change to use, egress or occupancy.
On file for this job
6 documents
Install (1) Drinking fountain and relocate (1) existing sink and associated CW/sanitary piping on the cellar level as per plans (Pandora.) No change to use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Sub-Cellar6p · 2 filings · 20 docs
Fire ProtectionGeneralMechanical
Modifications to the existing HVAC, Install new ductwork, exhaust flue, dampers and controls in relation to new Life Safety Generator as per plans. No change to use, egress or occupancy.
On file for this job
22 documents · 2 drawing sheets
Remove (12) existing sprinkler heads, Relocate (6) sprinkler heads and install (27) new sprinkler heads and associated piping on the Sub Cellar Level as per plans (Life Safety Generator.) No change to use, egress or occupancy.
On file for this job
28 documents · 4 drawing sheets