← Back
Predominantly retail with other uses
1097 2 AVENUE
MANHATTAN · BIN 1038619
💬 Discuss this project
1910Year Built
4Stories
K4Building Class
C2-8Zoning
3,600 sfGross Floor Area
4Units
5 Open Violations ▸
Predominantly retail with other uses · Owner of record: 1097 SECOND AVENUE · 1,200 sf lot · 3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1097 SECOND2607/08/2026
2ND AVE. PROPERTY LLC103/22/2026
C O OLMSTEAD PROPERTIES503/21/2026
GRACEFUL SERVICES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUAN DESIGN INC.411/04/2024
GREEN DESIGN305/08/2021
WAYPOINT CONSULTING GROUP101/13/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor603/21/2026
NAN TONG JIN YI CONSTRUCTGeneral Contractor603/21/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
JRR CONTRACTING INCGeneral Contractor307/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
STEWART RONALDElectrical103/21/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
RONALD STEWARTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669411/04/2024
NKM ENGINEERING PLLC6244211/04/2024
WAYPOINT CONSULTING GROUP6175101/13/2021
Building Lifecycle
All (32)Filed (8)Permit Issued (10)Signed Off (4)Violation (7)Inspection (3)
06/15/2026
Violation issued (ECB, open)
Zoning
12/30/2024
Signed off — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WOTH GENERN CONSTRUCTION WORK, TO INSTALL NEW AC UNITS ON 2ND FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS, OR CERTIFICATIO OF OCCUPANCY.
M01103268-I1
12/30/2024
Signed off — Alteration
TO PROPOSE PLUMBING WORK, TO MINOR CHANGE EXISTING SPRINKLER SYSTEM OF EXISTING COMMERCIAL SPACE ON 2ND FLOOR IN CONJUNCTION WITH ALTERATION JOB #M01103268-I1 AS PER PLAN FILED HEREWITH. NO CAHNGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
M01103290-I1
12/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/04/2024
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WOTH GENERN CONSTRUCTION WORK, TO INSTALL NEW AC UNITS ON 2ND FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS, OR CERTIFICATIO OF OCCUPANCY.
M01103268-P1
11/04/2024
Filed — Alteration
TO PROPOSE PLUMBING WORK, TO MINOR CHANGE EXISTING SPRINKLER SYSTEM OF EXISTING COMMERCIAL SPACE ON 2ND FLOOR IN CONJUNCTION WITH ALTERATION JOB #M01103268-I1 AS PER PLAN FILED HEREWITH. NO CAHNGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
M01103290-P1
09/30/2024
Permit issued — General Construction
M01103268-I1-MS
09/27/2024
Permit issued — General Construction
M01103268-I1-GC
09/19/2024
Permit issued — General Construction
M01103268-I1-GC
09/19/2024
Permit issued — General Construction
M01103268-I1-MS
09/19/2024
Permit issued — Sprinklers
M01103290-I1-EW-SP
09/18/2024
Permit issued — Sprinklers
M01103290-I1-PL
09/11/2024
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WOTH GENERN CONSTRUCTION WORK, TO INSTALL NEW AC UNITS ON 2ND FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS, OR CERTIFICATIO OF OCCUPANCY.
M01103268-I1
09/11/2024
Filed — Alteration
TO PROPOSE PLUMBING WORK, TO MINOR CHANGE EXISTING SPRINKLER SYSTEM OF EXISTING COMMERCIAL SPACE ON 2ND FLOOR IN CONJUNCTION WITH ALTERATION JOB #M01103268-I1 AS PER PLAN FILED HEREWITH. NO CAHNGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
M01103290-I1
06/17/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00437605-I1
06/11/2021
Signed off — Alteration
Masonry repairs along front facade of 4 story building, including face brick replacement, resetting windowsills and stone lintels, caulking and sealing of joints
M00451027-I1
05/08/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00437605-P2
04/16/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00437605-P1
03/23/2021
Permit issued — General Construction
M00451027-I1-GC
02/05/2021
Permit issued — General Construction
M00451027-I1-GC
01/13/2021
Filed — Alteration
Masonry repairs along front facade of 4 story building, including face brick replacement, resetting windowsills and stone lintels, caulking and sealing of joints
M00451027-I1
12/18/2020
Permit issued — Sidewalk Shed
M00437605-I1-SH
12/18/2020
Permit issued — Sidewalk Shed
M00437605-I1-SF
12/08/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00437605-I1
12/31/2009
Violation issued (ECB, closed)
Construction
05/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2003
Violation issued (ECB, closed)
Quality of Life
09/19/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP09/30/2024
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP09/27/2024
DOB NOWGeneral ConstructionSigned-offNAN TONG JIN YI CONSTRUCT09/19/2024
DOB NOWGeneral ConstructionSigned-offNAN TONG JIN YI CONSTRUCT09/19/2024
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL09/19/2024
DOB NOWSprinklersSigned-offWASOFF PLBG & UTILITY CO09/18/2024
DOB NOWGeneral ConstructionSigned-offJRR CONTRACTING INC03/23/2021
DOB NOWGeneral ConstructionSigned-offJRR CONTRACTING INC02/05/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC12/18/2020
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC12/18/2020
BIS—ISSUEDLEE & COMPANY OF NY, INC04/19/2012
BIS—ISSUEDLEE & COMPANY OF NY, INC12/19/2011
BIS—ISSUEDLEE & COMPANY OF NY, INC03/12/2009
BISMHISSUEDLEE & COMPANY OF NY, INC10/27/2008
BIS—ISSUEDLEE & COMPANY OF NY, INC04/09/2008
BISPLISSUEDATC. PLUMBING & MECH.,INC.03/18/2008
BISOTISSUEDGS SIGN & AWNING CORP07/25/2007
BISOTISSUEDPRIME BUILDERS, INC.05/17/2007
BISPLISSUEDATC PLUMB MECH.11/12/2004
BISMHISSUEDWKL CONSTRUCTION INC.12/18/1996
BISPLISSUEDMAGOR PLUMBING & HEATING10/26/1994
BISFPISSUEDMASTER FIRE SYSTEMS, INC10/17/1994
1 project · most recent 12/01/2020
FiledStatusContractorScope
12/01/2020CompleteELPO ELECTRICAL CONTG INC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/12/2024Tenant Protection Plan ComplianceZHENHUAN XUspecial
11/12/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
11/12/2024Sprinkler SystemsNARESH MAHANGUspecial
11/12/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
11/04/2024HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
11/04/2024FinalZHENHUAN XUprogress
11/04/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
11/04/2024Lighting controlsZHENHUAN XUenergy_progress
11/04/2024Duct leakage testing, insulation and designZHENHUAN XUenergy_progress
11/04/2024HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
11/04/2024HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
11/04/2024Interior lighting powerZHENHUAN XUenergy_progress
11/04/2024Mechanical SystemsZHENHUAN XUspecial
11/04/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
11/04/2024Tenant Protection Plan ComplianceZHENHUAN XUspecial
10/08/2024Sprinkler SystemsNARESH MAHANGUspecial
10/08/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
10/08/2024Tenant Protection Plan ComplianceZHENHUAN XUspecial
10/08/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
05/12/2021FinalBRIAN T. O'CONNORprogress
01/09/2021FinalAlejandro Molinaprogress
01/09/2021MasonryAlejandro Molinaspecial
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch4
08/26/2026M01103268-P1Request digital key ↗
08/26/2026M01103268-I1Request digital key ↗
08/25/2026M01103290-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/04/2026M00437605-I1Request digital key ↗
09/04/2026M00437605-P2Request digital key ↗
09/04/2026M00437605-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/04/2026M00437605-I1Request digital key ↗
09/04/2026M00437605-P2Request digital key ↗
09/04/2026M00437605-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00451027-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
10/28/2008110374130Open ↗
10/28/2008110374130Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/27/2008110374130Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/04/2026M00437605-I1Open ↗
09/04/2026M00437605-P2Open ↗
09/04/2026M00437605-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M01103268-I1Open ↗
09/01/2026M01103268-I1Open ↗
09/01/2026M01103268-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M01103268-I1Open ↗
08/31/2026M01103290-P1Open ↗
08/31/2026M01103290-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/02/2008110374130Open ↗
10/27/2008110374130Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/27/2008110374130Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/27/2008110374130Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/02/2008110374130Open ↗
11/08/2008110374130Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026M01103268-I1Open ↗
08/26/2026M01103268-P1Open ↗
08/25/2026M01103290-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/27/2008110374130Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
10/27/2008110374130Open ↗
▸BISCERTIFICATE OF OCCUPANCY / LOC: REQUEST1
12/02/2008110374130Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/02/2008110374130Open ↗
10/27/2008110374130Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/27/2008110374130Open ↗