← Back
Primarily 5-6 family with 1 store or office
1098 MANHATTAN AVENUE
BROOKLYN · BIN 3063760
💬 Discuss this project
1931Year Built
3Stories
S5Building Class
R7AZoning
4,124 sfGross Floor Area
6Units
9 Open Violations 7 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 1098 MANHATTAN AVE LLC · 2,500 sf lot · 1.65 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof1p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Penthouse5p · 2 filings · 20 docs
Floor 63p · 2 filings · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1098 MANHATTAN AVE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2025$3.8M—— → —$921/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ELEVATED ENGINEERING NYC308/05/2026
GEORGE SCHELL ENGINEERING307/08/2026
MICHAEL MUROFF ARCHITECT LLC204/30/2026
Building Lifecycle
All (99)Filed (8)Violation (11)Objection (50)Special Inspection (30)
09/21/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Addressed
08/28/2026
Objection resolved — Addressed
08/21/2026
Objection raised — Cost
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Other
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Admin
08/21/2026
Objection raised — Admin
08/21/2026
Objection raised — Admin
08/21/2026
Objection raised — Admin
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Inspections
08/21/2026
Objection raised — Inspections
08/21/2026
Objection raised — Fire_Protection
08/21/2026
Objection raised — Admin
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Other
08/21/2026
Objection raised — Inspections
08/07/2026
Objection raised — Structural
08/07/2026
Objection raised — Scope
08/07/2026
Objection raised — Scope
08/07/2026
Objection raised — Scope
08/07/2026
Objection raised — Structural
08/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S2
08/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S3
08/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S1
07/31/2026
Special inspection requirement — Deep Foundation Elements
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Admin
07/29/2026
Objection raised — Admin
07/29/2026
Objection raised — Scope
07/24/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/09/2026
Objection raised — Fire_Protection
07/09/2026
Objection raised — Zoning
07/09/2026
Objection raised — Fire_Protection
07/09/2026
Objection raised — Fire_Protection
07/09/2026
Objection raised — Fire_Protection
07/09/2026
Objection raised — Structural
07/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S5
07/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S4
07/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK FILED IN CONJUNCTION WITH ALT. CO B01371077-I1 FOR 6 STORY W/ PENTHOUSE CONCRETE RESIDENTIAL BUILDING.
B01371077-S6
07/08/2026
Violation issued (ECB, open)
Construction
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/30/2026
Special inspection requirement — Sprinkler Systems
06/30/2026
Special inspection requirement — Seismic Isolation Systems
06/30/2026
Special inspection requirement — Post-installed Anchors
06/23/2026
Objection resolved — Addressed
06/23/2026
Objection resolved — Addressed
06/23/2026
Objection resolved — Addressed
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/22/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Latest 60 of 99 events.
Nothing on file for this building.
1 project · most recent 08/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026——Heating and Air Conditioning Systems
Heat / Cool
Samsung AM048FCM 4 tons · Vrf Indoor ×5
AM018FCM 2 tons · Vrf Indoor ×1
AM060FCM 5 tons · Vrf Outdoor ×1
1 project · most recent 08/05/2026
Sprinkler System
FiledStatusContractorScope
08/05/2026——Sprinkler System
1 project · most recent 08/05/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/05/2026——Storm, Water/Sanitary
1 project · most recent 08/05/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/05/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
07/31/2026Deep Foundation Elements—special
06/30/2026Fire-Resistant Penetrations and Joints—special
06/30/2026Sprinkler Systems—special
06/30/2026Seismic Isolation Systems—special
06/30/2026Post-installed Anchors—special
06/23/2026Structural Stability – Alterations of existing buildings—special
06/22/2026Construction Operations Influencing Adjacent Structures—special
06/22/2026Subsurface Conditions – Fill Placement & In-Place Density—special
06/22/2026Subgrade Inspections—special
06/22/2026Construction Operations Influencing Adjacent Structures—special
06/22/2026Concrete - Cast-In-Place—special
06/22/2026Post-installed Anchors—special
06/22/2026Structural Cold-Formed Steel—special
06/22/2026Concrete - Cast-In-Place—special
06/18/2026Structural Stability – Alterations of existing buildings—special
06/09/2026Final—progress
06/09/2026Final—progress
06/09/2026Footing and Foundation—progress
04/02/2026Insulation placement and R values—energy_progress
04/02/2026Exterior Insulation and Finish Systems (EIFS)—special
04/02/2026Fire-Resistant Penetrations and Joints—special
04/02/2026Wall Panels, Curtain Walls, and Veneers—special
04/02/2026Energy Code Compliance Inspections—progress
04/02/2026Fire-Resistance Rated Construction—progress
04/02/2026Protection of exposed foundation insulation—energy_progress
Latest 25 of 43.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026B01314291-I1Request digital key ↗
08/17/2026B01371077-S5Request digital key ↗
08/17/2026B01371077-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01314291-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026B01371077-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026B01314291-I1Open ↗
08/17/2026B01371077-S5Open ↗
08/17/2026B01371077-S4Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026B01371077-S3Open ↗
08/17/2026B01371077-S2Open ↗
08/17/2026B01371077-S5Open ↗
Showing 3 of 7 on file for this type
▸Other Documents4
▸DOB NOWAdjoining Owners Notification2
08/17/2026B01371077-S2Open ↗
08/17/2026B01371077-S1Open ↗
▸DOB NOWSite Survey: Initial2
08/19/2026B01314291-I1Open ↗
08/17/2026B01371077-I1Open ↗