← Back
Primarily 2 family with 1 store or office
1099 CLARKSON AVENUE
BROOKLYN · BIN 3100684
💬 Discuss this project
1910Year Built
2Stories
S2Building Class
R6Zoning
6,720 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: CLA 1099 LLC · 2,000 sf lot · 3.36 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Floor 211p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAPSTONE PROPERTY CARE1207/08/2026
JRM DEVELOPMENT203/22/2026
CLA 1099 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/04/2022$680K—— → —$101/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.305/29/2023
LESTER KATZ, NCARB309/20/2022
A M ENGINEERING SERVICES PC107/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)1203/21/2026
AM ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM DEVELOPMENT LLCGeneral Contractor507/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616505/29/2023
Building Lifecycle
All (148)Filed (7)Permit Issued (5)Signed Off (3)Violation (60)Inspection (9)Objection (34)Special Inspection (30)
02/12/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
C
07/14/2023
Violation issued (ECB, closed)
Construction
07/12/2023
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING TWO (2) FAMILY WITH A COMMERCIAL RETAIL STORE INTO A NINE (9) CLASS 'A' DWELLING UNITS WITH A COMMERCIAL RETAIL STORE, NO CHANGE TO BULK AND EGRESS.
B00686497-S1
07/05/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/20/2023
Signed off — Alteration
B00790960-I1
06/16/2023
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING TWO (2) FAMILY WITH A COMMERCIAL RETAIL STORE INTO A NINE (9) CLASS 'A' DWELLING UNITS WITH A COMMERCIAL RETAIL STORE, NO CHANGE TO BULK AND EGRESS.
B00686497-S2
06/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/08/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/08/2023
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/08/2023
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
06/08/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/08/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
06/02/2023
Objection resolved — Addressed
05/31/2023
Objection raised — Scope
05/29/2023
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING TWO (2) FAMILY WITH A COMMERCIAL RETAIL STORE INTO A NINE (9) CLASS 'A' DWELLING UNITS WITH A COMMERCIAL RETAIL STORE, NO CHANGE TO BULK AND EGRESS.
B00686497-P2
05/25/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/22/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/22/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/16/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/14/2022
Permit issued — Sprinklers
B00686497-S1-EW-SP
11/29/2022
Permit issued — Plumbing
B00686497-S1-PL
11/08/2022
Violation issued (ECB, closed)
Construction
11/08/2022
Violation issued (ECB, closed)
Construction
10/26/2022
Permit issued — Mechanical Systems
B00686497-S2-MS
10/26/2022
Permit issued — Structural
B00790960-I1-ST
10/24/2022
Permit issued — General Construction
B00686497-I1-GC
09/26/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/26/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/26/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/26/2022
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/26/2022
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
09/26/2022
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/26/2022
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/26/2022
Special inspection requirement — Metering
FAHAD FATEH
09/26/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/26/2022
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/22/2022
Objection resolved — Addressed
09/20/2022
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING TWO (2) FAMILY WITH A COMMERCIAL RETAIL STORE INTO A NINE (9) CLASS 'A' DWELLING UNITS WITH A COMMERCIAL RETAIL STORE, NO CHANGE TO BULK AND EGRESS.
B00686497-P1
09/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
09/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/16/2022
Special inspection requirement — Energy Code Compliance Inspections
09/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
09/16/2022
Special inspection requirement — Fenestration areas
09/16/2022
Special inspection requirement — Fenestration air leakage
09/16/2022
Special inspection requirement — Air barrier - visual inspection
09/16/2022
Special inspection requirement — Interior lighting power
09/16/2022
Special inspection requirement — Lighting in dwelling units
09/16/2022
Special inspection requirement — Metering
09/08/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Structural
09/05/2022
Objection resolved — Addressed
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/14/2022
DOB NOWPlumbingSigned-offYG SERVICES INC11/29/2022
DOB NOWMechanical SystemsSigned-offJRM DEVELOPMENT LLC10/26/2022
DOB NOWStructuralSigned-offJRM DEVELOPMENT LLC10/26/2022
DOB NOWGeneral ConstructionPermit IssuedJRM DEVELOPMENT LLC10/24/2022
1 project · most recent 05/29/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/29/2023Signed-offJRM DEVELOPMENT LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXS12LVJU 14,400 BTU · Split System ×5
RXS18LVJU 21,600 BTU · Split System ×3
RXSQ24TAVJU 25,800 BTU · Vrf Outdoor ×3
1 project · most recent 05/29/2023
Sprinkler System
FiledStatusContractorScope
05/29/2023Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 05/29/2023
Storm Water/Sanitary
FiledStatusContractorScope
05/29/2023Signed-offYG SERVICES INCStorm, Water/Sanitary
2 projects · most recent 06/20/2023
General Wiring
FiledStatusContractorScope
06/20/2023CompleteAMERICAN POWER ELECT CONSGeneral Wiring
11/28/2022CompleteAMERICAN POWER ELECT CONSGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/05/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/22/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/16/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
06/08/2023Sprinkler SystemsFAHAD FATEHspecial
06/08/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/08/2023Post-installed AnchorsFAHAD FATEHspecial
06/08/2023Seismic Isolation SystemsFAHAD FATEHspecial
06/08/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
06/08/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/08/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/08/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
09/26/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/26/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
09/26/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/26/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/26/2022Interior lighting powerFAHAD FATEHenergy_progress
09/26/2022Lighting in dwelling unitsFAHAD FATEHenergy_progress
09/26/2022Fenestration areasFAHAD FATEHenergy_progress
09/26/2022Fenestration air leakageFAHAD FATEHenergy_progress
09/26/2022MeteringFAHAD FATEHenergy_progress
09/26/2022Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/26/2022Air barrier - visual inspectionFAHAD FATEHenergy_progress
09/16/2022Fenestration and door U-factor and product ratings—energy_progress
09/16/2022Fire-Resistant Penetrations and Joints—special
09/16/2022Structural Stability – Alterations of existing buildings—special
09/16/2022Energy Code Compliance Inspections—progress
09/16/2022Fire-Resistance Rated Construction—progress
09/16/2022Fenestration areas—energy_progress
Latest 25 of 42.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00541004-I1Request digital key ↗
08/28/2026B00686497-P1Request digital key ↗
08/28/2026B00790960-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00686497-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00541004-I1Open ↗
08/13/2026B00790960-I1Open ↗
08/13/2026B00686497-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B00686497-I1Open ↗
09/02/2026B00686497-I1Open ↗
09/01/2026B00790960-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00686497-I1Open ↗
09/01/2026B00790960-I1Open ↗
09/01/2026B00686497-S2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00686497-I1Open ↗
08/13/2026B00686497-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00686497-P1Open ↗
08/13/2026B00686497-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00686497-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/13/2026B00686497-I1Open ↗
08/13/2026B00686497-P1Open ↗