Primarily 2 family with 1 store or office
Muslim Community Center
1099 CONEY ISLAND AVENUE · Name © OpenStreetMap contributors · Flatbush (West)-Ditmas Park-Parkville · BIN 3178909
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6AZoning
3,900 sfGross Floor Area
3Units
18 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: PALLASIDE ARCADE INC · 2,103 sf lot · 1.85 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 110p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
Filed — no permit issued1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ADAM BUILDER203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/07/2021$1.5M—Private party → PALLASIDE ARCADE INC$385/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRACE ENGINEERING PLLC.1003/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREEN CONSTRUCTION GROUPGeneral Contractor403/21/2026
ROOPCHAND SINGHElectrical103/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637603/01/2024
GRACE ENGINEERING PLLC.2176811/28/2023
Building Lifecycle
All (80)Filed (10)Permit Issued (3)Signed Off (1)Violation (33)Inspection (3)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/23/2025
Violation issued (FDNY_NOV, closed)
04/23/2025
Violation issued (FDNY_NOV, closed)
04/18/2025
Violation issued (FDNY_NOV, closed)
09/20/2024
Signed off — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-I1
03/11/2024
Violation issued (FDNY_NOV, closed)
03/01/2024
Filed — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-P8
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
03/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
TARIQ SIDDIQUI
03/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
03/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
03/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
02/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
02/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
02/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
02/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
02/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
11/28/2023
Filed — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-P7
11/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
TARIQ SIDDIQUI
11/28/2023
Special inspection requirement — Mechanical Systems
TARIQ SIDDIQUI
11/28/2023
Special inspection requirement — Final
TARIQ SIDDIQUI
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
11/28/2023
Special inspection requirement — Lighting controls
TARIQ SIDDIQUI
11/28/2023
Special inspection requirement — Interior lighting power
TARIQ SIDDIQUI
11/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
TARIQ SIDDIQUI
11/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
TARIQ SIDDIQUI
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
11/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
11/27/2023
Special inspection requirement — Mechanical Systems
TARIQ SIDDIQUI
11/27/2023
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
11/27/2023
Special inspection requirement — Final
TARIQ SIDDIQUI
11/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
TARIQ SIDDIQUI
11/27/2023
Special inspection requirement — Lighting controls
TARIQ SIDDIQUI
11/27/2023
Special inspection requirement — Interior lighting power
TARIQ SIDDIQUI
11/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
TARIQ SIDDIQUI
11/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2023
Filed — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-P5
10/17/2023
Filed — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-P2
10/12/2023
Filed — Alteration
Replace existing restaurant kitchen and plumbing fixtures, Replace hot water heater as per drawings.
B00934426-I1
10/12/2023
Filed — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-P4
09/20/2023
Filed — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-P3
09/19/2023
Permit issued — General Construction
B08026791-I1-GC-CX
09/15/2023
Filed — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-P1
07/20/2023
Permit issued — Plumbing
B08026791-S1-PL
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/31/2023
Permit issued — General Construction
B08026791-I1-GC-CX
11/18/2022
Filed — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-S1
11/08/2022
Filed — Alteration
Interior renovation of the restaurant on the first floor. Install type-1 exhaust hood. Replace existing floor tiles and ceiling as per drawings. Ansul system has been filed under a separate application. No change in egress, use, or occupancy.
B08026791-I1
12/06/2013
Violation issued (ECB, closed)
Boilers
12/06/2013
Violation issued (ECB, closed)
Boilers
06/18/2013
Violation issued (HPD, open)
B
06/18/2013
Violation issued (HPD, open)
B
06/18/2013
Violation issued (HPD, open)
B
06/18/2013
Violation issued (HPD, open)
B
06/18/2013
Violation issued (HPD, closed)
C
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGREEN CONSTRUCTION GROUP09/19/2023
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG07/20/2023
DOB NOWGeneral ConstructionSigned-offGREEN CONSTRUCTION GROUP05/31/2023
BISOTISSUEDM B CONSTRUCTING INC.08/20/2007
1 project · most recent 03/01/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/01/2024Signed-offGREEN CONSTRUCTION GROUPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-GS36NA-U1 36,000 BTU · Split System ×10
MUZ-GS36NA-U1 36,000 BTU · Condensing Unit ×6
Ventilation
Dayton 8-b4253b2001 400 CFM · Kitchen Exhaust ×1
__Junk__ DRYER VENT 1 BTU ×3
HOT WATER HEATER VENT 1 BTU · Water Heater ×3
2 projects · most recent 03/01/2024
Gas Water/Sanitary
FiledStatusContractorScope
03/01/2024Signed-offJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
10/12/2023——Gas, Water/Sanitary
1 project · most recent 07/25/2023
General Wiring
FiledStatusContractorScope
07/25/2023CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
03/01/2024Energy Code Compliance InspectionsRobert Truskoskyprogress
03/01/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
03/01/2024Tenant Protection Plan ComplianceTARIQ SIDDIQUIspecial
03/01/2024HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
03/01/2024HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
03/01/2024HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
02/29/2024Energy Code Compliance InspectionsRobert Truskoskyprogress
02/29/2024Tenant Protection Plan Compliance—special
02/29/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
02/29/2024HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
02/29/2024HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
02/29/2024HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
11/28/2023Tenant Protection Plan ComplianceTARIQ SIDDIQUIspecial
11/28/2023Mechanical SystemsTARIQ SIDDIQUIspecial
11/28/2023FinalTARIQ SIDDIQUIprogress
11/28/2023Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
11/28/2023Lighting controlsTARIQ SIDDIQUIenergy_progress
11/28/2023Interior lighting powerTARIQ SIDDIQUIenergy_progress
11/28/2023HVAC-R and service water heating system controlsTARIQ SIDDIQUIenergy_progress
11/28/2023HVAC-R and service water heating equipmentTARIQ SIDDIQUIenergy_progress
11/28/2023Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
11/27/2023Tenant Protection Plan Compliance—special
11/27/2023Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
11/27/2023Mechanical SystemsTARIQ SIDDIQUIspecial
11/27/2023Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
Latest 25 of 57.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B08026791-S1Request digital key ↗
08/28/2026B08026791-P8Request digital key ↗
08/28/2026B08026791-P7Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature38
09/02/2026B08026791-I1Open ↗
09/02/2026B08026791-I1Open ↗
09/02/2026B08026791-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026B08026791-I1Open ↗
09/02/2026B08026791-I1Open ↗
09/02/2026B08026791-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B08026791-P8Open ↗
08/28/2026B08026791-P7Open ↗
08/28/2026B08026791-P5Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026B08026791-P8Open ↗
08/28/2026B08026791-P7Open ↗
08/28/2026B08026791-P5Open ↗
Showing 3 of 10 on file for this type