Two family frame
11-04 NAMEOKE STREET
QUEENS · Far Rockaway-Bayswater · BIN 4298006
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R3XZoning
2,160 sfGross Floor Area
2Units
Two family frame · 3,089 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. PEROTTO ASSOCIATES210/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G PEROTTO ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL DAY PLUMBING & HEATINGPlumbing107/08/2026
Building Lifecycle
All (10)Filed (2)Permit Issued (1)Signed Off (1)Inspection (3)Special Inspection (3)
12/05/2022
Signed off — Alteration
Legailze the installation of two boilers, two hot water heaters and gas piping to boilers, hot water and existing domestic ranges.
Q08005936-I1
10/26/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/15/2022
Filed — Alteration
Legailze the installation of two boilers, two hot water heaters and gas piping to boilers, hot water and existing domestic ranges.
Q08005936-S1
10/13/2022
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/06/2022
Permit issued — Plumbing
Q08005936-I1-PL
09/26/2022
Filed — Alteration
Legailze the installation of two boilers, two hot water heaters and gas piping to boilers, hot water and existing domestic ranges.
Q08005936-I1
09/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
George Perotto
09/26/2022
Special inspection requirement — Maintenance information
George Perotto
09/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
George Perotto
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL DAY PLUMBING & HEATIN10/06/2022
1 project · most recent 10/15/2022
Gas
FiledStatusContractorScope
10/15/2022Signed-offALL DAY PLUMBING & HEATINGas
1 project · most recent 07/01/2022
FiledStatusContractorScope
07/01/2022Permit IssuedCROSSLAND MANAGEMENT & E2 meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/13/2022No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/26/2022HVAC-R and service water heating equipmentGeorge Perottoenergy_progress
09/26/2022Maintenance informationGeorge Perottoenergy_progress
09/26/2022HVAC-R and service water heating system controlsGeorge Perottoenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q08005936-S1Request digital key ↗
08/25/2026Q08005936-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q08005936-I1Open ↗
08/25/2026Q08005936-I1Open ↗
08/25/2026Q08005936-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q08005936-S1Open ↗
08/25/2026Q08005936-I1Open ↗