← Back
Three families
11-15 30 DRIVE
QUEENS · BIN 4005481
💬 Discuss this project
1935Year Built
2Stories
C0Building Class
R5BZoning
2,440 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations ▸
Three families · Owner of record: 1115 30TH DRIVE LLC · 2,709 sf lot · 0.9 FAR built · Flood zone AE
Locations of Work
ElectricalPlumbing
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1115 30TH DRIVE LLC103/22/2026
1115 30TH DR,LLC503/22/2026
1115 3TH DR LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2016$1.3M—Private party → Private party$523/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KORMAN DESIGN & BUILD608/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KENNY LEE ARCHITECT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & M PIPING AND HEATINGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KORMAN DESIGN & BUILD2055608/03/2022
Building Lifecycle
All (54)Filed (6)Permit Issued (2)Signed Off (1)Violation (26)Objection (2)Special Inspection (17)
05/06/2026
Violation issued (HPD, open)
A
06/11/2025
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, closed)
I
04/12/2024
Violation issued (HPD, open)
A
03/27/2023
Violation issued (HPD, open)
A
11/15/2022
Violation issued (HPD, closed)
I
10/11/2022
Signed off — Alteration
INSTALLATION OF NEW GAS METER, GAS BOILER, GAS H.W. HEATER WITH REMOVING EXIST OIL BOILER, OIL TANK, AND GAS H.W. HEATER.
Q00472757-I1
08/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID UH
08/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
DAVID UH
08/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
DAVID UH
08/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DAVID UH
08/05/2022
Special inspection requirement — Energy Code Compliance Inspections
DAVID UH
08/03/2022
Filed — Alteration
INSTALLATION OF NEW GAS METER, GAS BOILER, GAS H.W. HEATER WITH REMOVING EXIST OIL BOILER, OIL TANK, AND GAS H.W. HEATER.
Q00472757-P5
07/22/2022
Permit issued — Plumbing
Q00472757-I1-PL
06/30/2022
Filed — Alteration
INSTALLATION OF NEW GAS METER, GAS BOILER, GAS H.W. HEATER WITH REMOVING EXIST OIL BOILER, OIL TANK, AND GAS H.W. HEATER.
Q00472757-P4
06/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
DAVID UH
06/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID UH
06/27/2022
Special inspection requirement — Energy Code Compliance Inspections
DAVID UH
06/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
DAVID UH
06/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DAVID UH
06/21/2022
Filed — Alteration
INSTALLATION OF NEW GAS METER, GAS BOILER, GAS H.W. HEATER WITH REMOVING EXIST OIL BOILER, OIL TANK, AND GAS H.W. HEATER.
Q00472757-P3
05/20/2022
Objection resolved — Addressed
05/13/2022
Objection raised — Structural
05/11/2022
Filed — Alteration
INSTALLATION OF NEW GAS METER, GAS BOILER, GAS H.W. HEATER WITH REMOVING EXIST OIL BOILER, OIL TANK, AND GAS H.W. HEATER.
Q00472757-P2
05/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID UH
05/11/2022
Special inspection requirement — Energy Code Compliance Inspections
DAVID UH
03/03/2022
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, open)
A
05/26/2021
Filed — Alteration
INSTALLATION OF NEW GAS METER, GAS BOILER, GAS H.W. HEATER WITH REMOVING EXIST OIL BOILER, OIL TANK, AND GAS H.W. HEATER.
Q00472757-P1
05/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID UH
05/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
DAVID UH
05/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
DAVID UH
05/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
DAVID UH
05/20/2021
Special inspection requirement — Energy Code Compliance Inspections
DAVID UH
04/14/2021
Violation issued (HPD, closed)
I
04/14/2021
Violation issued (HPD, open)
A
04/10/2021
Permit issued — Plumbing
Q00472757-I1-PL
02/24/2021
Filed — Alteration
INSTALLATION OF NEW GAS METER, GAS BOILER, GAS H.W. HEATER WITH REMOVING EXIST OIL BOILER, OIL TANK, AND GAS H.W. HEATER.
Q00472757-I1
10/13/2020
Violation issued (HPD, open)
C
10/13/2020
Violation issued (HPD, open)
C
10/13/2020
Violation issued (HPD, open)
C
10/31/2019
Violation issued (HPD, closed)
I
10/22/2018
Violation issued (HPD, closed)
I
11/30/2017
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/25/2017
Violation issued (ECB, closed)
Construction
08/25/2017
Violation issued (ECB, closed)
Construction
08/25/2017
Violation issued (ECB, closed)
Quality of Life
08/25/2017
Violation issued (ECB, closed)
Plumbing
08/25/2017
Violation issued (ECB, closed)
Construction
08/25/2017
Violation issued (ECB, closed)
Quality of Life
11/16/2016
Violation issued (HPD, closed)
I
04/05/2006
Violation issued (HPD, closed)
C
08/21/1997
Violation issued (ECB, closed)
HPD
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING07/22/2022
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING04/10/2021
BISPLISSUEDTOP DOG PLBG & HTG CORP06/25/2018
BISOTISSUEDG.M. CONSTRUCTION & WATERPROOF05/30/2018
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
08/05/2022Fire-Resistant Penetrations and JointsDAVID UHspecial
08/05/2022HVAC-R and service water heating equipmentDAVID UHenergy_progress
08/05/2022HVAC-R and service water heating system controlsDAVID UHenergy_progress
08/05/2022HVAC-R and service water piping design and insulationDAVID UHenergy_progress
08/05/2022Energy Code Compliance InspectionsDAVID UHprogress
06/27/2022HVAC-R and service water heating equipmentDAVID UHenergy_progress
06/27/2022Fire-Resistant Penetrations and JointsDAVID UHspecial
06/27/2022Energy Code Compliance InspectionsDAVID UHprogress
06/27/2022HVAC-R and service water heating system controlsDAVID UHenergy_progress
06/27/2022HVAC-R and service water piping design and insulationDAVID UHenergy_progress
05/11/2022Fire-Resistant Penetrations and JointsDAVID UHspecial
05/11/2022Energy Code Compliance InspectionsDAVID UHprogress
05/20/2021Fire-Resistant Penetrations and JointsDAVID UHspecial
05/20/2021HVAC-R and service water heating equipmentDAVID UHenergy_progress
05/20/2021HVAC-R and service water heating system controlsDAVID UHenergy_progress
05/20/2021HVAC-R and service water piping design and insulationDAVID UHenergy_progress
05/20/2021Energy Code Compliance InspectionsDAVID UHprogress
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing6
08/27/2026Q00472757-P3Request digital key ↗
08/27/2026Q00472757-I1Request digital key ↗
08/27/2026Q00472757-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION2
07/02/2018421600690Open ↗
06/14/2018421600690Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
01/15/2019421600690Open ↗
02/08/2018421600690Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/19/2019421600690Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026Q00472757-P1Open ↗
09/01/2026Q00472757-P1Open ↗
09/01/2026Q00472757-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00472757-P3Open ↗
08/27/2026Q00472757-P2Open ↗
08/27/2026Q00472757-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00472757-P1Open ↗
09/01/2026Q00472757-P4Open ↗
09/01/2026Q00472757-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/09/2018421600690Open ↗
02/08/2018421600690Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/08/2018421600690Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/08/2018421600690Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00472757-P3Open ↗
08/27/2026Q00472757-P1Open ↗
08/27/2026Q00472757-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/08/2018421600690Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/19/2019421600690Open ↗
03/19/2019421600690Open ↗
02/08/2018421600690Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/19/2019421600690Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00472757-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/19/2019421600690Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/19/2019421600690Open ↗
02/08/2018421600690Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
02/08/2018421600690Open ↗
▸BISADDITIONAL INFORMATION1
01/05/2019421600690Open ↗
▸BISBOROUGH INTAKE FORM1
01/15/2019421600690Open ↗