1941Year Built
2Stories
Y1Building Class
R5DZoning
7,300 sfGross Floor Area
1Units
2 Active Violations 0 unresolved · 2 paperwork only 1 likely answered ▸
Fire Department · Owner of record: Fire Department of New York · 5,000 sf lot · 1.46 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFire Department of the City of New York1 filing · 9 docs
Floor 1FDNY Engine Company 260, Fire Department of the City of New Under Construction35p · 7 filings · 15 docs
CellarFDNY Engine Company 260, Fire Department of the City of New Under Construction22p · 7 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fire Department of the City of New York3108/08/2026
NYC Department of Design and Construction403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering902/19/2026
G. Switzer Architecture, PC (Gsapc)202/19/2026
BKH Architect112/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Noel Building Consulting2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZHL GroupGeneral Contractor408/08/2026
Crescent ContractingPlumbing207/08/2026
Franco Belli PLMG & Heating SonPlumbing207/08/2026
Ashnu InternationalGeneral Contractor107/08/2026
Crescent ContractingGeneral Contractor107/08/2026
Pasquale QuaratinoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlas ATC Engineering8011802/19/2026
Lozier7221302/01/2022
Building Lifecycle
All (100)Filed (12)Permit Issued (11)Signed Off (1)Violation (6)Inspection (9)Objection (36)Special Inspection (25)
08/20/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/10/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/07/2026
Permit issued — General Construction
Q01001082-I1-GC-CX
08/06/2026
Permit issued — General Construction
Q00935948-I1-GC
07/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/21/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
03/03/2026
Special inspection requirement — Final
RONALD GRAPIN
02/19/2026
Filed — Alteration
Q00935948-P1
02/19/2026
Filed — Alteration
Q00960029-P1
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
02/04/2026
Special inspection requirement — Final
RONALD GRAPIN
01/15/2026
Permit issued — Boiler Equipment
Q00946892-I1-BE
01/12/2026
Permit issued — General Construction
Q00935948-I1-GC
12/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/11/2025
Permit issued — Boiler Equipment
Q00946892-I1-BE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/03/2025
Permit issued — Structural
Q01001082-I1-GC-CX
10/01/2025
Permit issued — Plumbing
Q00936011-I1-PL
09/26/2025
Permit issued — Mechanical Systems
Q00936002-I1-MS
09/23/2024
Permit issued — Plumbing
Q00648096-I1-PL
04/17/2024
Permit issued — Structural
Q00670994-I1-ST
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/14/2024
Objection resolved — Addressed
03/12/2024
Objection raised — Scope
03/12/2024
Objection raised — Energy
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/05/2024
Filed — Alteration
Q00935948-I1
02/27/2024
Objection raised — Admin
02/27/2024
Objection raised — Inspections
02/27/2024
Objection raised — Scope
02/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
RONALD GRAPIN
02/19/2024
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
02/15/2024
Filed — Alteration
STRUCTURAL WORK WILL BE PERFORMED ON THE EXISTING FIREHOUSE. A NEW FLOOR SLAB WILL BE REMOVED AND INSTALLED ON A PORTION OF THE FIRST FLOOR AND CELLAR AS PLANS. NO CHANGE OF USE OR EGRESS WILL BE UNDER THIS APPLICATION.
Q01001082-I1
02/15/2024
Objection raised — Other
02/15/2024
Objection raised — Other
02/14/2024
Objection raised — Admin
02/14/2024
Objection raised — Energy
02/12/2024
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND CHIMNEY LINER AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLATION. NOTE FIRE HOUSE EC 260
Q00936002-I1
02/12/2024
Filed — Alteration
Q00936011-I1
02/12/2024
Filed — Alteration
Q00960029-I1
02/12/2024
Filed — Alteration
Replacement of Boiler. No change of use, egress or occupancy under this application
Q00946892-I1
02/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
02/09/2024
Special inspection requirement — Heating Systems
RONALD GRAPIN
02/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
02/09/2024
Special inspection requirement — Shutoff dampers
RONALD GRAPIN
02/09/2024
Special inspection requirement — Ventilation and air distribution system
RONALD GRAPIN
02/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
02/09/2024
Special inspection requirement — Maintenance information
RONALD GRAPIN
09/19/2023
Special inspection requirement — Final
RONALD GRAPIN
09/19/2023
Special inspection requirement — Mechanical Systems
RONALD GRAPIN
12/14/2022
Special inspection requirement — Concrete - Cast-In-Place
ANDRE CELESTIN
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZHL Group08/07/2026
DOB NOWGeneral ConstructionPermit IssuedZHL Group08/06/2026
DOB NOWBoiler EquipmentPermit IssuedCrescent Contracting01/15/2026
DOB NOWGeneral ConstructionPermit IssuedZHL Group01/12/2026
DOB NOWBoiler EquipmentPermit IssuedCrescent Contracting12/11/2025
DOB NOWStructuralPermit IssuedZHL Group10/03/2025
DOB NOWPlumbingPermit IssuedFranco Belli PLMG & Heating Son10/01/2025
DOB NOWMechanical SystemsPermit IssuedCrescent Contracting09/26/2025
DOB NOWPlumbingPermit IssuedFranco Belli PLMG & Heating Son09/23/2024
DOB NOWStructuralPermit IssuedErnest Kuriqi04/17/2024
DOB NOWPlumbingSigned-offPasquale Quaratino12/29/2021
BISOTISSUEDRDS Industries09/30/2021
BISOTISSUEDZHL Group03/13/2012
BISMHISSUEDZHL Group03/13/2012
BISPLISSUEDC James Plumbing & Heating02/16/2012
BISOTISSUEDZHL Group02/01/2012
BISMHISSUEDZHL Group02/01/2012
BISEQISSUEDBilly Contractors01/04/2007
BISEQISSUEDL&B Construction08/04/2003
BISFPISSUEDMaster Fire Systems06/21/2000
BISOTISSUEDState Environment Services03/10/1998
BISPLISSUEDAquaduct Plumbing & Heating & Gas07/22/1996
BISMHISSUEDS.a.hvac07/22/1996
BISPLISSUEDMetropolitan Heat & Power Co06/14/1995
1 project · most recent 01/28/2022
Gas
FiledStatusContractorScope
01/28/2022Permit IssuedFranco Belli PLMG & Heating SonGas
2 projects · most recent 10/14/2025
General Wiring
FiledStatusContractorScope
10/14/2025Permit IssuedPolaris Electrical ConstructionGeneral Wiring
12/16/2020CompleteRDS Electric CoGeneral Wiring
2 projects · most recent 02/15/2024
Concrete Steel Masonry
FiledStatusContractorScope
02/15/2024Permit IssuedZHL GroupSteel, Concrete, Masonry
02/01/2022Permit IssuedAshnu InternationalConcrete
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/10/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/12/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/30/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/30/2022Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/03/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
03/03/2026FinalRONALD GRAPINprogress
02/04/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
02/04/2026FinalRONALD GRAPINprogress
02/19/2024Duct leakage testing, insulation and designRONALD GRAPINenergy_progress
02/19/2024Energy Code Compliance InspectionsRONALD GRAPINprogress
02/09/2024HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
02/09/2024Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
02/09/2024Heating SystemsRONALD GRAPINspecial
02/09/2024HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
02/09/2024Shutoff dampersRONALD GRAPINenergy_progress
02/09/2024Ventilation and air distribution systemRONALD GRAPINenergy_progress
02/09/2024HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
02/09/2024Maintenance informationRONALD GRAPINenergy_progress
09/19/2023FinalRONALD GRAPINprogress
09/19/2023Mechanical SystemsRONALD GRAPINspecial
12/14/2022Concrete - Cast-In-PlaceANDRE CELESTINspecial
01/28/2022Fire-Resistant Penetrations and JointsANDRE CELESTINspecial
01/28/2022FinalANDRE CELESTINprogress
01/28/2022Chimneys and ventsANDRE CELESTINspecial
01/28/2022Emergency and Standby Power Systems (Generator)ANDRE CELESTINspecial
01/28/2022Post-installed AnchorsANDRE CELESTINspecial
12/22/2021Fire-Resistant Penetrations and JointsANDRE CELESTINspecial
12/14/2021Mechanical SystemsANDRE CELESTINspecial
12/14/2021FinalANDRE CELESTINprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
FDNY Engine Company 260Government / CivicCellar, Floor 1
Project Q01001082 Alteration · Permit Entire · 02/15/2024
Project Q00936002 Alteration · Permit Entire · 02/12/2024
Project Q00936011 Alteration · Permit Entire · 02/12/2024
Project Q00946892 Alteration · Permit Entire · 02/12/2024
Project Q00960029 Alteration · Approved · 02/12/2024
Project Q00670994 Alteration · Permit Entire · 02/01/2022
Project Q00645554 Alteration · LOC Issued · 12/20/2021
Fire Department of the City of New YorkGovernment / CivicFloor 1, Roof
Project Q00648093 Alteration · Approved · 01/28/2022
Project Q00935948 Alteration · Permit Entire · 03/05/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/26/2026Q00645554-I1Request digital key ↗
08/26/2026Q00648093-I1Request digital key ↗
08/23/2026Q00936011-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION6
09/30/2021440659093Open ↗
03/15/2012420485497Open ↗
03/15/2012420485497Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
09/02/2021440659093Open ↗
09/27/2011420485497Open ↗
09/27/2011420485497Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026Q00670994-I1Open ↗
08/23/2026Q00936011-I1Open ↗
08/23/2026Q00946892-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00648096-I1Open ↗
08/31/2026Q00936002-I1Open ↗
08/29/2026Q00960029-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026Q00936002-I1Open ↗
08/31/2026Q00936002-I1Open ↗
08/29/2026Q00960029-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/23/2012420485497Open ↗
02/02/2012420485497Open ↗
09/27/2011420485497Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/02/2021440659093Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/27/2011420485497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/02/2021440659093Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/27/2011420485497Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/02/2021440659093Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
07/31/2012420485497Open ↗
07/31/2012420485497Open ↗
03/28/2012420485497Open ↗
▸BISSCHEDULE B - PLUMBING1
09/27/2011420485497Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/02/2021440659093Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/23/2026Q00936011-I1Open ↗
08/23/2026Q00946892-I1Open ↗
08/17/2026Q00935948-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026Q00670994-I1Open ↗
08/13/2026Q00645554-I1Open ↗
08/13/2026Q00648096-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS-WORK UNDET 1000 SQ FT (DEP ACP7)1
09/27/2011420485497Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/02/2021440659093Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/17/2023440659093Open ↗
01/12/2023440659093Open ↗
09/24/2021440659093Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
10/23/2012420485497Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/17/2023440659093Open ↗
▸BISNYCECC ANALYSIS1
09/02/2021440659093Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/27/2011420485497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/02/2021440659093Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/25/2012420485497Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/17/2023440659093Open ↗
01/12/2023440659093Open ↗
09/24/2021440659093Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/23/2026Q00936011-I1Open ↗
08/17/2026Q00935948-I1Open ↗
08/17/2026Q00935948-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026Q00670994-I1Open ↗
08/13/2026Q00648096-I1Open ↗
08/13/2026Q00648093-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/18/2023440659093Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
09/02/2021440659093Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/27/2011420485497Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
01/17/2023440659093Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
09/02/2021440659093Open ↗
10/23/2012420485497Open ↗
09/27/2011420485497Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/17/2023440659093Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
09/27/2011420485497Open ↗
09/27/2011420485497Open ↗
▸BISADDITIONAL INFORMATION1
04/11/2012420485497Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/02/2021440659093Open ↗