Fire Department
11-17 37 AVENUE
QUEENS · BIN 4004305
💬 Discuss this project
1941Year Built
2Stories
Y1Building Class
R5DZoning
7,300 sfGross Floor Area
1Units
3 Open Violations 1 unresolved · 2 paperwork only ▸
Fire Department · Owner of record: FIRE DEPARTMENT OF NEW YORK · 5,000 sf lot · 1.46 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 10 docs
Floor 1Under Construction39p · 7 filings · 20 docs
CellarUnder Construction20p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FDNY2208/08/2026
FDNY 057203/22/2026
FDNY NEW YORK CITY203/21/2026
NYC DEPT OF DESIGN CONSTRUCT303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CAMERON ENGINEERING902/19/2026
G. SWITZER ARCHITECTURE, PC (GSAPC)202/19/2026
BKH ARCHITECT, PLLC112/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZHL GROUP INCGeneral Contractor408/08/2026
CRESCENT CONTRACTING CORPPlumbing207/08/2026
FRANCO BELLI PLMG&HTG SONPlumbing207/08/2026
ASHNU INTERNATIONAL INCGeneral Contractor107/08/2026
CRESCENT CONTRACTING CORPGeneral Contractor107/08/2026
PASQUALE QUARATINO INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC8011802/19/2026
LOZIER INC.7221302/01/2022
Building Lifecycle
All (103)Filed (12)Permit Issued (11)Signed Off (1)Violation (6)Inspection (12)Objection (36)Special Inspection (25)
08/20/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/10/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/07/2026
Permit issued — General Construction
Q01001082-I1-GC-CX
08/06/2026
Permit issued — General Construction
Q00935948-I1-GC
07/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/21/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
03/03/2026
Special inspection requirement — Final
RONALD GRAPIN
02/19/2026
Filed — Alteration
Q00935948-P1
02/19/2026
Filed — Alteration
Q00960029-P1
02/04/2026
Special inspection requirement — Final
RONALD GRAPIN
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
01/15/2026
Permit issued — Boiler Equipment
Q00946892-I1-BE
01/12/2026
Permit issued — General Construction
Q00935948-I1-GC
01/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/11/2025
Permit issued — Boiler Equipment
Q00946892-I1-BE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/06/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/03/2025
Permit issued — Structural
Q01001082-I1-GC-CX
10/01/2025
Permit issued — Plumbing
Q00936011-I1-PL
09/26/2025
Permit issued — Mechanical Systems
Q00936002-I1-MS
09/23/2024
Permit issued — Plumbing
Q00648096-I1-PL
04/17/2024
Permit issued — Structural
Q00670994-I1-ST
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/14/2024
Objection resolved — Addressed
03/12/2024
Objection raised — Scope
03/12/2024
Objection raised — Energy
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/05/2024
Filed — Alteration
Q00935948-I1
02/27/2024
Objection raised — Scope
02/27/2024
Objection raised — Inspections
02/27/2024
Objection raised — Admin
02/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
RONALD GRAPIN
02/19/2024
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
02/15/2024
Filed — Alteration
STRUCTURAL WORK WILL BE PERFORMED ON THE EXISTING FIREHOUSE. A NEW FLOOR SLAB WILL BE REMOVED AND INSTALLED ON A PORTION OF THE FIRST FLOOR AND CELLAR AS PLANS. NO CHANGE OF USE OR EGRESS WILL BE UNDER THIS APPLICATION.
Q01001082-I1
02/15/2024
Objection raised — Other
02/15/2024
Objection raised — Other
02/14/2024
Objection raised — Admin
02/14/2024
Objection raised — Energy
02/12/2024
Filed — Alteration
Q00936011-I1
02/12/2024
Filed — Alteration
Replacement of Boiler. No change of use, egress or occupancy under this application
Q00946892-I1
02/12/2024
Filed — Alteration
Q00960029-I1
02/12/2024
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND CHIMNEY LINER AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLATION. NOTE FIRE HOUSE EC 260
Q00936002-I1
02/09/2024
Special inspection requirement — Ventilation and air distribution system
RONALD GRAPIN
02/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
02/09/2024
Special inspection requirement — Heating Systems
RONALD GRAPIN
02/09/2024
Special inspection requirement — Maintenance information
RONALD GRAPIN
02/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
02/09/2024
Special inspection requirement — Shutoff dampers
RONALD GRAPIN
02/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZHL GROUP INC08/07/2026
DOB NOWGeneral ConstructionPermit IssuedZHL GROUP INC08/06/2026
DOB NOWBoiler EquipmentPermit IssuedCRESCENT CONTRACTING CORP01/15/2026
DOB NOWGeneral ConstructionPermit IssuedZHL GROUP INC01/12/2026
DOB NOWBoiler EquipmentPermit IssuedCRESCENT CONTRACTING CORP12/11/2025
DOB NOWStructuralPermit IssuedZHL GROUP INC10/03/2025
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON10/01/2025
DOB NOWMechanical SystemsPermit IssuedCRESCENT CONTRACTING CORP09/26/2025
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON09/23/2024
DOB NOWStructuralPermit IssuedERNEST KURIQI04/17/2024
DOB NOWPlumbingSigned-offPASQUALE QUARATINO INC12/29/2021
BISOTISSUEDRDS INDUSTRIES INC09/30/2021
BISOTISSUEDZHL GROUP INC03/13/2012
BISMHISSUEDZHL GROUP INC03/13/2012
BISPLISSUEDC JAMES PLBG & HTG INC02/16/2012
BISOTISSUEDZHL GROUP INC02/01/2012
BISMHISSUEDZHL GROUP INC02/01/2012
BISEQISSUEDBILLY CONTRACTORS01/04/2007
BISEQISSUEDL&B CONSTRUCTION INC08/04/2003
BISFPISSUEDMASTER FIRE SYSTEMS, INC06/21/2000
BISOTISSUEDSTATE ENVIRONMENT SERVICES03/10/1998
BISPLISSUEDAQUADUCT PLUMBING HEATING & GAS07/22/1996
BISMHISSUEDS.A.HVAC , INC.07/22/1996
BISPLISSUEDMETROPOLITAN HEAT & POWER CO06/14/1995
1 project · most recent 01/28/2022
Gas
FiledStatusContractorScope
01/28/2022Permit IssuedFRANCO BELLI PLMG&HTG SONGas
2 projects · most recent 10/14/2025
General Wiring
FiledStatusContractorScope
10/14/2025Permit IssuedPOLARIS ELEC'L CONST CORPGeneral Wiring
12/16/2020CompleteRDS ELECTRIC CO., INCGeneral Wiring
2 projects · most recent 02/15/2024
Concrete Steel Masonry
FiledStatusContractorScope
02/15/2024Permit IssuedZHL GROUP INCSteel, Concrete, Masonry
02/01/2022Permit IssuedASHNU INTERNATIONAL INCConcrete
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/10/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/06/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/12/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/30/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/30/2022Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/03/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
03/03/2026FinalRONALD GRAPINprogress
02/04/2026FinalRONALD GRAPINprogress
02/04/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
02/19/2024Duct leakage testing, insulation and designRONALD GRAPINenergy_progress
02/19/2024Energy Code Compliance InspectionsRONALD GRAPINprogress
02/09/2024Ventilation and air distribution systemRONALD GRAPINenergy_progress
02/09/2024HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
02/09/2024Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
02/09/2024Heating SystemsRONALD GRAPINspecial
02/09/2024Maintenance informationRONALD GRAPINenergy_progress
02/09/2024HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
02/09/2024Shutoff dampersRONALD GRAPINenergy_progress
02/09/2024HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
09/19/2023FinalRONALD GRAPINprogress
09/19/2023Mechanical SystemsRONALD GRAPINspecial
12/14/2022Concrete - Cast-In-PlaceANDRE CELESTINspecial
01/28/2022Fire-Resistant Penetrations and JointsANDRE CELESTINspecial
01/28/2022FinalANDRE CELESTINprogress
01/28/2022Chimneys and ventsANDRE CELESTINspecial
01/28/2022Emergency and Standby Power Systems (Generator)ANDRE CELESTINspecial
01/28/2022Post-installed AnchorsANDRE CELESTINspecial
12/22/2021Fire-Resistant Penetrations and JointsANDRE CELESTINspecial
12/14/2021Mechanical SystemsANDRE CELESTINspecial
12/14/2021FinalANDRE CELESTINprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fdny Engine Company 260OtherCellar
Project Q00645554 Alteration · LOC Issued · 12/20/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/26/2026Q00645554-I1Request digital key ↗
08/26/2026Q00648093-I1Request digital key ↗
08/23/2026Q00936011-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION6
09/30/2021440659093Open ↗
03/15/2012420485497Open ↗
03/15/2012420485497Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
09/02/2021440659093Open ↗
09/27/2011420485497Open ↗
09/27/2011420485497Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026Q00670994-I1Open ↗
08/23/2026Q00936011-I1Open ↗
08/23/2026Q00946892-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00648096-I1Open ↗
08/31/2026Q00936002-I1Open ↗
08/29/2026Q00960029-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026Q00936002-I1Open ↗
08/31/2026Q00936002-I1Open ↗
08/29/2026Q00960029-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/23/2012420485497Open ↗
02/02/2012420485497Open ↗
09/27/2011420485497Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/02/2021440659093Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/27/2011420485497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/02/2021440659093Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/27/2011420485497Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/02/2021440659093Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
07/31/2012420485497Open ↗
07/31/2012420485497Open ↗
03/28/2012420485497Open ↗
▸BISSCHEDULE B - PLUMBING1
09/27/2011420485497Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/02/2021440659093Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/23/2026Q00936011-I1Open ↗
08/23/2026Q00946892-I1Open ↗
08/17/2026Q00935948-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026Q00670994-I1Open ↗
08/13/2026Q00645554-I1Open ↗
08/13/2026Q00648093-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS-WORK UNDET 1000 SQ FT (DEP ACP7)1
09/27/2011420485497Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/02/2021440659093Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/17/2023440659093Open ↗
01/12/2023440659093Open ↗
09/24/2021440659093Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
10/23/2012420485497Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/17/2023440659093Open ↗
▸BISNYCECC ANALYSIS1
09/02/2021440659093Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/27/2011420485497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/02/2021440659093Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/25/2012420485497Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/17/2023440659093Open ↗
01/12/2023440659093Open ↗
09/24/2021440659093Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/23/2026Q00936011-I1Open ↗
08/17/2026Q00935948-P1Open ↗
08/17/2026Q00935948-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026Q00670994-I1Open ↗
08/13/2026Q00648096-I1Open ↗
08/13/2026Q00648093-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/18/2023440659093Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
09/02/2021440659093Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/27/2011420485497Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
01/17/2023440659093Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
09/02/2021440659093Open ↗
10/23/2012420485497Open ↗
09/27/2011420485497Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/17/2023440659093Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
09/27/2011420485497Open ↗
09/27/2011420485497Open ↗
▸BISADDITIONAL INFORMATION1
04/11/2012420485497Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/02/2021440659093Open ↗