← Back
Elevator apt, fireproof without stores
11-24 31ST DRIVE
QUEENS · BIN 4624695
💬 Discuss this project
2023Year Built
—Stories
D3Building Class
R7AZoning
35,339 sfGross Floor Area
51Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 1111 BWAY LLC · 9,968 sf lot · 3.55 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof5p · 5 filings · 20 docs
Bulkhead1p · 3 filings · 20 docs
Floor 87p · 5 filings · 20 docs
Floor 77p · 5 filings · 20 docs
Floor 68p · 5 filings · 20 docs
Floor 58p · 5 filings · 20 docs
Floor 48p · 5 filings · 20 docs
Floor 38p · 5 filings · 20 docs
Floor 27p · 5 filings · 20 docs
Floor 14p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC TOP CONSTRUCTION6207/08/2026
OWNERS REP1507/08/2026
SUPERB CONSTRUCTION MGT703/22/2026
VIM REALTY103/21/2026
31-61 VERNON BLVD LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THE GREEN STUDIO203/21/2026
EXPRESS FILING INC2403/21/2026
AE DESIGN SOLUTION403/21/2026
MILLENNIUM DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC TOP CONSTRUCTION LLCGeneral Contractor3007/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor707/08/2026
GWT ENTERPRISES INCGeneral Contractor603/21/2026
PRIME PIPING & HEATING INFire Protection307/08/2026
N TECH DESIGN OF AMERICAGeneral Contractor303/21/2026
SUPERB CONSTRUCTION MGTGeneral Contractor107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616905/28/2024
Building Lifecycle
All (124)Filed (16)Permit Issued (26)Signed Off (10)Violation (13)Inspection (14)Objection (12)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
06/16/2025
Violation issued (HPD, closed)
A
12/04/2024
Signed off — Alteration
Q00456180-I1
10/02/2024
Signed off — Alteration
Q00456191-I1
09/17/2024
Signed off — Alteration
TEMPORARY STANDPIPE FILED IN CONJUNCTION WITH NB JOB #421133179
Q00528522-I1
09/10/2024
Signed off — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION # 421133179
Q00426908-I1
09/10/2024
Signed off — Alteration
SPRINKLER/STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #421133179
Q00426987-I1
09/10/2024
Signed off — Alteration
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #421133179
Q00426947-I1
09/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/05/2024
421-a(16) registration filed
09/03/2024
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
08/22/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00719391-I1
07/29/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
07/24/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2024
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
07/24/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/20/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/10/2024
Signed off — Alteration
Q00456186-I1
07/10/2024
Signed off — Alteration
construction fence filed in conjunction with NB application #421133179
Q00444186-I1
07/08/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/05/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
06/05/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
06/05/2024
Special inspection requirement — Final
FAHAD FATEH
06/05/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
06/05/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
06/05/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
06/05/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
05/28/2024
Filed — Alteration
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #421133179
Q00426947-P1
05/21/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/21/2024
Special inspection requirement — Standpipe Systems
FAHAD FATEH
05/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/15/2024
Filed — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION # 421133179
Q00426908-P1
05/10/2024
Filed — Alteration
SPRINKLER/STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #421133179
Q00426987-P1
05/09/2024
Special inspection requirement — Final
FAHAD FATEH
05/09/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
05/09/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
05/09/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
05/09/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
05/09/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
05/09/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/02/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/02/2024
Special inspection requirement — Standpipe Systems
FAHAD FATEH
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/18/2024
Permit issued — Sidewalk Shed
Q00719391-I1-SH
04/09/2024
Permit issued — Mechanical Systems
Q00426947-I1-MS
03/11/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENTSHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00881846-I1
02/06/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENTSHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00881846-P1
02/05/2024
Violation issued (ECB, closed)
Construction
02/05/2024
Violation issued (ECB, closed)
Construction
02/02/2024
Violation issued (ECB, closed)
Unknown
01/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/26/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
11/07/2023
Permit issued — Structural
Q00456191-I1-ST
11/07/2023
Permit issued — Construction Fence
Q00444186-I1-FN
11/07/2023
Permit issued — Foundation
Q00456180-I1-FO
09/04/2023
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
09/04/2023
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/18/2024
DOB NOWMechanical SystemsSigned-offNYC TOP CONSTRUCTION LLC04/09/2024
DOB NOWStructuralSigned-offNYC TOP CONSTRUCTION LLC11/07/2023
DOB NOWConstruction FenceSigned-offNYC TOP CONSTRUCTION LLC11/07/2023
DOB NOWFoundationSigned-offNYC TOP CONSTRUCTION LLC11/07/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC08/17/2023
DOB NOWSupport of ExcavationSigned-offNYC TOP CONSTRUCTION LLC07/26/2023
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC06/07/2023
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC06/07/2023
DOB NOWStructuralSigned-offNYC TOP CONSTRUCTION LLC05/23/2023
DOB NOWPlumbingSigned-offYG SERVICES INC05/09/2023
DOB NOWConstruction FenceSigned-offNYC TOP CONSTRUCTION LLC04/20/2023
DOB NOWConstruction FenceSigned-offNYC TOP CONSTRUCTION LLC04/20/2023
DOB NOWSupport of ExcavationSigned-offNYC TOP CONSTRUCTION LLC04/20/2023
DOB NOWFoundationSigned-offNYC TOP CONSTRUCTION LLC04/19/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/19/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC09/23/2022
DOB NOWStandpipeSigned-offA M B MECHANICAL INC09/23/2022
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN09/21/2022
DOB NOWSupport of ExcavationSigned-offNYC TOP CONSTRUCTION LLC09/19/2022
DOB NOWSupport of ExcavationSigned-offNYC TOP CONSTRUCTION LLC08/01/2022
DOB NOWConstruction FenceSigned-offNYC TOP CONSTRUCTION LLC06/21/2022
DOB NOWFoundationSigned-offNYC TOP CONSTRUCTION LLC06/01/2022
DOB NOWConstruction FenceSigned-offN TECH DESIGN OF AMERICA05/05/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/20/2022
DOB NOWConstruction FenceSigned-offSUPERB CONSTRUCTION MGT02/28/2022
BIS—ISSUEDNYC TOP CONSTRUCTION LLC10/27/2023
BIS—ISSUEDNYC TOP CONSTRUCTION LLC05/04/2023
BIS—ISSUEDNYC TOP CONSTRUCTION LLC11/07/2022
1 project · most recent 05/15/2024
Storm Water/Sanitary
FiledStatusContractorScope
05/15/2024Signed-offMPI PLUMBING CORPStorm, Water/Sanitary
4 projects · most recent 06/18/2024
General Wiring
FiledStatusContractorScope
06/18/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
10/30/2023CompletePOWER DIRECT ELECTRIC INC—
05/25/2023CompleteSOLAS ELECTRICAL CORP—
04/24/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/03/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/29/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
07/24/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/20/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/08/2024Pass-Final PL - UndergroundPassView ↗
01/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/04/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/04/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/31/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
06/05/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
06/05/2024Mechanical SystemsFAHAD FATEHspecial
06/05/2024FinalFAHAD FATEHprogress
06/05/2024HVAC insulation and sealing FAHAD FATEHenergy_progress
06/05/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
06/05/2024Maintenance informationFAHAD FATEHenergy_progress
06/05/2024Shutoff dampersFAHAD FATEHenergy_progress
05/21/2024Sprinkler SystemsFAHAD FATEHspecial
05/21/2024Standpipe SystemsFAHAD FATEHspecial
05/21/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/20/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/09/2024FinalFAHAD FATEHprogress
05/09/2024Maintenance informationFAHAD FATEHenergy_progress
05/09/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
05/09/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
05/09/2024Shutoff dampersFAHAD FATEHenergy_progress
05/09/2024HVAC insulation and sealing FAHAD FATEHenergy_progress
05/09/2024Mechanical SystemsFAHAD FATEHspecial
05/02/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/02/2024Sprinkler SystemsFAHAD FATEHspecial
05/02/2024Standpipe SystemsFAHAD FATEHspecial
05/02/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/05/2022Final—progress
05/05/2022Concrete - Cast-In-Place—special
05/05/2022Footing and Foundation—progress
Latest 25 of 35.
▾Documents — 187 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch6
08/26/2026Q00719391-P1Request digital key ↗
08/26/2026Q00719391-I1Request digital key ↗
08/24/2026Q00528522-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/22/2026Q00426908-P1Request digital key ↗
08/15/2026Q00426908-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/22/2026Q00426987-P1Request digital key ↗
08/22/2026Q00426987-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/22/2026Q00426947-P1Request digital key ↗
08/22/2026Q00426947-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/22/2026Q00426987-P1Request digital key ↗
08/22/2026Q00426987-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation1
08/27/2026Q00456180-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/27/2026Q00456191-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026Q00444186-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation1
08/27/2026Q00456186-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION15
08/06/2024421133179Open ↗
07/16/2024421133179Open ↗
07/10/2024421133179Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION2
07/18/2023421133179Open ↗
12/16/2022421133179Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM2
07/24/2024421133179Open ↗
09/09/2021421133179Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/12/2021421133179Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/09/2021421133179Open ↗
▸BISVERIFY TAX LOT1
04/17/2024421133179Open ↗
▸BISFLOOD ZONE COMPLIANCE1
07/17/2024421133179Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/12/2021421133179Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/17/2024421133179Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
04/29/2021421133179Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026Q00456186-I1Open ↗
08/27/2026Q00456191-I1Open ↗
08/26/2026Q00719391-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/26/2026Q00426947-I1Open ↗
09/02/2026Q00426987-I1Open ↗
09/01/2026Q00426947-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/26/2026Q00426947-I1Open ↗
09/26/2026Q00426947-I1Open ↗
09/01/2026Q00426947-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/16/2022421133179Open ↗
12/20/2011420516141Open ↗
03/22/2010420164645Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/20/2011420516141Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/20/2011420516141Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
12/20/2011420516141Open ↗
03/22/2010420164645Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/17/2024421133179Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/17/2024421133179Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/09/2024421133179Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
08/12/2021421133179Open ↗
09/23/2020421133179Open ↗
12/20/2011420516141Open ↗
▸BISSTREET TREE SIGNOFF1
09/19/2025421133179Open ↗
▸Environmental & Asbestos15
▸DOB NOWOER: Notice to Proceed8
08/22/2026Q00426947-I1Open ↗
08/13/2026Q00456180-I1Open ↗
08/13/2026Q00426908-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026Q00456191-I1Open ↗
08/13/2026Q00426908-I1Open ↗
08/13/2026Q00456180-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/22/2010420164645Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
03/18/2025421133179Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
04/29/2021421133179Open ↗
▸Energy Compliance15
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
01/28/2026421133179Open ↗
01/27/2026421133179Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/17/2024421133179Open ↗
▸BISINTERIOR LIGHTING POWER1
07/17/2024421133179Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/17/2024421133179Open ↗
▸BISFENESTRATION AREAS1
07/17/2024421133179Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/17/2024421133179Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/12/2021421133179Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/17/2024421133179Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/17/2024421133179Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/17/2024421133179Open ↗
▸BISELECTRIC MOTORS1
07/17/2024421133179Open ↗
▸BISLIGHTING CONTROLS1
07/17/2024421133179Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/20/2011420516141Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00426947-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
12/16/2022421133179Open ↗
12/16/2022421133179Open ↗
12/16/2022421133179Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/12/2021421133179Open ↗
04/29/2021421133179Open ↗
04/29/2021421133179Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/30/2024421133179Open ↗
12/16/2022421133179Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/17/2024421133179Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/17/2024421133179Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/17/2024421133179Open ↗
▸BISMASONRY1
07/17/2024421133179Open ↗
▸BISPOST-INSTALLED ANCHORS1
07/17/2024421133179Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/17/2024421133179Open ↗
▸BISSOIL REPORT1
04/29/2021421133179Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE3
07/10/2024421133179Open ↗
07/05/2024421133179Open ↗
09/09/2021421133179Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/18/2023421133179Open ↗
04/29/2021421133179Open ↗
02/01/2012420516141Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/20/2011420516141Open ↗
03/22/2010420164645Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/20/2011420516141Open ↗
04/23/2010420164645Open ↗
03/22/2010420164645Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION2
07/24/2024421133179Open ↗
08/12/2021421133179Open ↗
▸BISEFILING COVER SHEET2
12/20/2011420516141Open ↗
03/22/2010420164645Open ↗
▸BISBOROUGH INTAKE FORM2
07/18/2023421133179Open ↗
12/16/2022421133179Open ↗
▸Other Documents10
▸BISSHUTOFF DAMPERS1
07/17/2024421133179Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
08/12/2021421133179Open ↗
▸BISLOWEST FLOOR ELEVATION1
07/17/2024421133179Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
07/17/2024421133179Open ↗
▸BISMAINTENANCE INFORMATION1
07/17/2024421133179Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
07/17/2024421133179Open ↗
▸BISON-SITE PRIVATE SEWAGE DISPOSAL SYSTEMS INSTALLATION1
07/17/2024421133179Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/17/2024421133179Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00456186-I1Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
08/13/2026Q00426908-S1Open ↗