Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGenerator upgrade and mechanical workUnder Construction46p · 3 filings · 16 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Project Q01034640Permit Issued · 05/29/2026
interior/ exterior renovations as per plans filed herewith. No change in use, egress or occupancy
On file for this project
2 documents
Project Q01034688Permit Issued · 05/29/2026
Additions/modifications to existing mechanical system as per plans filed herewith.
On file for this project
10 documents
Project Q01035315Signed-off · 06/09/2025
structural scope as per plans filed herewith no change in use egress or occupancy.
On file for this project
4 documents
Floor 5Under Construction13p · 1 filing · 2 docs
Architecture
Issued Permit Scope
General Construction
Project Q01034640Permit Issued · 05/29/2026
interior/ exterior renovations as per plans filed herewith. No change in use, egress or occupancy
On file for this project
2 documents
Floor 4Under Construction13p · 1 filing · 2 docs
ArchitectureDM
Issued Permit Scope
General Construction
Project Q01034640Permit Issued · 05/29/2026
interior/ exterior renovations as per plans filed herewith. No change in use, egress or occupancy
On file for this project
2 documents
Floor 3Generator upgrade and mechanical workUnder Construction50p · 2 filings · 12 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Project Q01034640Permit Issued · 05/29/2026
interior/ exterior renovations as per plans filed herewith. No change in use, egress or occupancy
On file for this project
2 documents
Project Q01034688Permit Issued · 05/29/2026
Additions/modifications to existing mechanical system as per plans filed herewith.
On file for this project
10 documents
Floor 2Generator upgrade and mechanical workUnder Construction45p · 2 filings · 12 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Project Q01034640Permit Issued · 05/29/2026
interior/ exterior renovations as per plans filed herewith. No change in use, egress or occupancy
On file for this project
2 documents
Project Q01034688Permit Issued · 05/29/2026
Additions/modifications to existing mechanical system as per plans filed herewith.
On file for this project
10 documents
Floor 1Generator Upgrade and Mechanical Fuel OilUnder Construction60p · 7 filings · 16 docs
ArchitectureDMMechanicalStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Structural
Project Q01128826Permit Issued · 06/30/2026
additions/modifications to fuel oil tanks and piping as per plans filed herewith.
On file for this project
2 documents
Project Q01034640Permit Issued · 05/29/2026
interior/ exterior renovations as per plans filed herewith. No change in use, egress or occupancy
On file for this project
2 documents
Project Q01034688Permit Issued · 05/29/2026
Additions/modifications to existing mechanical system as per plans filed herewith.
On file for this project
10 documents
Latest 3 of 7 filings on this floor.
CellarSidewalk Vault RepairUnder Construction16p · 2 filings · 12 docs
ArchitectureDMGeneral
Issued Permit Scope
General Construction
Project Q01034640Permit Issued · 05/29/2026
interior/ exterior renovations as per plans filed herewith. No change in use, egress or occupancy
On file for this project
2 documents
Project Q00595043Signed-off · 10/28/2021
Structural related to sidewalk vault repair. No change of use, occupancy or egress.
On file for this project
10 documents
BasementGenerator Upgrade and Mechanical Fuel OilUnder Construction2p · 1 filing · 2 docs
GeneralMechanical
Project Q01128826Permit Issued · 06/30/2026
additions/modifications to fuel oil tanks and piping as per plans filed herewith.
On file for this project
2 documents
Sub-BasementGenerator Upgrade and Mechanical Fuel OilUnder Construction11p · 2 filings · 12 docs
MechanicalStructural
Issued Permit Scope
Boiler Equipment · Structural
Project Q01128826Permit Issued · 06/30/2026
additions/modifications to fuel oil tanks and piping as per plans filed herewith.
On file for this project
2 documents
Project Q00595043Signed-off · 10/28/2021
Structural related to sidewalk vault repair. No change of use, occupancy or egress.
On file for this project
10 documents
Site & exteriorAdditional pipe scaffold28p · 4 filings · 14 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Standpipe · Structural · Supported Scaffold
Project Q01196907Signed-off · 03/24/2026
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PIPE SCAFFOL ON THE SOUTHWEST CORNER OF THE BACKYARD FROM THE FLOOR TO PAST TOP OF THE PARAPER WALL.
On file for this project
2 documents
Project Q00656983Signed-off · 02/28/2022
Modification of Standpipe, to have it Temporarily extened pasted the construction fence.
On file for this project
2 documents
Project Q00635966Signed-off · 11/24/2021
INSTALLATION OF PLYWOOD FENCE AND BARRICADE AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
1 document
Latest 3 of 4 filings on this floor.