← Back
Two stories - detached, small or mid-size
11-38 BAY 24 STREET
QUEENS · Far Rockaway-Bayswater · BIN 4462972
💬 Discuss this project
2000Year Built
2Stories
A1Building Class
R2Zoning
2,050 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 6,590 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SAMY MOUNASElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/11/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
01/23/2025
Signed off — Alteration
Q01124644-I1
10/21/2024
Permit issued — Solar
Q01124644-I1-SL
10/11/2024
Filed — Alteration
Q01124644-I1
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/09/2024
Special inspection requirement — Final
Walid Abdulla
10/09/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/31/2001
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/21/2024
BISPLISSUEDKAMAR MECHANICAL PLUMBING & HEAT12/13/2000
BIS—ISSUEDKAMAR MECHANICAL PLUMBING & HEAT12/06/2000
1 project · most recent 10/11/2024
FiledStatusContractorScope
10/11/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/09/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/09/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/09/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/09/2024FinalWalid Abdullaprogress
10/09/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01124644-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q01124644-I1Open ↗
08/29/2026Q01124644-I1Open ↗
08/29/2026Q01124644-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q01124644-I1Open ↗
08/29/2026Q01124644-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01124644-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01124644-I1Open ↗