DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
ECB01/09/200950A,50C,50B,50D,21A,48A. 50A NO DAR KIT ON OIL BURNER. 50B NEED TEST TEE ON STEAM GAUGE W/ VALVE. 50C FRESH AIR BLOWER NOT INTERLOCKED W/ BURNER 50 NEED FUSABLE LINK ON FRESH AIR INLET.Nothing owed — awaiting certificate of correction
ECB06/08/200116-49 SUBMIT PROOF OF REGISTERATION FOR THIS BOILER STEAM-PAK NB 407 YEAR 1958Nothing owed — awaiting certificate of correction
ECB02/01/199916Nothing owed — awaiting certificate of correction