← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Enzo Lic Condominium
11-52 44TH DRIVE · BIN 4619901
💬 Discuss this project
2023Year Built
7Stories
RMBuilding Class
M1-4A/R8AZoning
13,019 sfGross Floor Area
23Units
0 Active Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 11-52 Haocheng · 3,900 sf lot · 3.34 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof11-52 Haocheng LLC56p · 5 filings · 20 docs
Bulkhead11-52 Haocheng LLC4p · 3 filings · 20 docs
Floor 711-52 Haocheng LLC56p · 4 filings · 20 docs
Floor 611-52 Haocheng LLC57p · 4 filings · 20 docs
Floor 511-52 Haocheng LLC54p · 4 filings · 20 docs
Floor 411-52 Haocheng LLC54p · 4 filings · 20 docs
Floor 311-52 Haocheng LLC55p · 4 filings · 20 docs
Floor 211-52 Haocheng LLC54p · 4 filings · 20 docs
Floor 111-52 Haocheng LLC58p · 5 filings · 20 docs
Cellar11-52 Haocheng LLC58p · 5 filings · 20 docs
Site & exterior11-52 Haocheng LLC76p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
11-52 Haocheng5407/08/2026
11-52 44th Drive803/21/2026
Court Square Commercial410/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XC Engineering409/11/2026
Hidamari Engineering Services810/29/2024
Arquitectura Varela509/11/2023
Fang Architect206/09/2021
Structural Engineering Systems, PLL110/15/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Fang Architect903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
360 Prestige ContractingGeneral Contractor603/21/2026
Classic Consulting GroupScaffold403/21/2026
All State 12 General ContractingScaffold303/21/2026
360 Prestige ContractingScaffold303/21/2026
MPS Plumbing & HeatingPlumbing207/08/2026
Access Solutions GroupScaffold203/21/2026
Flushing One ConstructionScaffold207/08/2026
Jun Safety ElectricalElectrical203/22/2026
DHC ContractingScaffold107/08/2026
MPS Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Z & T Engineering591608/06/2024
G Engineering7778110/15/2019
Building Lifecycle
All (96)Filed (20)Permit Issued (13)Signed Off (8)Violation (3)Inspection (7)Objection (15)Special Inspection (30)
09/30/2026
Objection raised — Structural
09/30/2026
Objection raised — Scope
09/30/2026
Objection raised — Other
09/30/2026
Objection raised — Other
09/30/2026
Objection raised — Admin
09/30/2026
Objection raised — Structural
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Cost
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/11/2026
Filed — Alteration
INSTALL / MODIFY SPRINKLER HEADS PER NEW LAYOUT WITHIN EXISTING TENANT SPACE ON 1ST FLOOR. NO CHANGE TO EXISTING BUILDING SPRINKLER SYSTEM. NO CHANGE TO OCCUPANCY, GROUP AND USE.
Q01456124-I1
09/11/2026
Filed — Alteration
INSTALL / MODIFY SPRINKLER HEADS PER NEW LAYOUT WITHIN EXISTING TENANT SPACE ON 1ST FLOOR. NO CHANGE TO EXISTING BUILDING SPRINKLER SYSTEM. NO CHANGE TO OCCUPANCY, GROUP AND USE.
Q01456124-S3
09/11/2026
Filed — Alteration
INSTALL / MODIFY SPRINKLER HEADS PER NEW LAYOUT WITHIN EXISTING TENANT SPACE ON 1ST FLOOR. NO CHANGE TO EXISTING BUILDING SPRINKLER SYSTEM. NO CHANGE TO OCCUPANCY, GROUP AND USE.
Q01456124-S2
09/11/2026
Filed — Alteration
INSTALL / MODIFY SPRINKLER HEADS PER NEW LAYOUT WITHIN EXISTING TENANT SPACE ON 1ST FLOOR. NO CHANGE TO EXISTING BUILDING SPRINKLER SYSTEM. NO CHANGE TO OCCUPANCY, GROUP AND USE.
Q01456124-S1
09/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/10/2026
Special inspection requirement — Maintenance information
09/10/2026
Special inspection requirement — Energy Code Compliance Inspections
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2026
Special inspection requirement — Shutoff dampers
09/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/10/2026
Special inspection requirement — Energy Code Compliance Inspections
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/10/2026
Special inspection requirement — Interior lighting power
09/10/2026
Special inspection requirement — Lighting controls
09/04/2026
Special inspection requirement — Sprinkler Systems
09/04/2026
Special inspection requirement — Final
09/04/2026
Special inspection requirement — Mechanical Systems
03/28/2025
Signed off — Alteration
FILING OF MECHANICAL WORK IN CONJUNCTION WITH NB #421647659.
Q00207953-I1
03/13/2025
Signed off — Alteration
FILING OF PLUMBING WORK IN CONJUNCTION WITH NB #421647659.
Q00207942-I1
11/12/2024
Signed off — Alteration
HEREWITH FILED FOR STRUCTURAL WORK IN CONJUNCTION WITH NB #421647659.
Q00210997-I1
10/29/2024
Filed — Alteration
FILING OF MECHANICAL WORK IN CONJUNCTION WITH NB #421647659.
Q00207953-P2
10/29/2024
Special inspection requirement — HVAC insulation and sealing
Fei Zeng
10/29/2024
Special inspection requirement — Heating Systems
Fei Zeng
10/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
10/29/2024
Special inspection requirement — Mechanical Systems
Fei Zeng
10/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
Fei Zeng
10/29/2024
Special inspection requirement — Final
Fei Zeng
10/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
10/29/2024
Special inspection requirement — Preliminary
Fei Zeng
10/29/2024
Special inspection requirement — HVAC and service water heating system controls
Fei Zeng
10/29/2024
Special inspection requirement — Shutoff dampers
Fei Zeng
10/29/2024
Special inspection requirement — Maintenance information
Fei Zeng
10/29/2024
Special inspection requirement — HVAC and service water heating equipment
Fei Zeng
09/05/2024
Signed off — Alteration
FILING OF SPRINKLER WORK IN CONJUNCTION WITH NB #421647659.
Q00207954-I1
09/03/2024
Signed off — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH NB JOB #421647659.
Q00536963-I1
08/06/2024
Filed — Alteration
FILING OF PLUMBING WORK IN CONJUNCTION WITH NB #421647659.
Q00207942-P3
07/11/2024
Permit issued — Plumbing
Q00207942-I1-PL
06/18/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
06/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/12/2024
Filed — Alteration
FILING OF SPRINKLER WORK IN CONJUNCTION WITH NB #421647659.
Q00207954-P1
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMPS Plumbing & Heating07/11/2024
DOB NOWMechanical SystemsSigned-off360 Prestige Contracting08/22/2023
DOB NOWSupported ScaffoldSigned-offClassic Consulting Group08/21/2023
DOB NOWSprinklersSigned-offMPS Plumbing & Heating08/21/2023
DOB NOWSidewalk ShedSigned-offAccess Solutions Group08/01/2023
DOB NOWStructuralSigned-off360 Prestige Contracting06/23/2023
DOB NOWSidewalk ShedSigned-offClassic Consulting Group06/22/2023
DOB NOWConstruction FenceSigned-off360 Prestige Contracting05/11/2023
DOB NOWPlumbingSigned-offMPS Plumbing & Heating04/07/2023
DOB NOWConstruction FenceSigned-offAlexander Chan02/10/2023
DOB NOWConstruction FenceSigned-offFlushing One Construction05/02/2022
DOB NOWConstruction FenceSigned-offFlushing One Construction06/25/2021
DOB NOWConstruction FenceSigned-offAll State 12 General Cont02/13/2020
BIS—ISSUED360 Prestige Contracting07/13/2023
BIS—ISSUED360 Prestige Contracting05/19/2023
BIS—ISSUED360 Prestige Contracting05/19/2023
BISOTISSUED360 Prestige Contracting05/19/2023
BIS—ISSUEDDHC Contracting12/09/2022
BIS—ISSUEDDHC Contracting12/09/2022
BISOTISSUEDDHC Contracting05/04/2022
BIS—ISSUEDDHC Contracting12/13/2021
BIS—ISSUEDDHC Contracting12/13/2021
BIS—ISSUEDDHC Contracting09/27/2021
BIS—ISSUEDDHC Contracting09/27/2021
BISOTISSUEDAll State 12 General Contracting03/06/2020
BIS—ISSUEDAll State 12 General Contracting02/26/2020
BIS—ISSUEDAll State 12 General Contracting02/26/2020
1 project · most recent 09/11/2026
FiledStatusContractorScope
09/11/2026———
1 project · most recent 09/11/2026
Water/Sanitary
FiledStatusContractorScope
09/11/2026——Water/Sanitary
3 projects · most recent 08/17/2024
General Wiring
FiledStatusContractorScope
08/17/2024CompleteJun Safety ElectricalGeneral Wiring
08/24/2023CompleteRichard Neu—
02/06/2023CompleteR.C.M. Electric—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/18/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/23/2023Pass-Final PL - UndergroundPassView ↗
07/19/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
09/10/2026Tenant Protection Plan Compliance—special
09/10/2026Maintenance information—energy_progress
09/10/2026Energy Code Compliance Inspections—progress
09/10/2026Fire-Resistant Penetrations and Joints—special
09/10/2026Tenant Protection Plan Compliance—special
09/10/2026Fire-Resistant Penetrations and Joints—special
09/10/2026Tenant Protection Plan Compliance—special
09/10/2026Fire-Resistant Penetrations and Joints—special
09/10/2026Shutoff dampers—energy_progress
09/10/2026HVAC-R and service water piping design and insulation—energy_progress
09/10/2026Energy Code Compliance Inspections—progress
09/10/2026Fire-Resistant Penetrations and Joints—special
09/10/2026Tenant Protection Plan Compliance—special
09/10/2026Interior lighting power—energy_progress
09/10/2026Lighting controls—energy_progress
09/04/2026Sprinkler Systems—special
09/04/2026Final—progress
09/04/2026Mechanical Systems—special
10/29/2024HVAC insulation and sealing Fei Zengenergy_progress
10/29/2024Heating SystemsFei Zengspecial
10/29/2024Fire-Resistant Penetrations and JointsFei Zengspecial
10/29/2024Mechanical SystemsFei Zengspecial
10/29/2024Fire-Resistance Rated ConstructionFei Zengprogress
10/29/2024FinalFei Zengprogress
10/29/2024Energy Code Compliance InspectionsFei Zengprogress
Latest 25 of 58.
▾Documents — 275 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch10
10/04/2026Q01456124-S3Request digital key ↗
10/04/2026Q01456124-S2Request digital key ↗
10/04/2026Q01456124-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/28/2026Q00207942-P2Request digital key ↗
08/28/2026Q00207942-I1Request digital key ↗
08/28/2026Q00207942-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/28/2026Q00207954-P1Request digital key ↗
08/28/2026Q00207954-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00207953-P2Request digital key ↗
08/28/2026Q00207953-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00231618-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/28/2026Q00210997-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION26
06/10/2025421840912Open ↗
04/11/2025421647659Open ↗
04/10/2025421647659Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION17
11/01/2023421647659Open ↗
11/01/2023421647659Open ↗
08/17/2023421647659Open ↗
Showing 3 of 17 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/13/2024421934786Open ↗
02/20/2020421934786Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/29/2024421647659Open ↗
▸BISVERIFY TAX LOT1
10/29/2024421647659Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/18/2019421647659Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/16/2024421647659Open ↗
▸BISZONING DIAGRAM1
09/20/2019421647659Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/29/2024421647659Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature20
10/04/2026Q01456124-S3Open ↗
10/04/2026Q01456124-S1Open ↗
10/04/2026Q01456124-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026Q00207953-I1Open ↗
08/28/2026Q00207954-P1Open ↗
08/24/2026Q00207954-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
03/07/2020421647659Open ↗
03/07/2020421647659Open ↗
03/07/2020421647659Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00207942-P2Open ↗
08/31/2026Q00207953-I1Open ↗
08/31/2026Q00207953-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/13/2019421904513Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/13/2019421904513Open ↗
▸Trade Schedules & Equipment6
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/09/2024421647659Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/06/2025421647659Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/06/2025421647659Open ↗
▸BISPLUMBING (PL) SIGNOFF1
03/21/2025421647659Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
05/15/2025421647659Open ↗
▸BISSPRINKLER SYSTEMS1
07/09/2024421647659Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
02/20/2020421934786Open ↗
07/10/2018421647659Open ↗
▸BISSTREET TREES SITE PLAN2
03/12/2025421934786Open ↗
07/09/2024421647659Open ↗
▸BISSTREET TREE SIGNOFF2
03/12/2025421934786Open ↗
07/09/2024421647659Open ↗
▸Environmental & Asbestos13
▸DOB NOWOER: Notice to Proceed7
08/28/2026Q00207954-I1Open ↗
08/28/2026Q00231618-I1Open ↗
08/13/2026Q00207942-P3Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
03/12/2025421934786Open ↗
03/12/2025421904513Open ↗
03/11/2025421647659Open ↗
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026Q00207953-I1Open ↗
08/13/2026Q00207954-I1Open ↗
08/13/2026Q00207942-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/07/2020421647659Open ↗
08/13/2019421647659Open ↗
07/19/2018421647659Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00207953-I1Open ↗
08/13/2026Q00207942-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/09/2024421647659Open ↗
▸BISFENESTRATION AREAS1
07/09/2024421647659Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/09/2024421647659Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/09/2024421647659Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/09/2024421647659Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/09/2024421647659Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/09/2024421647659Open ↗
▸BISLIGHTING CONTROLS1
07/09/2024421647659Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/09/2024421647659Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00207953-I1Open ↗
▸Inspections & Test Reports14
▸BISSUBGRADE INSP / SOILS-SITE PREP2
07/09/2024421647659Open ↗
08/31/2023421904513Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
07/09/2024421647659Open ↗
08/31/2023421904513Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/20/2023421647659Open ↗
03/07/2020421647659Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
07/09/2024421647659Open ↗
08/31/2023421904513Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
12/18/2019421904513Open ↗
08/13/2019421647659Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/09/2024421647659Open ↗
▸BISMASONRY1
07/09/2024421647659Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/05/2023421647659Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
11/08/2024421904513Open ↗
▸Approvals, Objections & Sign-offs21
▸BISSCHEDULE A - OCCUPANCY / USE9
04/10/2025421647659Open ↗
07/10/2024421647659Open ↗
07/02/2024421647659Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER7
08/17/2023421647659Open ↗
08/17/2023421647659Open ↗
08/17/2023421647659Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/29/2024421647659Open ↗
06/20/2023421647659Open ↗
02/20/2020421647659Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership13
▸BISPROJECT-SPECIFIC GL INSURANCE5
08/17/2023421647659Open ↗
07/11/2022421904513Open ↗
10/15/2021421647659Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
08/17/2023421904513Open ↗
08/17/2023421647659Open ↗
03/07/2020421647659Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
03/14/2020421904513Open ↗
03/07/2020421647659Open ↗
▸BISCOST AFFIDAVIT1
12/13/2019421904513Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
03/13/2025421934786Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/08/2024421904513Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION16
04/14/2025421647659Open ↗
10/29/2024421647659Open ↗
07/31/2024421647659Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET8
06/10/2025421840912Open ↗
12/18/2019421934786Open ↗
12/13/2019421904513Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
06/12/2025421840912Open ↗
11/01/2023421647659Open ↗
11/01/2023421647659Open ↗
Showing 3 of 6 on file for this type
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION4
03/13/2025421934786Open ↗
03/13/2025421934786Open ↗
03/13/2025421934786Open ↗
Showing 3 of 4 on file for this type
▸BISUnknown2
03/07/2020421647659Open ↗
03/07/2020421647659Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
03/13/2025421934786Open ↗
▸BISVESTIBULES1
07/09/2024421647659Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
07/09/2024421647659Open ↗
▸BISMAINTENANCE INFORMATION1
07/09/2024421647659Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/09/2024421647659Open ↗