← Back
Walk-up apt, over six families with stores
11 AVENUE D
MANHATTAN · BIN 1004369
💬 Discuss this project
1900Year Built
6Stories
C7Building Class
R8AZoning
14,400 sfGross Floor Area
19Units
Rent Stabilized95 Open Violations 86 unresolved · 9 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: DARIEL REALTY CORP. · 3,419 sf lot · 4.21 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalPlumbingFire Protection
Roof1p · 4 filings · 20 docs
Floor 61p · 1 filing · 9 docs
Floor 51p · 1 filing · 9 docs
Floor 41p · 1 filing · 9 docs
Floor 31p · 1 filing · 9 docs
Floor 21p · 1 filing · 9 docs
Floor 19p · 3 filings · 19 docs
Cellar9p · 3 filings · 8 docs
1 job · most recent 05/12/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/12/2025Signed-offMKSSKR CONSULTING SERVICEVentilation Systems
Ventilation
2 jobs · most recent 04/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/08/2025——Gas
03/07/2024——Water/Sanitary
2 jobs · most recent 04/16/2026
FiledStatusContractorScope
04/16/2026Permit IssuedRICHARD NEU—
11/17/2023CompleteRICHARD NEU—
2 jobs · most recent 03/30/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/30/2026Permit IssuedRELIABLE ENTERPRISES INCScaffold
03/27/2026Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
Building Lifecycle
All (158)Filed (19)Permit Issued (15)Signed Off (5)Violation (60)Objection (44)Special Inspection (15)
07/16/2026
Permit issued — Sidewalk Shed
M01373431-I1-SH
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
07/13/2026
Filed — Alteration
HEREWITH FILING FOR THE INTERIOR RENOVATION OF EXISITNG COMMERICAL STORE. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01427319-I1
07/07/2026
Special inspection requirement — Final
RONALD VILLANO
06/23/2026
Permit issued — General Construction
M01343795-I1-GC
06/01/2026
Signed off — Alteration
Interior work inside partial 1st Fl to propose a deli, work to replace missing fire-stopping, ceiling sheetrock, millwork, and interior finishes, and replace the existing commercial exhaust hood. work also to address the partial vacate order #1618017.
M01222596-I1
04/29/2026
Violation issued (HPD, open)
A
04/21/2026
Permit issued — Sidewalk Shed
M01373431-I1-SH
04/20/2026
Permit issued — Supported Scaffold
M01373542-I1-SF
03/30/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01373542-I1
03/27/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01373431-I1
02/11/2026
Filed — Alteration
M01343795-I1
02/10/2026
Special inspection requirement — Concrete - Cast-In-Place
Luis Pichardo
02/10/2026
Special inspection requirement — Masonry
Luis Pichardo
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/12/2026
Objection raised — Cost
01/12/2026
Objection raised — Scope
01/12/2026
Objection raised — Scope
01/08/2026
Special inspection requirement — Final
RONALD VILLANO
01/05/2026
Filed — Alteration
HEREWITH FILE ROLL DOWN GATE REPLACEMENT AT FRONT OF SHOP AS PER PLANS. NO Change to use egress or occupancy
M01337497-I1
12/22/2025
Violation issued (ECB, open)
Construction
12/22/2025
Violation issued (ECB, open)
Construction
12/22/2025
Violation issued (ECB, open)
Construction
12/22/2025
Violation issued (ECB, open)
Construction
12/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/22/2025
Violation issued (ECB, open)
Construction
12/19/2025
Violation issued (ECB, open)
Construction
12/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
12/19/2025
Special inspection requirement — Final
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/13/2025
Violation issued (ECB, open)
Construction
11/13/2025
Violation issued (ECB, open)
Construction
06/15/2025
Violation issued (HPD, open)
B
06/13/2025
Violation issued (ECB, open)
Construction
06/06/2025
Violation issued (ECB, open)
Construction
06/04/2025
Violation issued (HPD, open)
A
06/03/2025
Violation issued (ECB, open)
Construction
06/03/2025
Objection resolved — Addressed
06/02/2025
Violation issued (ECB, open)
Construction
05/20/2025
Violation issued (ECB, open)
Construction
05/20/2025
Violation issued (ECB, open)
Construction
05/20/2025
Violation issued (ECB, open)
Construction
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/15/2025
Permit issued — Mechanical Systems
M01222596-I1-GC-CX
05/12/2025
Filed — Alteration
Interior work inside partial 1st Fl to propose a deli, work to replace missing fire-stopping, ceiling sheetrock, millwork, and interior finishes, and replace the existing commercial exhaust hood. work also to address the partial vacate order #1618017.
M01222596-I1
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
05/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
05/07/2025
Special inspection requirement — Final
RONALD VILLANO
05/07/2025
Special inspection requirement — Mechanical Systems
Luis Pichardo
04/16/2025
Objection raised — Cost
04/16/2025
Objection raised — Scope
04/16/2025
Objection raised — Scope
04/08/2025
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES IN COMMERICAL STORE.
M01206586-I1
01/31/2025
Violation issued (HPD, closed)
C
01/31/2025
Violation issued (HPD, closed)
C
01/22/2025
Violation issued (HPD, open)
C
Latest 60 of 158 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES1209/13/2026
T-MOBILE407/08/2026
ECTO RESTORATION INC503/22/2026
DARIEL REALTY2603/22/2026
DANIEL REALTY303/22/2026
DARIEI REALTY CORP103/22/2026
11-13 AVE D ASSOCIATES2403/22/2026
OWNER OF 11-13 AVE D NY,103/22/2026
ULYSSES ASSET SUB I203/21/2026
T4 UNISON SITE MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor607/17/2026
OVERLAND CONTRACTING INCGeneral Contractor507/08/2026
BENNY CONTRACTORS INCGeneral Contractor303/21/2026
DESTHERS, JOHNElectrical203/21/2026
GROOS, FElectrical203/21/2026
R. MARIC PIPING INCElectrical203/21/2026
TRI CITY CONSTRUCTION CORGeneral Contractor207/08/2026
TAHMAZ, ERBAYElectrical203/21/2026
ECTO RESTORATION INCGeneral Contractor203/21/2026
ZAYN CONSTRUCTIONGeneral Contractor106/27/2026
MAGALLANES, ROBERTOElectrical103/21/2026
MICHAEL MURPHYElectrical103/21/2026
MURPHY, MICHAELElectrical103/21/2026
LEVEST ELECTRIC CORPGeneral Contractor107/08/2026
MKSSKR CONSULTING SERVICEGeneral Contractor104/09/2026
SITE STRUCTURAL SERVICESGeneral Contractor107/08/2026
CROCITTO, JR., WILLIAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369507/13/2026
M. INT'L ENGINEERING PLLC3129303/07/2024
SCHERER DESIGN GROUP, LLC6303108/10/2018
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC07/16/2026
DOB NOWGeneral ConstructionPermit IssuedZAYN CONSTRUCTION CORP06/23/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC04/21/2026
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC04/20/2026
DOB NOWMechanical SystemsSigned-offMKSSKR CONSULTING SERVICE05/15/2025
DOB NOWGeneral ConstructionPermit IssuedBENNY CONTRACTORS INC07/18/2024
DOB NOWStructuralPermit IssuedTRI CITY CONSTRUCTION COR04/25/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC03/27/2024
DOB NOWGeneral ConstructionSigned-offTRI CITY CONSTRUCTION COR10/05/2023
DOB NOWAntennaPermit IssuedSITE STRUCTURAL SERVICES06/01/2022
DOB NOWAntennaPermit IssuedLEVEST ELECTRIC CORP05/26/2021
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC11/12/2020
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC01/18/2020
DOB NOWSupported ScaffoldPermit IssuedECTO RESTORATION INC03/28/2019
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC08/27/2018
BISOTISSUEDTELCOM ENGINEERING GP INC08/29/2017
BISOTISSUEDTELCOM ENGINEERING GP INC08/21/2015
BISOTISSUEDTELCOM ENGINEERING GP INC01/13/2014
BISOTISSUEDALCATEL-LUCENT USA INC11/18/2013
BISOTISSUEDALPHABET PLAZA LLC04/18/2013
BISOTISSUEDBCI COMMUNICATIONS INC01/12/2009
BISOTISSUEDBCI COMMUNNICATIONS INC02/27/2008
BISOTISSUEDBUILDING REPAIR & MAINTENANCE CO08/09/2004
BISOTISSUEDNY SIGN CIY INC04/30/2003
BISOTISSUEDSING TAI PRODUCTION INC03/13/2003
BISOTISSUEDBUILDING REPAIR CORP.09/23/2002
BISBLISSUEDROBERT C VEGA04/04/2002
BISEQISSUEDCOLGATE SCAFF EQUI- CORP03/19/2002
BISMHRE-ISSUEDHIGHLAND CONSR ASSOC12/28/2001
BISOTISSUEDHIGHLAND CONSTRUCTION ASSOCIATES03/15/2001
BISFPISSUEDMASTER FIRE SYSTEMS, INC12/22/1997
BISPLISSUEDFINE TRIO PLMB INC12/22/1997
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS10/28/1993
BISMHISSUEDMAINLAND PLUMBING07/06/1993
BISFPRE-ISSUEDTWO STAR CONTRACTING CO.06/29/1993
BISPLISSUEDMAINLAND PLUMBING03/31/1993
BISOTISSUEDTQO STAR CONTRACTING CO01/06/1993
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/16/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
07/07/2026FinalRONALD VILLANOprogress
02/10/2026Concrete - Cast-In-PlaceLuis Pichardospecial
02/10/2026MasonryLuis Pichardospecial
01/08/2026FinalRONALD VILLANOprogress
12/19/2025Tenant Protection Plan ComplianceLuis Pichardospecial
12/19/2025Final—progress
05/08/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
05/08/2025Tenant Protection Plan ComplianceLuis Pichardospecial
05/07/2025FinalRONALD VILLANOprogress
05/07/2025Mechanical SystemsLuis Pichardospecial
07/07/2024FinalEric Fosterprogress
03/06/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
03/06/2024Sprayed fire-resistant materialsNANIK MASSANDspecial
03/06/2024FinalNANIK MASSANDprogress
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch14
09/06/2026M00068923-I1Request digital key ↗
09/02/2026M00670257-I1Request digital key ↗
08/28/2026M00949790-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Antenna3
09/06/2026M00083156-P1Request digital key ↗
09/05/2026M00317832-I1Request digital key ↗
08/14/2026M00083156-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00147488-I1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION9
08/30/2017123094490Open ↗
09/08/2015121804789Open ↗
01/14/2014121804789Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
10/30/2018122485186Open ↗
08/27/2018122485186Open ↗
05/24/2017123094490Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWFlood Zone Design Certification1
08/13/2026M00068923-I1Open ↗
▸DOB NOWFlood Zone Compliance1
08/13/2026M00068923-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/06/2026M00068923-I1Open ↗
09/06/2026M00083156-P1Open ↗
09/06/2026M00083156-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
08/27/2018122485186Open ↗
11/02/2017123094490Open ↗
07/27/2017123094490Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/27/2026M01337497-I1Open ↗
08/27/2026M01222596-I1Open ↗
08/27/2026M01222596-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026M01076930-I1Open ↗
08/27/2026M01222596-I1Open ↗
08/26/2026M01427319-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan3
09/06/2026M00083156-P1Open ↗
08/14/2026M00083156-I1Open ↗
08/13/2026M00317832-I1Open ↗
▸BISTenant Protection Plan and Notes1
07/27/2017123094490Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/06/2026M00068923-I1Open ↗
09/06/2026M00083156-P1Open ↗
09/05/2026M00317832-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/29/2017123094490Open ↗
08/12/2015122485186Open ↗
10/15/2013121804789Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
09/29/2010120480997Open ↗
09/29/2010120480997Open ↗
02/07/2008110284246Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/24/2013121772340Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
08/27/2018122485186Open ↗
11/02/2017123094490Open ↗
07/27/2017123094490Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections1
11/22/2013121804789Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/02/2017123094490Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
09/29/2010120480997Open ↗
02/07/2008110284246Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/02/2017123094490Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
11/02/2017123094490Open ↗
07/27/2017123094490Open ↗
08/12/2015122485186Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
05/24/2017123094490Open ↗
08/12/2015122485186Open ↗
10/15/2013121804789Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
10/30/2018122485186Open ↗
11/02/2017123094490Open ↗
▸BISADDITIONAL INFORMATION2
08/22/2017123094490Open ↗
11/15/2012121325342Open ↗
▸Other Documents3
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026M00068923-I1Open ↗
▸DOB NOWDoc 11
09/06/2026M00083156-P1Open ↗
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
08/13/2026M00068923-I1Open ↗