HPD05/08/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD06/13/2025(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD08/24/2018§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CEILING 5 SQ. FT. IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY, APARTMENT AT NORTH
HPD08/24/2018§ 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE - IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORY, APARTMENT AT NORTH
HPD08/24/2018§ 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE - IN THE ENTRANCE LOCATED AT APT 1FL, 1st STORY, APARTMENT AT NORTH
HPD08/24/2018§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORY, APARTMENT AT NORTH
HPD08/24/2018§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN CLOSET 3 SQ. FT. IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1FL, 1st STORY, APARTMENT AT NORTH
HPD08/24/2018§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1FL, 1st STORY, APARTMENT AT NORTH
HPD08/24/2018§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY, APARTMENT AT NORTH
DOB06/15/1999WORK WITHOUT A PERMIT. WORK NOTED: ERECTION OF A 2 STY HIGH MASONRY BLOCK WALL WITH WINDOW OPENING AT WEST AND EAST ELEVATIONS, BOTH ELEVATION HAS ALSO BEEN FORCED WITH BRICKS. 1 STY HIGH REMEDY: OBTAIN A PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
ECB06/15/1999WORK WITHOUT A PERMIT. WORK NOTED: ERECTION OF A 2 STORY HIGH MASONRY BLOCKWALL WITH WINDOW OPENINGS AT WEST AND EAST ELEVATIONS, BOTH ELE- VATIONS HAS ALSO BEEN FORCED WITH BRICKS. 1 STORY HIGH. REMEDY: OBTAINNothing owed — awaiting certificate of correction
ECB10/28/1993WORK WITHOUT A PERMIT: NEW MASONRY BLOCK WALLS ERECTED AT FRONT AND EAST SIDE OF PREMISES. NEW DRY WALL PARTITIONS AND CEILINGS ARE BEING ERECTED THROUGHOUT FIRST FLOOR. REMEDY:STOP ALL WORK FILE FOR PLANSNothing owed — awaiting certificate of correction