Roof2p · 2 filings · 9 docs
ArchitectureElectrical
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER DRAWINGS. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
FILING GENERAL CONSTRUCTION APPLICATION TO REMOVE AND REPLACE NON-LOAD BEARING PARTITIONS, FLOOR FINISHES, CEILING, WINDOWS AND ALL OTHER PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
Floor 210p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
FILING PLUMBING WORK TO REFLECT UPDATED FIXTURES BEING INSTALLED IN THE 2ND FLOOR UNIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
FILING WORK TO UPDATE MECHANICAL SYSTEMS FOR THE SECOND FLOOR DWELLING UNIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
FILING GENERAL CONSTRUCTION APPLICATION TO REMOVE AND REPLACE NON-LOAD BEARING PARTITIONS, FLOOR FINISHES, CEILING, WINDOWS AND ALL OTHER PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
Latest 3 of 4 filings on this floor.
Floor 1Under Construction26p · 6 filings · 20 docs
ArchitectureEquipmentMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sidewalk Shed · Structural
REPLACE PLUMBING FIXTURES AND ASSOCIATED ROUGHING AND INSTALL NEW BATHROOM FIXTURES AND PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
11 documents · 1 drawing sheet
herewith file structural plans for structural demolition and framing in existing commercial space on floors cellar and 1st, filed in conjunction with general construction.
On file for this project
11 documents
Removal of existing plumbing fixtures in the powder room, cap pipe for reuse.
On file for this project
12 documents
Latest 3 of 6 filings on this floor.
CellarUnder Construction36p · 5 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
REPLACE PLUMBING FIXTURES AND ASSOCIATED ROUGHING AND INSTALL NEW BATHROOM FIXTURES AND PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
11 documents
herewith file structural plans for structural demolition and framing in existing commercial space on floors cellar and 1st, filed in conjunction with general construction.
On file for this project
11 documents · 4 drawing sheets
INSTALLATION OF MULTISTACK MODULAR CHILLER WITH 3 MODULES IN THE CELLAR MECHANICAL ROOM WITH A TOTAL CAPACITY OF 95.88 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Site & exteriorUnder Construction13p · 6 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
REPLACE PLUMBING FIXTURES AND ASSOCIATED ROUGHING AND INSTALL NEW BATHROOM FIXTURES AND PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
11 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY WINDOW PROTECTION AS PER DRAWINGS. WINDOW PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.