← Back
Two family frame
11 ESTELLE PLACE
STATEN ISLAND · BIN 5174474
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3XZoning
3,457 sfGross Floor Area
2Units
Two family frame · 4,966 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 21p · 1 filing · 5 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CELLO BUILDERS1107/08/2026
NELLO DEVELOPMENT807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.201/11/2022
SANNA & LOCCISANO ARCHITECTS, PC301/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C603/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUO PLUMBING & HTG CORP.Plumbing707/08/2026
JOSEPH LOCCISANOElectrical103/21/2026
LASER LITE ELECT'L INC.Electrical103/22/2026
NELLO HOMES, INCGeneral Contractor107/08/2026
Building Lifecycle
All (21)Filed (5)Permit Issued (4)Signed Off (3)Inspection (4)Special Inspection (5)
03/03/2022
Signed off — Alteration
FILING IS IN CONJUNCTION W/ NB APPLICATION #520393477
S00326638-I1
01/27/2022
Signed off — Alteration
Installation of new fire sprinkler system with valves and meters for same. Filed in conjunction with new building application # 520393477.
S00404619-I1
01/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/11/2022
Filed — Alteration
Installation of new fire sprinkler system with valves and meters for same. Filed in conjunction with new building application # 520393477.
S00404619-P1
01/10/2022
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
01/10/2022
Special inspection requirement — HVAC insulation and sealing
anthony santoro
01/10/2022
Special inspection requirement — Maintenance information
anthony santoro
01/10/2022
Special inspection requirement — HVAC and service water heating equipment
anthony santoro
01/10/2022
Special inspection requirement — HVAC and service water heating system controls
anthony santoro
01/06/2022
Filed — Alteration
FILING IS IN CONJUNCTION W/ NB APPLICATION #520393477
S00326638-P1
01/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2021
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
12/22/2021
Permit issued — Plumbing
S00326638-I1-PL
12/02/2021
Signed off — Alteration
Proposed 18'-0" wide curb cut including (2) 18" splays.
S00247503-I1
11/24/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/08/2021
Permit issued — Curb Cut
S00247503-I1-CC
05/06/2021
Permit issued — Plumbing
S00404619-I1-PL
12/21/2020
Filed — Alteration
Installation of new fire sprinkler system with valves and meters for same. Filed in conjunction with new building application # 520393477.
S00404619-I1
12/04/2020
Permit issued — Plumbing
S00326638-I1-PL
03/30/2020
Filed — Alteration
FILING IS IN CONJUNCTION W/ NB APPLICATION #520393477
S00326638-I1
10/18/2019
Filed — Alteration
Proposed 18'-0" wide curb cut including (2) 18" splays.
S00247503-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.12/22/2021
DOB NOWCurb CutSigned-offNELLO HOMES, INC10/08/2021
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.05/06/2021
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.12/04/2020
BIS—ISSUEDCELLO BUILDERS INC07/13/2021
BIS—ISSUEDCELLO BUILDERS INC07/24/2020
1 project · most recent 03/09/2022
General Wiring
FiledStatusContractorScope
03/09/2022CompleteLASER LITE ELECT'L INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2021Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
11/24/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/10/2022Energy Code Compliance Inspectionsanthony santoroprogress
01/10/2022HVAC insulation and sealing anthony santoroenergy_progress
01/10/2022Maintenance informationanthony santoroenergy_progress
01/10/2022HVAC and service water heating equipment anthony santoroenergy_progress
01/10/2022HVAC and service water heating system controls anthony santoroenergy_progress
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing4
08/24/2026S00326638-I1Request digital key ↗
08/24/2026S00326638-P1Request digital key ↗
08/24/2026S00404619-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/26/2026S00247503-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
01/07/2022520393477Open ↗
12/27/2021520393477Open ↗
05/27/2020520393477Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
10/07/2021520393477Open ↗
10/06/2021520393477Open ↗
▸BISWORK PERMIT APPLICATION1
07/24/2020520393477Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/13/2020520393477Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/27/2020520393477Open ↗
▸BISVERIFY TAX LOT1
10/06/2021520393477Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/06/2021520393477Open ↗
▸BISZONING DIAGRAM1
05/28/2020520393477Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026S00247503-I1Open ↗
08/24/2026S00326638-P1Open ↗
08/24/2026S00326638-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026S00326638-I1Open ↗
08/26/2026S00326638-I1Open ↗
08/26/2026S00326638-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/13/2020520393477Open ↗
03/13/2020520393477Open ↗
03/13/2020520393477Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/13/2020520393477Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/13/2020520393477Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/15/2022520393477Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/15/2022520393477Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
03/13/2020520393477Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREES SITE PLAN1
01/28/2022520393477Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/24/2020520393477Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/13/2020520393477Open ↗
▸BISSTREET TREE CHECKLIST1
03/13/2020520393477Open ↗
▸BISSTREET TREE SIGNOFF1
03/16/2022520393477Open ↗
▸Energy Compliance12
▸BISAIR SEALING AND INSULATION - VISUAL1
02/15/2022520393477Open ↗
▸BISINTERIOR LIGHTING POWER1
02/15/2022520393477Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
02/15/2022520393477Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/15/2022520393477Open ↗
▸BISFENESTRATION AREAS1
02/15/2022520393477Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
02/15/2022520393477Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/24/2020520393477Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/15/2022520393477Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/15/2022520393477Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/15/2022520393477Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/13/2020520393477Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/15/2022520393477Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/06/2021520393477Open ↗
07/24/2020520393477Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
02/15/2022520393477Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/15/2022520393477Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/21/2022520393477Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
07/24/2020520393477Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/15/2022520393477Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/15/2022520393477Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/15/2022520393477Open ↗
▸BISCONCRETE RETAINING WALL1
04/01/2022520393477Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
03/13/2020520393477Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
02/15/2022520393477Open ↗
▸BISSOIL PERC. TEST-STORM WATER SYSTEM (DRYWELL)1
01/21/2022520393477Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE3
12/27/2021520393477Open ↗
05/27/2020520393477Open ↗
03/13/2020520393477Open ↗
▸BISBSA/CPC APPROVAL1
03/13/2020520393477Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
03/13/2020520393477Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/13/2020520393477Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
12/27/2021520393477Open ↗
▸BISEFILING COVER SHEET1
03/13/2020520393477Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/28/2020520393477Open ↗
05/28/2020520393477Open ↗
▸BISSHUTOFF DAMPERS1
02/15/2022520393477Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/29/2020520393477Open ↗
▸BISMAINTENANCE INFORMATION1
02/15/2022520393477Open ↗
▸BISPERMANENT CERTIFICATE1
02/15/2022520393477Open ↗
▸BISFIREPLACES1
02/15/2022520393477Open ↗
▸BISDOB NOW REVIEW COMPLETE1
03/24/2022520393477Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
02/15/2022520393477Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/24/2020520393477Open ↗
▸BISBORING FOR DRYWELL1
04/01/2022520393477Open ↗
▸BISPLOT DIAGRAM1
05/29/2020520393477Open ↗