← Back
BuildNYC
Two family frame
11 FROSINONE LANE
STATEN ISLAND · BIN 5164351
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3XZoning
—Gross Floor Area
2Units
Two family frame · 0.58 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Joline Estates703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Etrecte108/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jbi Construction Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Capital Contracting P&HPlumbing403/22/2026
Hughchrysler Engineering CoElectrical103/21/2026
JSP Electl CNTNGElectrical103/22/2026
JSP Electl CNTNGElectrical103/21/2026
Hub Electrical Indust'sElectrical103/21/2026
Thomas J SovieroElectrical103/21/2026
J.B.I. Construction GroupGeneral Contractor107/08/2026
Safety DynamicsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Etrecte8116108/28/2024
Building Lifecycle
08/19/2025
Signed off — Alteration
S01103347-I1
08/30/2024
Permit issued — Solar
S01103347-I1-SL
08/28/2024
Filed — Alteration
S01103347-I1
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
08/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. Construction Group08/30/2024
BISPLISSUEDQuality Plumbing11/23/2022
BIS—ISSUEDM.S.B. Development Co03/12/2022
BIS—ISSUEDM.S.B. Development Co03/24/2021
BISPLISSUEDQuality Plumbing03/23/2021
BIS—ISSUEDM.S.B. Development Co03/30/2020
BIS—ISSUEDM.S.B. Development Co02/03/2020
2 projects · most recent 08/26/2024
General Wiring
FiledStatusContractorScope
08/26/2024CompleteJSP Electl CNTNG—
10/28/2021CompleteCeco ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/28/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
08/28/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
08/28/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
08/28/2024FinalVYACHESLAV NECHAYEVprogress
08/28/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
88 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account