← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
11 HARRISON STREET
MANHATTAN · BIN 1066435
💬 Discuss this project
1893Year Built
7Stories
RMBuilding Class
C6-2AZoning
14,486 sfGross Floor Area
8Units
Rent Stabilized9 Open Violations 5 unresolved · 4 paperwork only ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 11 HARRISON STREET ASSOCIATES · 2,396 sf lot · 6.05 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof1p · 1 filing · 4 docs
Floor 72p · 1 filing · 20 docs
Floor 6
Floor 52p · 1 filing · 6 docs
Floor 41p · 1 filing · 6 docs
Floor 3
Floor 2
Floor 11p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
11 HARRISON STREET ASSCOC103/22/2026
11_HARRISON ST503/22/2026
NAX CONSTRUCTION103/22/2026
OWNER OF 11 HARRISON ST103/22/2026
HARRISON ASSOCIATES103/22/2026
11 HARRISON ASSOCIATES1603/22/2026
GANIARIS REALTY GROUP103/22/2026
STEEL SYSTEMS903/21/2026
11 HARRISON CONDO403/21/2026
11 HARRISON STREET CONDOMINIUM L103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING403/21/2026
KIT MIDDLETON ARCHITECT P C203/21/2026
NYCCODE803/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
HH BUILDING CONSULTING & ARCHITECTU203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMSTERDAM PLBG & HTGPlumbing307/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor303/21/2026
G.N. CONSTRUCTION INCGeneral Contractor203/21/2026
SUPERIOR PLUMBING & HEATINGPlumbing203/22/2026
FX CONSTRUCTION LLCGeneral Contractor203/21/2026
NORBERT GERSHKOVICHElectrical103/21/2026
PRECISE RENOVATION INCGeneral Contractor107/08/2026
URBAN D.C. INCGeneral Contractor107/08/2026
CENTURY ELECTRIC CO.Electrical103/22/2026
BRIAN FAERBERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLOCKWORK DESIGN BUILD LL8258106/03/2025
EMPIRETECH CONSULTING ENG8254203/09/2025
RONDOUT ARCHITECTURE6194306/01/2022
HAMANN ENGINEERING, PLLC4949101/22/2021
NY RESTORATION TECHNOLOGY6187112/23/2019
Building Lifecycle
All (113)Filed (13)Permit Issued (8)Signed Off (5)Facade (FISP) (21)Violation (42)Inspection (2)Objection (6)Special Inspection (16)
06/15/2026
Signed off — Alteration
INTERIOR RENOVATION OF UNIT #4. KITCHEN RENOVATION AND REPLACEMENT OF APPLIANCES. MECHANICAL SYSTEM REPLACED WITH TWO NEW AHUs AND CONDENSER INSTALLED ON ROOF. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01219068-I1
11/17/2025
Violation issued (HPD, closed)
I
07/24/2025
Signed off — Alteration
REPAIR DETERIORATED AREAS OF BUILDING'S WEST AND SOUTH FACADES ONLY, COMPRISING OF REPOINTING, BRICK REPAIR AND REPLACEMENT ALONG WITH BROKEN STONE REPAIRS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00688411-I1
06/25/2025
Permit issued — General Construction
M01219068-I1-GC-CX
06/04/2025
Violation issued (HPD, closed)
A
06/03/2025
Filed — Alteration
INTERIOR RENOVATION OF UNIT #4. KITCHEN RENOVATION AND REPLACEMENT OF APPLIANCES. MECHANICAL SYSTEM REPLACED WITH TWO NEW AHUs AND CONDENSER INSTALLED ON ROOF. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01219068-I1
05/16/2025
Special inspection requirement — Final
ABBAS SHAH
05/16/2025
Special inspection requirement — Masonry
ABBAS SHAH
05/01/2025
Special inspection requirement — Mechanical Systems
Steven Cummings
05/01/2025
Special inspection requirement — Final
Steven Cummings
03/09/2025
Filed — Alteration
REPAIR DETERIORATED AREAS OF BUILDING'S WEST AND SOUTH FACADES ONLY, COMPRISING OF REPOINTING, BRICK REPAIR AND REPLACEMENT ALONG WITH BROKEN STONE REPAIRS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00688411-P1
11/22/2024
Violation issued (HPD, closed)
I
04/01/2024
Violation issued (HPD, closed)
A
09/26/2023
Cycle 9 facade report submitted
09/25/2023
Cycle 9 facade report signed — SWARMP
09/21/2023
Cycle 9 facade inspection completed
09/13/2023
Permit issued — General Construction
M00688411-I1-GC
11/02/2022
Violation issued (HPD, closed)
I
09/30/2022
Cycle 9 facade report submitted
09/30/2022
Cycle 9 facade report signed — SWARMP
09/27/2022
Cycle 9 facade inspection completed
09/07/2022
Signed off — Alteration
Installation of a new Gas Range and a new Gas Water Heater on a 7th floor. No change of use, egress or occupancy.
M00267131-I1
08/15/2022
Inspection — Pass-Final PL Permit Withdrawal
Pass
View inspection ↗
06/09/2022
Filed — Alteration
REPAIR DETERIORATED AREAS OF BUILDING'S WEST AND SOUTH FACADES ONLY, COMPRISING OF REPOINTING, BRICK REPAIR AND REPLACEMENT ALONG WITH BROKEN STONE REPAIRS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00688411-S1
06/06/2022
Special inspection requirement — Final
ABBAS SHAH
06/01/2022
Filed — Alteration
Installation of a new Gas Range and a new Gas Water Heater on a 7th floor. No change of use, egress or occupancy.
M00267131-P3
06/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hamidreza Saghari
05/24/2022
Objection raised — Other
05/24/2022
Objection resolved — Addressed
05/10/2022
Objection raised — Other
05/10/2022
Objection resolved — Addressed
05/10/2022
Objection raised — Other
05/10/2022
Objection resolved — Addressed
05/05/2022
Filed — Alteration
REPAIR DETERIORATED AREAS OF BUILDING'S WEST AND SOUTH FACADES ONLY, COMPRISING OF REPOINTING, BRICK REPAIR AND REPLACEMENT ALONG WITH BROKEN STONE REPAIRS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00688411-I1
05/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT GODWIN
11/01/2021
Cycle 9 facade report submitted
10/23/2021
Cycle 9 facade report signed — SWARMP
10/22/2021
Cycle 9 facade inspection completed
08/09/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2021
Permit issued — Plumbing
M00402343-I1-PL
05/26/2021
Permit issued — Plumbing
M00267131-I1-PL
05/06/2021
Signed off — Alteration
M00453433-I1
04/27/2021
Filed — Alteration
PROVIDE NEW VRF SYSTEM WITH ASSOCIATED DUCTWORK, PIPING, AND CONTROLS. NEW ROOFTOP UNIT ON EXISTING DUNNAGE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00448188-I1
04/26/2021
Filed — Alteration
Installation of a new Gas Range and a new Gas Water Heater on a 7th floor. No change of use, egress or occupancy.
M00267131-P2
04/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
04/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
04/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT GODWIN
04/01/2021
Violation issued (HPD, closed)
A
02/10/2021
Permit issued — General Construction
M00453433-I1-GC
01/22/2021
Filed — Alteration
INSTALLATION OF THE COMBO BOILER ON 5TH FLOOR AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00402343-I1
01/19/2021
Filed — Alteration
M00453433-I1
01/06/2021
Special inspection requirement — Mechanical Systems
01/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/06/2021
Special inspection requirement — Final
10/08/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
10/02/2020
Filed — Alteration
Installation of a new Gas Range and a new Gas Water Heater on a 7th floor. No change of use, egress or occupancy.
M00267131-P1
09/22/2020
Cycle 9 facade report submitted
09/22/2020
Cycle 9 facade report signed — SWARMP
08/12/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT GODWIN
08/01/2020
Cycle 9 facade inspection completed
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFX CONSTRUCTION06/25/2025
DOB NOWGeneral ConstructionSigned-offURBAN D.C. INC09/13/2023
DOB NOWPlumbingPermit IssuedEDWARD FITZSIMMONS06/09/2021
DOB NOWPlumbingSigned-offEDWARD FITZSIMMONS05/26/2021
DOB NOWGeneral ConstructionSigned-offPRECISE RENOVATION INC02/10/2021
DOB NOWSidewalk ShedPermit IssuedEMPIRE CONSTRUCTION ASSOC03/03/2020
DOB NOWPlumbingSigned-offEDWARD FITZSIMMONS01/13/2020
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION01/09/2019
BISOTISSUEDURBAN D.C. INC05/25/2023
BISOTISSUEDURBAN D.C. INC03/06/2023
BISOTISSUEDURBAN D.C. INC08/11/2022
BISSPISSUEDGO PRO FIRE PROTECTION C11/18/2020
BISSPISSUEDORBIT SPRINKLER CORP11/06/2020
BISPLISSUEDORBIT PLBG & HTG INC11/06/2020
BISOTISSUEDPRECISE RENOVATION INC07/13/2020
BISOTISSUEDALLIANCE CONTRACTING GROUP NY07/09/2020
BISMHISSUEDCORNERSTONE MECHANICAL IN06/25/2020
BISOTISSUEDALLIANCE CONTRACTING GROUP NY02/26/2020
BISMHISSUEDA & W CERTIFIED COOL SYST09/23/2019
BISPLISSUEDORBIT PLBG & HTG INC05/13/2019
BISOTISSUEDNAX CONSTRUCTION INC03/07/2019
BISSPISSUEDGO PRO FIRE PROTECTION C02/28/2019
BISOTISSUEDPRECISE RENOVATION INC11/02/2018
BISOTISSUEDPRECISE RENOVATION INC11/02/2018
BISPLISSUEDNEW AMSTERDAM PLBG & HTG08/21/2018
BISEQISSUEDSTEEL SYSTEMS LLC06/06/2018
BISOTISSUEDALLIANCE CONTRACTING GROUP NY03/29/2018
BISOTISSUEDALLIANCE CONTRACTING GROUP NY03/29/2018
BISEQISSUEDSTEEL SYSTEMS LLC03/29/2018
BISOTISSUEDNAX CONSTRUCTION INC03/09/2018
BISOTISSUEDALLIANCE CONTRACTING GROUP NY10/17/2017
BISEQISSUEDSTEEL SYSTEMS LLC04/05/2017
BISOTISSUEDALLIANCE CONTRACTING GROUP NY03/27/2017
BISEQISSUEDSTEEL SYSTEMS LLC03/17/2017
BISOTISSUEDNAX CONSTRUCTION INC03/13/2017
BISOTISSUEDALLIANCE CONTRACTING GROUP NY04/11/2016
BISEQISSUEDSTEEL SYSTEMS LLC04/07/2016
BISEQISSUEDSTEEL SYSTEMS LLC04/05/2016
BISOTISSUEDNAX CONSTRUCTION INC03/15/2016
BISOTISSUEDNAX CONSTRUCTION INC03/15/2016
+ 4 more permits on file
2 projects · most recent 06/03/2025
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2025Signed-offFX CONSTRUCTION LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEAD-A18AA9 18,000 BTU · Vrf Indoor ×2
MXZ-SM36NAMHZ2 18,000 BTU · Heat Pump Outdoor ×1
04/27/2021——Air Conditioning Systems
Cooling
Mitsubishi Electric SVZ-KP 12NA 12,000 BTU · Fan Coil Indoor ×2
MXZ-8C60NA2-U1 60,000 BTU · Vrf Outdoor ×1
SEZ-KD 18NA4R1, TH 17,200 BTU · Vrf Indoor ×1
1 project · most recent 01/22/2021
Gas
FiledStatusContractorScope
01/22/2021Permit IssuedNEW AMSTERDAM PLBG & HTGGas
8 projects · most recent 12/25/2025
General Wiring
FiledStatusContractorScope
12/25/2025CompleteZIN ELECTRICAL, INCGeneral Wiring
10/23/2025Permit IssuedCENTURY ELECTRIC LLCGeneral Wiring
03/25/2021CompleteP & Z ELECTRIC CORP—
01/11/2021CompleteP & Z ELECTRIC CORPGeneral Wiring
12/04/2020CompleteANTONIO CERIELLO ELEC INC—
02/27/2020Permit IssuedRICHARD NEU—
01/07/2019CompleteSTEVEN FARKAS—
12/14/2017Permit IssuedSTABILITY ELEC ENTERP INCGeneral Wiring
1 project · most recent 03/09/2025
Wood
FiledStatusContractorScope
03/09/2025Signed-offURBAN D.C. INCWood
1 project · most recent 02/26/2020
Sidewalk Shed
FiledStatusContractorScope
02/26/2020Permit IssuedG.N. CONSTRUCTION INCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/15/2022Pass-Final PL Permit WithdrawalPassView ↗
08/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/16/2025FinalABBAS SHAHprogress
05/16/2025MasonryABBAS SHAHspecial
05/01/2025Mechanical SystemsSteven Cummingsspecial
05/01/2025FinalSteven Cummingsprogress
06/06/2022FinalABBAS SHAHprogress
06/01/2022Fire-Resistant Penetrations and JointsHamidreza Sagharispecial
05/02/2022Fire-Resistant Penetrations and JointsROBERT GODWINspecial
04/20/2021HVAC-R and service water heating equipment—energy_progress
04/20/2021HVAC-R and service water heating system controls—energy_progress
04/09/2021Fire-Resistant Penetrations and JointsROBERT GODWINspecial
01/06/2021Mechanical Systems—special
01/06/2021Fire-Resistant Penetrations and Joints—special
01/06/2021Final—progress
10/08/2020Fire-Resistant Penetrations and JointsCARL HAMANNspecial
08/12/2020Fire-Resistant Penetrations and JointsROBERT GODWINspecial
01/08/2019FinalEric Fosterprogress
▾Documents — 499 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00267131-P2Request digital key ↗
09/05/2026M00267131-I1Request digital key ↗
09/04/2026M00402343-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch4
08/24/2026M00688411-S1Request digital key ↗
08/24/2026M00688411-P1Request digital key ↗
08/23/2026M01219068-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00116816-I1Request digital key ↗
08/15/2026M00314160-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/03/2026M00448188-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00453433-I1Request digital key ↗
▸Applications & Permits115
▸BISPLAN / WORK APPROVAL APPLICATION68
07/03/2025122636497Open ↗
07/03/2025123595528Open ↗
08/12/2022122996534Open ↗
Showing 3 of 68 on file for this type
▸BISWORK PERMIT APPLICATION36
08/12/2022122996534Open ↗
08/09/2022122996534Open ↗
07/13/2020140921509Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWLPC Approval/Permit11
09/05/2026M00267131-I1Open ↗
09/03/2026M00448188-I1Open ↗
08/14/2026M00688411-I1Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications104
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
12/23/2019123388324Open ↗
12/19/2019123737313Open ↗
12/18/2019123388324Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
09/08/2021123388672Open ↗
08/09/2021123388672Open ↗
08/09/2021123388672Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT21
08/31/2020140929235Open ↗
07/09/2020140921509Open ↗
12/23/2019123388324Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/05/2026M00116816-I1Open ↗
09/05/2026M00267131-P3Open ↗
09/05/2026M00267131-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/28/2026M00402343-I1Open ↗
09/16/2026M00267131-I1Open ↗
09/02/2026M01219068-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
08/31/2020140929235Open ↗
07/09/2020140921509Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
08/31/2020140929235Open ↗
07/09/2020140921509Open ↗
Showing 2 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
08/09/2021123388672Open ↗
08/09/2021123388672Open ↗
07/16/2021123388672Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026M01219068-I1Open ↗
08/27/2026M00116816-I1Open ↗
08/25/2026M00688411-I1Open ↗
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
02/06/2020123388333Open ↗
12/24/2019123388333Open ↗
12/23/2019123388324Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING3
09/08/2020123371895Open ↗
07/17/2020123388333Open ↗
Showing 2 of 3 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection25
▸BISTenant Protection Plan and Notes19
12/23/2019123388324Open ↗
12/19/2019123737313Open ↗
12/18/2019123388324Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWTenant Protection Plan6
09/05/2026M00267131-I1Open ↗
08/13/2026M00267131-P1Open ↗
08/13/2026M00314160-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos24
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
08/31/2020140929235Open ↗
07/09/2020140921509Open ↗
Showing 2 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00267131-P3Open ↗
09/05/2026M00267131-P2Open ↗
09/05/2026M00267131-P1Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
12/23/2019123388324Open ↗
12/19/2019123737313Open ↗
12/18/2019123388324Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
09/01/2021123388324Open ↗
06/28/2021123737313Open ↗
06/28/2021123737313Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/09/2020140921509Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
01/05/2021140921509Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/24/2021123388333Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00453433-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY17
09/01/2021123388324Open ↗
08/09/2021123388672Open ↗
08/09/2021123388672Open ↗
Showing 3 of 17 on file for this type
▸BISMECHANICAL SYSTEMS1
03/21/2022123595528Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs48
▸BISLANDMARKS APPROVAL15
08/31/2020140929235Open ↗
07/09/2020140921509Open ↗
Showing 2 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
07/08/2025122636497Open ↗
03/10/2022123371895Open ↗
09/08/2021123388672Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
03/10/2022123371895Open ↗
08/09/2021123388672Open ↗
08/09/2021123388672Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS SIGNOFF6
05/22/2025122636497Open ↗
08/24/2021123388672Open ↗
06/28/2021123388333Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
08/12/2022122996534Open ↗
Showing 1 of 3 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
05/21/2025123595528Open ↗
03/21/2022122636497Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
02/06/2020123388324Open ↗
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT29
09/01/2021123388324Open ↗
08/31/2021123388672Open ↗
08/31/2021123388672Open ↗
Showing 3 of 29 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
03/21/2022123595528Open ↗
03/21/2022122636497Open ↗
03/07/2022123371895Open ↗
Showing 3 of 6 on file for this type
▸BISWELDERS AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms58
▸BISBOROUGH INTAKE FORM26
08/09/2022122996534Open ↗
12/20/2019123388324Open ↗
12/20/2019123388324Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION17
08/09/2021123388672Open ↗
09/10/2020123371895Open ↗
08/13/2020123388333Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
08/31/2020140929235Open ↗
07/09/2020140921509Open ↗
Showing 2 of 6 on file for this type
▸Other Documents1
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type