← Back
BuildNYC
Four families
11 REVERE PLACE
BROOKLYN · BIN 3030534
💬 Discuss this project
1897Year Built
3Stories
C3Building Class
R6Zoning
2,502 sfGross Floor Area
4Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Four families · Owner of record: 11 Revere Place · 1,674 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 312p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 1Unit 1IC212p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
Sub-Basement12p · 1 filing · 20 docs
Site & exterior10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brickstone Group607/08/2026
11 Revere Place203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/03/2022$1.0M—Private party → 11 REVERE PLACE LLC$404/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Twig Consulting Engineers305/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM Arch603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Morell BuildersGeneral Contractor303/21/2026
Horbridge Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781305/22/2023
Building Lifecycle
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/10/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/13/2025
FO-21-20b: Failed to properly remove from the premises or seal in place out-of- service fuel-oil storage system(s), in violation of FC5704.2.13 and…
FDNY_ORDER violation · closed
04/11/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
07/14/2023
Signed off — Alteration
EXISTING MULTI FAMILY, FOUR STORY BUILDING WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST, 2ND AND 3RD FLOOR. JOB FILED TO RELATED TO ALT2 APPLICATION #B00786798-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00786798-S1
61 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMorell Builders10/13/2022
DOB NOWPlumbingSigned-offHorbridge Plumbing & Heating10/11/2022
1 project · most recent 09/30/2022
General Wiring
FiledStatusContractorScope
09/30/2022CompleteC & A ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/31/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/06/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
05/23/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/23/2023Mechanical SystemsCHRISTIAN LOZADAspecial
05/23/2023FinalCHRISTIAN LOZADAprogress
05/23/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
05/23/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
05/23/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
05/23/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
05/23/2023Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
05/23/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
05/23/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
05/23/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
05/23/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
05/23/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
05/23/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
05/23/2023Lighting controlsCHRISTIAN LOZADAenergy_progress
05/23/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
05/23/2023MeteringCHRISTIAN LOZADAenergy_progress
05/18/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/18/2023Mechanical SystemsCHRISTIAN LOZADAspecial
05/18/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
05/18/2023FinalCHRISTIAN LOZADAprogress
05/18/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
05/18/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
05/18/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
05/18/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
Latest 25 of 40.
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account