Roof5p · 2 filings · 20 docs
GeneralPlumbing
RENOVATIONS AND COMBINATION OF APT 6JH-E AS PER TPPN #3/97. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
22 documents · 1 drawing sheet
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 4 drawing sheets
Floor 175p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction
Minor demolition and general construction for the combination of apartments 17EW and 17FW as well as the redimising of apartment 17CW as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
23 documents
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 162p · 2 filings · 20 docs
GeneralPlumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
THE COMBINATION OF TWO APARTMENTS BY THE REMOVAL OF ONE OF THE APARTMENT(#16EW) COOKING EQUIPMENT(RESIDENTIAL). INSTALLATION OF NEW (1) WASHING MACHINE IN LAUNDRY ROOM. NO OTHER CHANGES TO EITHER APARTMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 15Under Construction9p · 2 filings · 20 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
PROPOSED PLUMBING WORK IN CONJUNCTION TO THE GENERAL CONSTRUCTION WORK, REPLACEMENT OF PL FIXTURES AND INSTALL NEW PL FIXTURES. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
14 documents
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 143p · 2 filings · 20 docs
ArchitectureDMPlumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Renovation of apartment 14AE on the 14th floor. No change in use, egress, or occupancy.
On file for this project
8 documents · 2 drawing sheets
Floor 131p · 1 filing · 20 docs
Plumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 121p · 1 filing · 20 docs
Plumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 111p · 1 filing · 20 docs
Plumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 102p · 2 filings · 20 docs
MechanicalPlumbing
Filing for the plumbing work in conjunction with the interior renovation work.
On file for this project
12 documents · 1 drawing sheet
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 9Under Construction15p · 4 filings · 20 docs
ArchitectureDMGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
Interior renovation of existing apartment (9G). No change to use, occupancy, or egress.
On file for this project
14 documents
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Replacement of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 83p · 3 filings · 20 docs
ArchitectureElectricalMechanicalPlumbingOther
Filing for the plumbing work in conjunction with the interior renovation at the apt#8EW.
On file for this project
24 documents · 1 drawing sheet
MINOR PLUMBING WORK ASSOCIATED WITH APARTMENT 8AE AND 8BE COMBINATION AND RENOVATION WORK. WORK INVOLVES FIXTURES AND ASSOCIATED PIPING. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this project
15 documents · 1 drawing sheet
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 7Under Construction9p · 3 filings · 20 docs
ArchitectureDMGeneralPlumbingOther
Issued Permit Scope
Plumbing
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
17 documents · 6 drawing sheets
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Interior Apartment Combination to include partitions and finishes as per plans filed herewith. No change to use, egress or occupancy,
On file for this project
23 documents · 2 drawing sheets
Floor 68p · 3 filings · 20 docs
ArchitectureDMPlumbing
INTERIOR RENOVATION: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT LIGHT FIXTS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
On file for this project
5 documents · 3 drawing sheets
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 5 drawing sheets
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 519p · 4 filings · 20 docs
ArchitectureDMGeneralPlumbing
PL WORK IN THE COMBINIATION OF APTS 5BW & 5CW FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE , OOCUPANCY OR EGRESS.
On file for this project
8 documents · 6 drawing sheets
RENOVATE APARTMENT 5FE ON THE 5 TH FLOOR AS PERARCHITECTURAL PLANS. PLUMBING WORK FILED AS SUBSEQUENTAPPLICATION AS PER PLUMBING PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 10 drawing sheets
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 41p · 1 filing · 20 docs
Plumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 31p · 1 filing · 20 docs
Plumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Floor 23p · 3 filings · 20 docs
ArchitecturePlumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
PLUMBING WORK INCLUDING REPLACEMENT OF THE EXISTING BATHTUB, LAVATORY, TOILET, GAS RANGE AND RELOCATION OF THE EXISTING KITCHEN SINK AND DISHWASHER.
On file for this project
5 documents · 1 drawing sheet
INTERIOR APARTMENT RENOVATION AT 2ND FLOOR, APT. #2UW, INCLUDING KITCHEN, BATHROOM RENOVATIONS AND NEW FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Floor 12p · 1 filing · 20 docs
Plumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 2 drawing sheets
Cellar17p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems
INSTALLATION OF NEW AIR CONDITIONING SYSTEM AND VENTILATION FOR EAST LAUNDRY ROOM, WEST LAUNDRY ROOM AND LIBRARY. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
12 documents
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 1 drawing sheet
Sub-CellarUnder Construction1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
Garage Repairs as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents
Basement9p · 1 filing · 20 docs
Plumbing
GAS INFRASTRUCTURE TESTING, REPAIRS,AND ALTERATIONS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
98 documents · 9 drawing sheets