ECB08/06/2021Gas fired stove removed. Gas piping on second floor has no end use as per 404.13 fgc, repair and/replace$6K due
ECB06/03/2020Failure to comply with the commissioner's order contained in summons/violation#35323424H issued on 5/2/18 and to file a certificate of correction pursuant to 28-201.1 and 1RCNY 102-01.for:work without a permit$6K due
ECB01/27/2020Work does not conform to approved construction documents and/or approved amendments. Premises under alt-2 job#520370795,at the time of inspection found following non conforming works (1)framing method to constr$6K due
ECB01/02/2020Failure to comply w/the comm's order contained in summons/vio#35323424H issued on 05-02-18 & to file a c of c pursuant to 28-201.1 & 1RCNY 102-01. Remedy: comply w/comm's order &/or file a c of c.$1K due
ECB06/19/2019Failure to maintain bld.wall(s)or appurtenances.note:at time of inspection,@frontwall,there is temporary bracing holding the patio,and roof above.this bracing may not be approved and suitable for the job.the ch$6K due
ECB06/19/2019Failure to comply with the commissioner's order contained in summons/violation#35323424H issued on 5/2/18 & to file a cert.of correction pursuant to 28-201.1 and 1RCNY 102-01.rem:comply with commissioner's o$6K due
ECB04/12/2019Failure to comply w/the comm's order contained in summons/vio#35323424H issued on 05-02-18 & to file a c of c pursuant to 28-201.1 & 1RCNY 102-01. Remedy: comply w/comm's order &/or file a c of c.$10K due
ECB04/12/2019Failure to maintain bldg walls or appurtenances. Noted: at time of inspection,the chimney @ roof is cracked,missing bricks & seems in risk of collapsed. The front porch & roof above porch at both levels is lean$25K due
ECB02/20/2019Failure to maintain bldg walls or appurtenances. Noted: at roof level the chimnet is cracked an missing bricks. Also at the front of bldg the porch part of the roof is leaning. Remedy: maintain exterior bldg wa$6K due
ECB12/10/2018Failure to maintain building walls or appurtenances.noted: at time of inspection the chimney a roof level is cracked missing bricks and needs repair.also at front of building the porch @ 2ND floor level$25K due
ECB09/26/2018Failure to comply with the commissioners order contained in summons/violation#35323424H issued on 05/02/18 and to file a certificate of correction pursuant to 28-201.1 and 1RCNY 102-01.for work w/o permit.rem:$6K due
ECB09/26/2018Failure to maintain building walls or appurtenances.noted:at roof,chimney is in disrepair with missing/loose bricks and mortar.also,the balcony is being leaning at 2ND flr and supported by temporary wood frame,$6K due
ECB08/10/2018Reissue #35342037L issued 06/28/18.failure to maintain building walls or appurtenances in code compliant manner.noted:at roof chimney is in disrepair with missing/loose bricks and mortar at exp 1 2ND fl roof ov$6K due
ECB08/10/2018Failure to comply with the commissioners order contained in summons/violation #35323424H issued on 05/02/18 and to file a certificate of correction pursuant to 28-201.1 and 1RCNY 102-01.work without a permit.re$6K due
ECB06/29/2018Failure to comply with the commissioner's order contained in summons/violation #35323424H issued 05/02/18 and to file a certificate of correction pursuant to 28-201.1 and 1RCNY 102-01. Work without a permit. (a$2K due
ECB06/28/2018Failure to maintain building wall(s) or appurtenances in code-compliant manner. Noted: chimney is in total disrepair with missing bricks and missing mortar. 2ND floor roof over 2ND fl porch is sagging being sup$6K due
ECB05/02/2018Work w/o permits.wok noted at front exp 1 observed units of shoring-1 st flr entry w/wood shoring in place to support 2ND flr balcony-2ND flshoring in place to support attic levle w/2 end columns cracked,splitt$8K due
ECB05/02/2018Failure to maintain bldg walls or appurtenances.chimney isn total disrepair w/bricks loose &missing mortars-front 2ND fl-roofline **sagging-beng supported by temporary storing which was erected w/o permits addl$12K due
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB10/27/2021Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2021; DOB's record still lists it as active
DOB09/19/2019Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2019; DOB's record still lists it as active
DOB07/09/2019Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2019; DOB's record still lists it as active
DOB05/16/2019Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2019; DOB's record still lists it as active
DOB03/06/2019Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2019; DOB's record still lists it as active
DOB01/09/2019Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2019; DOB's record still lists it as active
DOB10/31/2018Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2018; DOB's record still lists it as active
DOB09/19/2018Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2018; DOB's record still lists it as active
DOB07/25/2018Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2018; DOB's record still lists it as active2 identical filings