← Back
BuildNYC
Elevator cooperative
11 SCHERMERHORN STREET
BROOKLYN · Brooklyn Heights · BIN 3002613
💬 Discuss this project
1914Year Built
6Stories
D4Building Class
R6Zoning
31,920 sfGross Floor Area
29Units
LL97 CoveredRent Stabilized3 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 11 Schemerhorn St Apt · 7,520 sf lot · 4.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLimited exterior repair12p · 1 filing · 8 docs
Floor 611 Schermerhorn ST. APT. CORP.11p · 2 filings · 14 docs
Floor 511 Schermerhorn ST. APT. CORP.11p · 2 filings · 14 docs
Floor 411 Schermerhorn ST. APT. CORP.11p · 2 filings · 14 docs
Floor 311 Schermerhorn ST. APT. CORP.11p · 2 filings · 14 docs
Floor 211 Schermerhorn ST. APT. CORP.11p · 2 filings · 14 docs
Floor 111 Schermerhorn ST. APT. CORP.15p · 3 filings · 18 docs
CellarSolstice Residential Group, LLC2p · 2 filings · 20 docs
Site & exteriorLimited exterior repair24p · 5 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
11 Schermerhorn Apartment3207/08/2026
Solstice Residential Group2107/08/2026
Andrews Organization103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SW Engineering Company202/11/2025
Robert Germain Jr. PE703/19/2024
Rigid Structural Design103/15/2024
Revans Design PE103/19/2020
KZ Engineering206/17/2019
Gurvinder Singh204/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants203/21/2026
Boyd Consulting403/21/2026
AE Design Solution203/21/2026
Rigid Structural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ceprine ConstructionScaffold507/08/2026
C C Controlled CombustionGeneral Contractor307/08/2026
Bayside ContractingGeneral Contractor307/08/2026
Demar PlumbingPlumbing207/08/2026
DelucGeneral Contractor203/21/2026
Everest ScaffoldingGeneral Contractor203/21/2026
Kings Group NYScaffold207/08/2026
CC Controlled PlumbingPlumbing207/08/2026
Palm Home ImprovementGeneral Contractor103/21/2026
R A SomerbyGeneral Contractor103/21/2026
Millennium Plumbing & HeatingPlumbing103/21/2026
Gustave Dileo, JRElectrical103/21/2026
Croom Plumbing and HeatingPlumbing108/26/1993
EZ Runer ConstructionGeneral Contractor112/17/2018
EZ Runer ConstructionPlumbing112/17/2018
Reliable Plumbing & HeatingPlumbing210/04/1995
R Schneider General ContractingGeneral Contractor110/30/2002
Wolf RestorationsGeneral Contractor212/20/2006
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL Engineering Inspectio6912202/11/2025
Robert F. Germain Jr. PE5100703/19/2024
Revans Design PE4617103/19/2020
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/19/2026
Elevator Category 1 inspection report filed
07/27/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
07/29/2025
Closed: Failure to file 2020 external low pressure inspection
DOB violation · closed on the city's record
137 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBayside Contracting11/19/2024
DOB NOWSuspended ScaffoldPermit IssuedSirak Construction09/04/2024
DOB NOWGeneral ConstructionSigned-offBayside Contracting04/10/2024
DOB NOWSuspended ScaffoldPermit IssuedSirak Construction04/10/2024
DOB NOWSidewalk ShedSigned-offCeprine Construction03/18/2024
DOB NOWGeneral ConstructionSigned-offC C Controlled Combustion01/18/2024
DOB NOWGeneral ConstructionSigned-offC C Controlled Combustion06/30/2023
DOB NOWPlumbingSigned-offCC Controlled Plumbing06/30/2023
DOB NOWBoiler EquipmentSigned-offCC Controlled Plumbing06/30/2023
DOB NOWPlumbingPermit IssuedDemar Plumbing03/31/2021
DOB NOWPlumbingPermit IssuedDemar Plumbing03/24/2020
DOB NOWSupported ScaffoldSigned-offCeprine Construction06/17/2019
DOB NOWSidewalk ShedSigned-offCeprine Construction06/13/2019
DOB NOWSupported ScaffoldSigned-offKings Group NY04/24/2019
DOB NOWSidewalk ShedSigned-offKings Group NY04/19/2019
BISOTISSUEDPalm Home Improvement02/11/2020
BISPLISSUEDEZ Runer Construction12/17/2018
BISOTISSUEDEZ Runer Construction12/17/2018
BISPLISSUEDDemar Plumbing09/29/2015
BISOTISSUEDR.A. Somerby03/25/2015
BISPLISSUEDDemar Plumbing12/16/2013
BISOTISSUEDR.A. Somerby12/11/2013
BISOTISSUEDR.A. Somerby09/09/2013
BISEQISSUEDEverest Scaffolding04/17/2013
BISOTISSUEDDeluc04/03/2013
BISOTISSUEDDeluc03/15/2011
BISOTISSUEDDeluc09/24/2010
BISEQISSUEDEverest Scaffolding01/22/2007
BISOTISSUEDWolf Restorations12/20/2006
BISOTISSUEDWolf Restorations09/18/2006
BISEQISSUEDEverest Scaffolding07/07/2006
BISPLISSUEDMillennium Plumbing & Heating01/13/2003
BISOTISSUEDR Schneider General Contracting10/30/2002
BISFSRE-ISSUEDCourt Oil Heating05/15/1996
BISPLISSUEDReliable Plumbing & Heating10/04/1995
BISBLRE-ISSUEDReliable Plumbing & Heating10/04/1995
BISPLISSUEDCroom Plumbing and Heating08/26/1993
BISOTISSUEDPhoenix Combustion08/04/1993
11 projects · most recent 03/07/2024
General Wiring Boiler Controls
FiledStatusContractorScope
03/07/2024CompleteBorowide Elect'l Contractors—
08/29/2023CompleteKraft ElectricBoiler Controls
12/13/2020CompleteMeir ElectricGeneral Wiring
07/19/2020CompleteJ.S.V. ElectricGeneral Wiring
11/26/2019Permit IssuedSchwartz Electric ContractorsGeneral Wiring
11/26/2019CompleteCRM ElectricGeneral Wiring
07/10/2019CompleteAMC Electrical Services—
07/10/2019CompleteJte Electrical Services—
06/07/2019CompleteV. Vass Electric—
04/15/2019Permit IssuedWCK Electric—
12/23/2018Permit IssuedLektric InstallationsGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2023Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
02/14/2024Tenant Protection Plan Compliance—special
02/14/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/17/2023Tenant Protection Plan ComplianceRobert Germain Jr.special
11/17/2023HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
11/17/2023HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
11/17/2023HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
11/17/2023FinalRobert Germain Jr.progress
11/17/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/17/2023Chimneys and ventsRobert Germain Jr.special
11/17/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/17/2023Tenant Protection Plan ComplianceRobert Germain Jr.special
06/07/2019FinalKarol Zdancewiczprogress
06/07/2019FinalKarol Zdancewiczprogress
192 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account