← Back
Four families
11 SPENCER PLACE
BROOKLYN · BIN 3057446
💬 Discuss this project
1930Year Built
3Stories
C3Building Class
R6BZoning
2,700 sfGross Floor Area
4Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Four families · Owner of record: 11 SPENCER PLACE LLC · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof16p · 1 filing · 20 docs
Floor 319p · 1 filing · 20 docs
Floor 217p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar17p · 1 filing · 20 docs
Basement18p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
11 SPENCER PLACE LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/09/2025$3.4M—11 SPENCER PLACE LLC → Private party$1,254/sf building
05/05/2021$1.1M—Private party → 11 SPENCER PLACE LLC$407/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA309/11/2025
CHUN ENGINEERING CONSULTANT PLLC204/09/2025
DOYUN KIM; RA108/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor407/08/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415609/11/2025
Building Lifecycle
All (86)Filed (6)Permit Issued (4)Signed Off (1)Violation (34)Inspection (7)Objection (4)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
09/23/2025
Special inspection requirement — Interior lighting power
DOYUN KIM
09/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
09/23/2025
Special inspection requirement — Shutoff dampers
DOYUN KIM
09/23/2025
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
09/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
09/23/2025
Special inspection requirement — Permanent certificate
DOYUN KIM
09/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
09/23/2025
Special inspection requirement — Maintenance information
DOYUN KIM
09/23/2025
Special inspection requirement — Insulation placement and R values
DOYUN KIM
09/23/2025
Special inspection requirement — Final
William Alicea
09/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
09/23/2025
Special inspection requirement — Mechanical Systems
DOYUN KIM
09/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
09/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
09/23/2025
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
09/23/2025
Special inspection requirement — Fenestration areas
DOYUN KIM
09/23/2025
Special inspection requirement — Lighting controls
DOYUN KIM
09/23/2025
Special inspection requirement — Fenestration air leakage
DOYUN KIM
09/11/2025
Filed — Alteration CO
HEREWITH TO PROPOSE NEW GYP BOARD, UPDATE WINDOWS, NEW REAR DECK, UPDATE FINISHES AS PERPLANS. EXISTING 4 STORY DWELLING PROPOSED 2 FAMILY. NO CHANGE IN BULK
B08005150-P3
09/05/2025
Special inspection requirement — Shutoff dampers
DOYUN KIM
09/05/2025
Special inspection requirement — Lighting controls
DOYUN KIM
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
09/05/2025
Special inspection requirement — Fenestration air leakage
DOYUN KIM
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
09/05/2025
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
09/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
09/05/2025
Special inspection requirement — Maintenance information
DOYUN KIM
08/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/18/2025
Signed off — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #B08005150.
B00575777-I1
06/10/2025
Violation issued (HPD, open)
A
04/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2025
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #B08005150.
B00575777-P1
03/31/2025
Objection resolved — Addressed
03/27/2025
Objection raised — Other
03/25/2025
Filed — Alteration CO
HEREWITH TO PROPOSE NEW GYP BOARD, UPDATE WINDOWS, NEW REAR DECK, UPDATE FINISHES AS PERPLANS. EXISTING 4 STORY DWELLING PROPOSED 2 FAMILY. NO CHANGE IN BULK
B08005150-P2
02/18/2025
Permit issued — Plumbing
B00575777-I1-PL
02/05/2025
Permit issued — General Construction
B08005150-I1-GC-CX
11/27/2024
Violation issued (HPD, closed)
I
09/23/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/11/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, closed)
I
10/17/2023
Permit issued — Plumbing
B00575777-I1-PL
09/01/2023
Permit issued — General Construction
B08005150-I1-GC-CX
08/29/2023
Objection resolved — Addressed
08/28/2023
Objection raised — Other
08/24/2023
Filed — Alteration CO
HEREWITH TO PROPOSE NEW GYP BOARD, UPDATE WINDOWS, NEW REAR DECK, UPDATE FINISHES AS PERPLANS. EXISTING 4 STORY DWELLING PROPOSED 2 FAMILY. NO CHANGE IN BULK
B08005150-P1
08/01/2023
Violation issued (HPD, open)
C
03/24/2023
Violation issued (HPD, open)
A
12/08/2022
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #B08005150.
B00575777-I1
11/09/2022
Violation issued (HPD, closed)
I
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC02/18/2025
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO02/05/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/17/2023
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO09/01/2023
2 projects · most recent 08/12/2025
General Wiring
FiledStatusContractorScope
08/12/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/20/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
09/23/2025Interior lighting powerDOYUN KIMenergy_progress
09/23/2025Insulation placement and R valuesDOYUN KIMenergy_progress
09/23/2025Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
09/23/2025Mechanical SystemsDOYUN KIMspecial
09/23/2025Fire-Resistant Penetrations and JointsDOYUN KIMspecial
09/23/2025Concrete - Cast-In-PlaceDOYUN KIMspecial
09/23/2025Fire-Resistance Rated ConstructionDOYUN KIMprogress
09/23/2025FinalWilliam Aliceaprogress
09/23/2025Energy Code Compliance InspectionsDOYUN KIMprogress
09/23/2025Shutoff dampersDOYUN KIMenergy_progress
09/23/2025HVAC-R and service water heating system controlsDOYUN KIMenergy_progress
09/23/2025HVAC-R and service water heating equipmentDOYUN KIMenergy_progress
09/23/2025Permanent certificateDOYUN KIMenergy_progress
09/23/2025Lighting in dwelling unitsDOYUN KIMenergy_progress
09/23/2025Fenestration areasDOYUN KIMenergy_progress
09/23/2025HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
09/23/2025Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
09/23/2025Lighting controlsDOYUN KIMenergy_progress
09/23/2025Fenestration air leakageDOYUN KIMenergy_progress
09/23/2025Maintenance informationDOYUN KIMenergy_progress
09/05/2025Maintenance informationDOYUN KIMenergy_progress
09/05/2025Concrete - Cast-In-PlaceDOYUN KIMspecial
09/05/2025Fire-Resistant Penetrations and JointsDOYUN KIMspecial
09/05/2025Mechanical SystemsDOYUN KIMspecial
09/05/2025Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
Latest 25 of 81.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B00575777-I1Request digital key ↗
08/28/2026B00575777-P1Request digital key ↗
08/20/2026B08005150-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08005150-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B08005150-P3Open ↗
09/01/2026B08005150-P3Open ↗
09/01/2026B08005150-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B00575777-P1Open ↗
08/28/2026B00575777-I1Open ↗
08/20/2026B08005150-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B08005150-P3Open ↗
08/28/2026B00575777-I1Open ↗
08/25/2026B08005150-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist6
08/13/2026B08005150-P3Open ↗
08/13/2026B00575777-I1Open ↗
08/13/2026B08005150-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Tree Checklist4
08/13/2026B08005150-I1Open ↗
08/13/2026B08005150-P3Open ↗
08/13/2026B08005150-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026B00575777-P1Open ↗
08/28/2026B00575777-I1Open ↗
08/20/2026B08005150-P3Open ↗
Showing 3 of 6 on file for this type
▸Other Documents13
▸DOB NOWDHCR Document8
08/13/2026B00575777-P1Open ↗
08/13/2026B08005150-P3Open ↗
08/13/2026B08005150-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026B08005150-P3Open ↗
08/20/2026B08005150-I1Open ↗
08/14/2026B08005150-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B08005150-I1Open ↗