← Back
Two family brick
11 VAN RIPER STREET
STATEN ISLAND · Port Richmond · BIN 5026376
💬 Discuss this project
1965Year Built
2Stories
B1Building Class
R3AZoning
2,318 sfGross Floor Area
2Units
Two family brick · 3,008 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/20/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
02/02/2026
Permit issued — Solar
S01347920-I1-SL
01/20/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01347920-I1
01/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/20/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/16/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/02/2026
1 project · most recent 01/20/2026
FiledStatusContractorScope
01/20/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 01/20/2026
FiledStatusContractorScope
01/20/2026Signed-offSUNRUN INSTALLATION SVC48 panels, 19.68 kw, 505 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/20/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/20/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
01/16/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/16/2026Energy Code Compliance InspectionsWalid Abdullaprogress
01/16/2026FinalWalid Abdullaprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01347920-I1Open ↗
08/25/2026S01347920-I1Open ↗
08/25/2026S01347920-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01347920-I1Open ↗
08/25/2026S01347920-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01347920-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01347920-I1Open ↗