Multi-story retail building (2+)
11 WEST 56 STREET
MANHATTAN · Midtown-Times Square · BIN 1035050
💬 Discuss this project
1920Year Built
5Stories
K2Building Class
C5-PZoning
9,447 sfGross Floor Area
2Units
0 Open Violations
Multi-story retail building (2+) · Owner of record: NR 11 WEST 56TH STREET LLC · 2,477 sf lot · 3.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction47p · 1 filing · 20 docs
Floor 5Under Construction54p · 3 filings · 20 docs
Floor 4Under Construction53p · 3 filings · 20 docs
Floor 3Under Construction54p · 3 filings · 20 docs
Floor 2Under Construction52p · 3 filings · 20 docs
Floor 1Under Construction53p · 3 filings · 20 docs
CellarUnder Construction49p · 2 filings · 20 docs
Sub-Basement1 filing · 17 docs
Site & exterior13p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EMMES REALTY ASSOCIATES AGENT5107/08/2026
NRP LLC I307/08/2026
NR 11 WEST 56 ST303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAM ARCHITECTURE STUDIO, DPC1107/30/2026
SILMAN108/12/2025
RIGID STRUCTURAL DESIGN, LLC305/13/2025
RIP CONSTRUCTION CONSULTANTS108/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL EXPEDITING2203/21/2026
Rigid Structural Design, LLC603/21/2026
RIP CC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ELYSIUM CONSTRUCTION INCGeneral Contractor1007/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor706/28/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
BUCKMILLER AUTO.SPKLR.CORFire Protection107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
ALL CITY REMODELING, INCGeneral Contractor107/08/2026
DENALI ELECTRIC CORPElectrical103/22/2026
ADVANCED PLBG, MECH & SPRFire Protection106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544907/30/2026
Building Lifecycle
All (100)Filed (16)Permit Issued (18)Signed Off (8)Violation (21)Inspection (9)Special Inspection (28)
08/26/2026
Signed off — Alteration
M01075059-I1
08/21/2026
Signed off — Alteration
M01075059-S1
08/18/2026
Signed off — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S1
08/18/2026
Signed off — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-I1
08/18/2026
Signed off — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S3
08/03/2026
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
07/30/2026
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-P3
07/29/2026
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
07/24/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/26/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01192429-I1
06/26/2026
Signed off — Alteration
M01221596-I1
06/10/2026
Permit issued — Sidewalk Shed
M01192429-I1-SH
05/08/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/07/2026
Permit issued — Supported Scaffold
M01221596-I1-SF
03/30/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/13/2026
Permit issued — Sidewalk Shed
M01192429-I1-SH
03/05/2026
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-P2
03/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Final
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/04/2026
Permit issued — Sprinklers
M01213973-S2-PL
03/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2026
Special inspection requirement — Final
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
02/23/2026
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-P1
02/10/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/06/2026
Permit issued — Structural
M01213973-S3-ST
01/06/2026
Permit issued — General Construction
M01213973-I1-GC
01/05/2026
Permit issued — Mechanical Systems
M01213973-S1-MS
10/14/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/21/2025
Permit issued — Sprinklers
M01213973-S2-EW-SP
08/20/2025
Permit issued — Plumbing
M01213973-S2-PL
08/18/2025
Permit issued — General Construction
M01213973-I1-GC
08/18/2025
Permit issued — Mechanical Systems
M01213973-S1-MS
08/15/2025
Permit issued — Structural
M01213973-S3-ST
08/12/2025
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S3
08/11/2025
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S1
08/11/2025
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S2
08/06/2025
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-I1
08/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
08/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
08/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
08/06/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
08/06/2025
Special inspection requirement — Electrical motors and elevators
EUGENE BIFULCO
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
05/13/2025
Filed — Alteration
M01221596-I1
05/13/2025
Permit issued — Supported Scaffold
M01221596-I1-SF
04/22/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
04/22/2025
Special inspection requirement — Final
EUGENE BIFULCO
04/02/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01192429-P1
03/12/2025
Permit issued — Sidewalk Shed
M01192429-I1-SH
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/10/2026
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC05/07/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/13/2026
DOB NOWSprinklersPermit IssuedADVANCED PLUMBING MECH03/04/2026
DOB NOWStructuralSigned-offELYSIUM CONSTRUCTION INC01/06/2026
DOB NOWGeneral ConstructionSigned-offELYSIUM CONSTRUCTION INC01/06/2026
DOB NOWMechanical SystemsSigned-offELYSIUM CONSTRUCTION INC01/05/2026
DOB NOWSprinklersPermit IssuedADVANCED PLBG, MECH & SPR08/21/2025
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH08/20/2025
DOB NOWGeneral ConstructionSigned-offELYSIUM CONSTRUCTION INC08/18/2025
DOB NOWMechanical SystemsSigned-offELYSIUM CONSTRUCTION INC08/18/2025
DOB NOWStructuralSigned-offELYSIUM CONSTRUCTION INC08/15/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC05/13/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/12/2025
DOB NOWGeneral ConstructionSigned-offELYSIUM CONSTRUCTION INC01/15/2025
DOB NOWGeneral ConstructionSigned-offELYSIUM CONSTRUCTION INC09/16/2024
DOB NOWSprinklersSigned-offBUCKMILLER AUTO.SPKLR.COR09/10/2024
DOB NOWGeneral ConstructionSigned-offALL CITY REMODELING, INC09/06/2022
BISEQISSUEDUNIVERSAL BUILD SUPP LLC11/21/2022
BISEQISSUEDUNIVERSAL BUILD SUPP LLC11/30/2021
BISEQISSUEDUNIVERSAL BUILD SUPP LLC12/21/2020
BISEQISSUEDUNIVERSAL BUILD SUPP LLC01/07/2020
BISEQISSUEDUNIVERSAL BUILD SUPP LLC01/09/2019
BISEQISSUEDEVEREST SCAFFOLDING INC05/27/2015
BISEQISSUEDEVEREST SCAFFOLDING INC05/26/2015
BISEQISSUEDATLANTIC HEYDT SCAFFOLD CORP01/22/1999
BISEQISSUEDATLANTIC HEYDT CORP11/20/1998
BIS—ISSUEDNORMA KAMALI ,INC.05/11/1992
1 project · most recent 07/30/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2026Signed-offELYSIUM CONSTRUCTION INCAir Conditioning Systems
Cooling
Friedrich SH20M30B 21,000 BTU · Ptac ×1
1 project · most recent 07/30/2026
Sprinkler System
FiledStatusContractorScope
07/30/2026Permit IssuedADVANCED PLBG, MECH & SPRSprinkler System
1 project · most recent 07/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedADVANCED PLUMBING MECHGas, Storm, Water/Sanitary
3 projects · most recent 11/10/2025
General Wiring
FiledStatusContractorScope
11/10/2025Permit IssuedEXECUTIVE ELECTL SER INCGeneral Wiring
08/19/2025Permit IssuedDENALI ELECTRIC CORP—
03/06/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
1 project · most recent 07/30/2026
Steel Concrete
FiledStatusContractorScope
07/30/2026Permit IssuedADVANCED PLUMBING MECHSteel, Concrete
1 project · most recent 04/02/2025
Sidewalk Shed
FiledStatusContractorScope
04/02/2025Signed-offANDAMIO SCAFFOLDING LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/24/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/08/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/30/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/14/2025Pass-Final PL - UndergroundPassView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/03/2026Sprinkler SystemsEUGENE BIFULCOspecial
07/29/2026Sprinkler SystemsEUGENE BIFULCOspecial
03/05/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/05/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/05/2026FinalEUGENE BIFULCOprogress
03/05/2026Lighting controlsEUGENE BIFULCOenergy_progress
03/05/2026Interior lighting powerEUGENE BIFULCOenergy_progress
03/05/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
03/02/2026FinalEUGENE BIFULCOprogress
03/02/2026Lighting controlsEUGENE BIFULCOenergy_progress
03/02/2026Interior lighting powerEUGENE BIFULCOenergy_progress
03/02/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
03/02/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/02/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
08/06/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
08/06/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
08/06/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
08/06/2025Maintenance informationEUGENE BIFULCOenergy_progress
08/06/2025Electrical motors and elevatorsEUGENE BIFULCOenergy_progress
08/06/2025Energy Code Compliance InspectionsEUGENE BIFULCOprogress
04/22/2025Mechanical SystemsEUGENE BIFULCOspecial
04/22/2025FinalEUGENE BIFULCOprogress
02/21/2025FinalROSS ADAM COLE BRISKMANprogress
02/10/2025FinalROSS ADAM COLE BRISKMANprogress
09/27/2024Sprinkler SystemsEUGENE BIFULCOspecial
Latest 25 of 28.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026M01075059-P1Request digital key ↗
08/26/2026M01075059-P2Request digital key ↗
08/26/2026M01075059-P3Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION5
12/21/2020140818578Open ↗
01/08/2020140818578Open ↗
01/08/2019140818578Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
03/01/2024102239427Open ↗
03/01/2024101983588Open ↗
01/08/2019140818578Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026M01075059-P1Open ↗
08/26/2026M01075059-P2Open ↗
08/26/2026M01075059-P3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026M01213973-S1Open ↗
09/23/2026M01213973-S1Open ↗
08/31/2026M01213973-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01213973-S1Open ↗
08/31/2026M01213973-I1Open ↗
08/29/2026M01075059-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/08/2019140818578Open ↗
05/22/2015140351982Open ↗
05/21/2015140351492Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/08/2019140818578Open ↗
05/22/2015140351982Open ↗
05/21/2015140351492Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/08/2019140818578Open ↗
05/22/2015140351982Open ↗
05/21/2015140351492Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/05/2015140351492Open ↗
08/05/2015140351982Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/26/2026M01075059-I1Open ↗
08/26/2026M01075059-S1Open ↗
08/19/2026M01213973-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/22/2015140351982Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00796016-I1Open ↗
▸Energy Compliance1
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/21/2015140351492Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/11/2023140818578Open ↗
09/11/2023140818578Open ↗
01/08/2019140818578Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/01/2024102239427Open ↗
03/01/2024101983588Open ↗
09/12/2023140818578Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET3
01/08/2019140818578Open ↗
05/22/2015140351982Open ↗
05/21/2015140351492Open ↗