← Back
BuildNYC
Multi-story retail building (2+)
11 WEST 56TH STREET
MANHATTAN · BIN 1035050
💬 Discuss this project
1920Year Built
5Stories
K2Building Class
C5-PZoning
9,447 sfGross Floor Area
2Units
0 Active Violations
Multi-story retail building (2+) · Owner of record: NR 11 West 56th Street · 2,477 sf lot · 3.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEmmes Realty Services, LLCUnder Construction41p · 1 filing · 20 docs
BulkheadEmmes Realty Services, LLCUnder Construction2p · 1 filing · 20 docs
Floor 5Emmes Realty Services, LLCUnder Construction47p · 3 filings · 20 docs
Floor 4Emmes Realty Services, LLCUnder Construction48p · 3 filings · 20 docs
Floor 3Emmes Realty Services, LLCUnder Construction50p · 3 filings · 20 docs
Floor 2Emmes Realty Services, LLCUnder Construction46p · 3 filings · 20 docs
Floor 1Emmes Realty Services, LLCUnder Construction47p · 3 filings · 20 docs
CellarEmmes Realty Services, LLCUnder Construction43p · 2 filings · 20 docs
BasementEmmes Realty Services, LLCUnder Construction5p · 2 filings · 20 docs
Sub-BasementEmmes Realty Services, LLC1 filing · 17 docs
Site & exteriorEmmes Realty Associates. Agent13p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Emmes Realty Associates Agent5107/08/2026
NRP LLC I307/08/2026
NR 11 West 56 St303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bam Architecture Studio1107/30/2026
Silman108/12/2025
Rigid Structural Design305/13/2025
Rip Construction Consultants108/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Expediting2203/21/2026
Rigid Structural Design603/21/2026
Rip CC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Elysium ConstructionGeneral Contractor1007/08/2026
Andamio ScaffoldingScaffold706/28/2026
Advanced Plumbing MechanicalPlumbing207/08/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection106/27/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Buckmiller Automatic SprinklerFire Protection107/08/2026
Denali ElectricElectrical103/22/2026
All City RemodelingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544907/30/2026
Building Lifecycle
All (95)Filed (16)Permit Issued (18)Signed Off (8)Violation (21)Inspection (4)Special Inspection (28)
09/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/26/2026
Signed off — Alteration
M01075059-I1
08/21/2026
Signed off — Alteration
M01075059-S1
08/18/2026
Signed off — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S1
08/18/2026
Signed off — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-I1
08/18/2026
Signed off — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S3
08/03/2026
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
07/30/2026
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-P3
07/29/2026
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
06/26/2026
Signed off — Alteration
M01221596-I1
06/26/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01192429-I1
06/10/2026
Permit issued — Sidewalk Shed
M01192429-I1-SH
05/07/2026
Permit issued — Supported Scaffold
M01221596-I1-SF
03/30/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/13/2026
Permit issued — Sidewalk Shed
M01192429-I1-SH
03/05/2026
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-P2
03/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Final
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/04/2026
Permit issued — Sprinklers
M01213973-S2-PL
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Final
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
02/23/2026
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-P1
01/06/2026
Permit issued — Structural
M01213973-S3-ST
01/06/2026
Permit issued — General Construction
M01213973-I1-GC
01/05/2026
Permit issued — Mechanical Systems
M01213973-S1-MS
08/21/2025
Permit issued — Sprinklers
M01213973-S2-EW-SP
08/20/2025
Permit issued — Plumbing
M01213973-S2-PL
08/18/2025
Permit issued — General Construction
M01213973-I1-GC
08/18/2025
Permit issued — Mechanical Systems
M01213973-S1-MS
08/15/2025
Permit issued — Structural
M01213973-S3-ST
08/12/2025
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S3
08/11/2025
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S1
08/11/2025
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-S2
08/06/2025
Filed — Alteration
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213973-I1
08/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
08/06/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
08/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
08/06/2025
Special inspection requirement — Electrical motors and elevators
EUGENE BIFULCO
08/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
05/13/2025
Filed — Alteration
M01221596-I1
05/13/2025
Permit issued — Supported Scaffold
M01221596-I1-SF
04/22/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
04/22/2025
Special inspection requirement — Final
EUGENE BIFULCO
04/02/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01192429-P1
03/12/2025
Permit issued — Sidewalk Shed
M01192429-I1-SH
03/11/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01192429-I1
02/21/2025
Special inspection requirement — Final
ROSS ADAM COLE BRISKMAN
02/20/2025
Filed — Alteration
M01075059-P3
02/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/10/2025
Special inspection requirement — Final
ROSS ADAM COLE BRISKMAN
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding06/10/2026
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding05/07/2026
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/13/2026
DOB NOWPlumbingPermit IssuedAdvanced Plumbing Mechanical03/04/2026
DOB NOWStructuralSigned-offElysium Construction01/06/2026
DOB NOWGeneral ConstructionSigned-offElysium Construction01/06/2026
DOB NOWMechanical SystemsSigned-offElysium Construction01/05/2026
DOB NOWSprinklersPermit IssuedAdvanced Plumbing, Mechanical & Sprinkler08/21/2025
DOB NOWPlumbingPermit IssuedAdvanced Plumbing Mechanical08/20/2025
DOB NOWGeneral ConstructionSigned-offElysium Construction08/18/2025
DOB NOWMechanical SystemsSigned-offElysium Construction08/18/2025
DOB NOWStructuralSigned-offElysium Construction08/15/2025
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding05/13/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/12/2025
DOB NOWGeneral ConstructionSigned-offElysium Construction01/15/2025
DOB NOWGeneral ConstructionSigned-offElysium Construction09/16/2024
DOB NOWSprinklersSigned-offBuckmiller Automatic Sprinkler09/10/2024
DOB NOWGeneral ConstructionSigned-offAll City Remodeling09/06/2022
BISEQISSUEDUniversal Builders Supply11/21/2022
BISEQISSUEDUniversal Builders Supply11/30/2021
BISEQISSUEDUniversal Builders Supply12/21/2020
BISEQISSUEDUniversal Builders Supply01/07/2020
BISEQISSUEDUniversal Builders Supply01/09/2019
BISEQISSUEDEverest Scaffolding05/27/2015
BISEQISSUEDEverest Scaffolding05/26/2015
BISEQISSUEDAtlantic Heydt Scaffold01/22/1999
BISEQISSUEDAtlantic Heydt11/20/1998
BIS—ISSUEDNorma Kamali05/11/1992
1 project · most recent 07/30/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2026Signed-offElysium ConstructionAir Conditioning Systems
Cooling
Friedrich SH20M30B 21,000 BTU · Ptac ×1
1 project · most recent 07/30/2026
Sprinkler System
FiledStatusContractorScope
07/30/2026Permit IssuedAdvanced Plumbing, Mechanical & SprinklerSprinkler System
1 project · most recent 07/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedAdvanced Plumbing MechanicalGas, Storm, Water/Sanitary
3 projects · most recent 11/10/2025
General Wiring
FiledStatusContractorScope
11/10/2025Permit IssuedExecutive Electl ServicesGeneral Wiring
08/19/2025Permit IssuedDenali Electric—
03/06/2025Permit IssuedBorowide Elect'l Contractors—
1 project · most recent 07/30/2026
Steel Concrete
FiledStatusContractorScope
07/30/2026Permit IssuedAdvanced Plumbing MechanicalSteel, Concrete
1 project · most recent 04/02/2025
Sidewalk Shed
FiledStatusContractorScope
04/02/2025Signed-offAndamio ScaffoldingSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/03/2026Sprinkler SystemsEUGENE BIFULCOspecial
07/29/2026Sprinkler SystemsEUGENE BIFULCOspecial
03/05/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/05/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/05/2026FinalEUGENE BIFULCOprogress
03/05/2026Lighting controlsEUGENE BIFULCOenergy_progress
03/05/2026Interior lighting powerEUGENE BIFULCOenergy_progress
03/05/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
03/02/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/02/2026Lighting controlsEUGENE BIFULCOenergy_progress
03/02/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/02/2026FinalEUGENE BIFULCOprogress
03/02/2026Interior lighting powerEUGENE BIFULCOenergy_progress
03/02/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/06/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
08/06/2025Energy Code Compliance InspectionsEUGENE BIFULCOprogress
08/06/2025Maintenance informationEUGENE BIFULCOenergy_progress
08/06/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
08/06/2025Electrical motors and elevatorsEUGENE BIFULCOenergy_progress
08/06/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
04/22/2025Mechanical SystemsEUGENE BIFULCOspecial
04/22/2025FinalEUGENE BIFULCOprogress
02/21/2025FinalROSS ADAM COLE BRISKMANprogress
02/10/2025FinalROSS ADAM COLE BRISKMANprogress
09/27/2024Sprinkler SystemsEUGENE BIFULCOspecial
Latest 25 of 28.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026M01075059-P1Request digital key ↗
08/26/2026M01075059-P2Request digital key ↗
08/26/2026M01075059-P3Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION5
12/21/2020140818578Open ↗
01/08/2020140818578Open ↗
01/08/2019140818578Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
03/01/2024102239427Open ↗
03/01/2024101983588Open ↗
01/08/2019140818578Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026M01075059-P1Open ↗
08/26/2026M01075059-P2Open ↗
08/26/2026M01075059-P3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026M01213973-S1Open ↗
09/23/2026M01213973-S1Open ↗
08/31/2026M01213973-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01213973-S1Open ↗
08/31/2026M01213973-I1Open ↗
08/29/2026M01075059-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/08/2019140818578Open ↗
05/22/2015140351982Open ↗
05/21/2015140351492Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/08/2019140818578Open ↗
05/22/2015140351982Open ↗
05/21/2015140351492Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/08/2019140818578Open ↗
05/22/2015140351982Open ↗
05/21/2015140351492Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/05/2015140351492Open ↗
08/05/2015140351982Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/26/2026M01075059-I1Open ↗
08/26/2026M01075059-S1Open ↗
08/19/2026M01213973-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/22/2015140351982Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00796016-I1Open ↗
▸Energy Compliance1
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/21/2015140351492Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/11/2023140818578Open ↗
09/11/2023140818578Open ↗
01/08/2019140818578Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/01/2024102239427Open ↗
03/01/2024101983588Open ↗
09/12/2023140818578Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET3
01/08/2019140818578Open ↗
05/22/2015140351982Open ↗
05/21/2015140351492Open ↗