← Back
Large suburban residence
110-05 70 ROAD
QUEENS · BIN 4052525
💬 Discuss this project
1935Year Built
1.5Stories
A3Building Class
R1-2AZoning
2,212 sfGross Floor Area
1Units
Large suburban residence · 5,000 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 03/21/2025
General Wiring
FiledStatusContractorScope
03/21/2025CompleteGALLANT ELEC'L CONST, INCGeneral Wiring
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/05/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01165842-I1
01/28/2025
Permit issued — Solar
Q01165842-I1-SL
01/20/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01165842-I1
01/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRIS KIM
01/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRIS KIM
01/11/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRIS KIM
01/11/2025
Special inspection requirement — Final
CHRIS KIM
01/11/2025
Special inspection requirement — Air barrier - visual inspection
CHRIS KIM
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS KIM ENGINEERING PC101/20/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNATION SOLAR SYSTEMSGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARUN CORP8842101/20/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNATION SOLAR SYSTEMS01/28/2025
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/11/2025Fire-Resistant Penetrations and JointsCHRIS KIMspecial
01/11/2025Structural Stability – Alterations of existing buildingsCHRIS KIMspecial
01/11/2025Energy Code Compliance InspectionsCHRIS KIMprogress
01/11/2025FinalCHRIS KIMprogress
01/11/2025Air barrier - visual inspectionCHRIS KIMenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01165842-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026Q01165842-I1Open ↗
08/26/2026Q01165842-I1Open ↗
08/26/2026Q01165842-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q01165842-I1Open ↗
08/26/2026Q01165842-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01165842-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01165842-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01165842-I1Open ↗